I want to search for...
Permit #2012030711
Permit Details
Status: COED
| Parcel Id: 07-11-31-7025-000C1-0040 |
| Block: 000C1 |
| Subdivision: 2196 - ALBERTSONS #4469 |
| Job Phone: 386-206-3150 |
| Location Address: 1499 PALM COAST PKWY NW |
| Type: CIA - COMMERCIAL INTERIOR EXTERIOR ALTERATION |
| Issue Date: 05/08/2012 |
| NOC: Unknown |
| Applicant name: CHARLES M BURGAN III |
| Owner: ACROSS THE POND DEVELOPMENTS LLC |
|
Address 609 SOUTH RIDGEWOOD AVE DAYTONA BEACH, FL 32114 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤2,300.00 |
| Job Description: ADD A BATHROOM FOR "SCRUFFY MURPHY'S" |
| Type: CN |
Contractor
CHARLES BURGAN, LLC
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
1132 HARDY ST BUNNELL, FL 32110 |
CGC1512729 (Exp: 08/31/2026) | 386-206-3150 | 386-206-3150 |
Sub Contractors
JONATHAN P DUCEY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
505 WEST COURT STREET BUNNELL, FL 32110 |
CFC1427093 (Exp: 08/31/2026) | 386-503-6092 |
JOHN EDWARD GAMBONE
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
55 BARRISTER LN PALM COAST, FL 32137 |
ER13013466 (Exp: 08/31/2014) | 386-586-9144 | (386)246-6305 |
Inspection History
| Type | Request Date | Result | Inspector |
| PLUMBING FINAL | 05/22/2012 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 5/22/2012 3:34:32 PM APPROVED | |||
| BUILDING FINAL | 05/22/2012 | APPROVED - AS NOTED | CMINI |
| Note: utility not resulted yet | |||
| FIRE FINAL | 05/22/2012 | APPROVED | JHINDMAN |
| U - UTILITY COMMERCIAL FINAL | 05/22/2012 | FINAL APPROVED | DSPENCER |
| PLUMBING 2ND ROUGH | 05/15/2012 | APPROVED | RMARVEL |
| ELECTRIC 2ND ROUGH | 05/15/2012 | APPROVED | RMARVEL |
| MONOLITHIC SLAB | 05/15/2012 | APPROVED | RMARVEL |
| ABOVE CEILING | 05/15/2012 | APPROVED | RMARVEL |
| FRAMING | 05/14/2012 | APPROVED | RMARVEL |
| PLUMBING 1ST ROUGH | 05/14/2012 | APPROVED | RMARVEL |
Review History
| Department | Status | Date In | Date Out |
| PLUM | COMPLETE | 05/07/2012 | 05/07/2012 |
| BLD | COMPLETE | 05/07/2012 | 05/07/2012 |
| FI1 | COMPLETE | 05/07/2012 | 05/07/2012 |
| ELEC | COMPLETE | 04/03/2012 | 04/03/2012 |
| BLD | HOLD | 04/03/2012 | 04/03/2012 |
| Note: Previous hold comment need to be addressed. The dimensions provided are not ADA compliant. The space required for wheelchair to make 180-deegre turn is a clear space of 5 feet diameter or T-shape space of 3 feet. | |||
| PLUM | HOLD | 04/03/2012 | 04/03/2012 |
| Note: 1. Provide all dimensions and elevations in areas of improvements to show complaints to ADA accessibility and egress requirements. 2. Revise plumbing riser diagram to match the proposed plumbing layout including pipe sizes and material. Previous comments above need to be addressed. For item 1, the dimensions provided are not ADA compliant. The space required for wheelchair to make 180-deegre turn is a clear space of 5 feet diameter or T-shape space of 3 feet. Item 2 need to be addressed too. | |||
| UD1 | COMPLETE | 04/03/2012 | 04/03/2012 |
| FI1 | HOLD | 04/03/2012 | 04/03/2012 |
| Note: Provide all dimensions for the egress requirements. the hallway in the rear does not appear to be wide enough to meet code. | |||
| BLD | HOLD | 03/27/2012 | 03/27/2012 |
| Note: Provide all dimensions and elevations in areas of improvements to show complaints to ADA accessibility and egress requirements | |||
| ELEC | HOLD | 03/27/2012 | 03/27/2012 |
| Note: Provide electric service load calculations | |||
| FI1 | HOLD | 03/27/2012 | 04/02/2012 |
| Note: provide all dimensions to show egress requirements | |||
| PLUM | HOLD | 03/27/2012 | 03/27/2012 |
| Note: 1. Provide all dimensions and elevations in areas of improvements to show complaints to ADA accessibility and egress requirements. 2. Revise plumbing riser diagram to match the proposed plumbing layout including pipe sizes and material. | |||
| SW1 | COMPLETE | 03/27/2012 | 03/27/2012 |
| Note: No Stormwater review required ( Interieur alteration) | |||
| UD1 | HOLD | 03/27/2012 | 03/29/2012 |
| Note: Is food preparation or food service proposed in this facility? A dishwasher will typically require a grease interceptor installation. Please provide more information on the dishwasher use. | |||
| ZON | COMPLETE | 03/27/2012 | 03/27/2012 |
| Note: No zoning review needed. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMIN COMMERCIAL | ¤60.00 | 05/08/2012 |
| BUILDING DISCOUNT 100% | (¤344.48) | 05/08/2012 |
| ELECTRIC FEE | ¤61.38 | 05/08/2012 |
| FIRE PLANS REVIEW | ¤25.00 | 05/08/2012 |
| PERMIT FEE | ¤100.00 | 05/08/2012 |
| PLAN CHECK FEE | ¤100.00 | 05/08/2012 |
| PLUMBING FEE | ¤61.38 | 05/08/2012 |
| SITE PLAN 20 | ¤20.00 | 05/08/2012 |
| SURCHARGE FS 533.721 | ¤2.00 | 05/08/2012 |
| SURCHARGE - FS 468.631 | ¤2.00 | 05/08/2012 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤87.28 |