Permit #2012040053

Permit Details

Status: COED

Parcel Id: 07-11-31-7025-000G0-0210
Block: 000G0
Subdivision: -
Job Phone: 386-943-9433
Location Address: 85 CYPRESS POINT PKWY
Type: CIA - COMMERCIAL INTERIOR EXTERIOR ALTERATION
Issue Date: 07/03/2012
NOC: Unknown
Applicant name: AARON BENDER ALBERT
Owner: INTERNATIONAL CARPET OF FLORIDA LLC

Address

109 S. SIXTH ST

FLAGLER BEACH, FL 32136

Lot: 0210
Contracted Stated Job Value: ¤2,300.00
Job Description: UNIT 2 DIVISION WALL / BATHROOM WALLS - HOME FURNISHING CENTER, INC
Type: CN

Contractor

MCNEAL & WHITE CONTRACTORS, INC
Status Location Address State License Number Phone Fax
CANCEL

420 NORTH BOUNDARY AVE

DELAND, FL 32720

CGC1516617 (Exp: 08/31/2014) 386-943-9433 386-943-9434

Sub Contractors

JOHN CHARLES GRAY
Status Location Address State License Number Phone Fax
ACTIVE

2707 ANNETTE STREET

FLAGLER BEACH, FL 32136

CFC1425975 (Exp: 08/31/2026) (386)793-3690 (386)439-7585
WINFRED LAWRENCE DILL JR
Status Location Address State License Number Phone Fax
CANCEL

73 WENTWORTH LANE

PALM COAST, FL 32164

EC13002502 (Exp: 08/31/2014) (386)447-9360 (386)447-8704
CHARLES WEYANT
Status Location Address State License Number Phone
ACTIVE

PO BOX 1261

FLAGLER BEACH, FL 32136

CAC1815058 (Exp: 08/31/2026) (386)246-7745

Inspection History

Type Request Date Result Inspector
FIRE FINAL 12/12/2012 FINAL APPROVED JHINDMAN
Note: THIS IS A REINSPECTION
BUILDING FINAL 12/11/2012 APPROVED CMINI
Note: THIS IS A REINSPECTION
FIREWALL 12/10/2012 APPROVED JHINDMAN
Note: THIS IS A REINSPECTION
FIRE FINAL 12/07/2012 Disapproved - NO FEE JHINDMAN
Note: Inspection Resulted at 12/7/2012 12:25:44 PM NOT READY 2010 FBC 110.6
FIREWALL 12/07/2012 Disapproved -FEE REQUIRED JHINDMAN
Note: Inspection Resulted at 12/7/2012 12:25:43 PM 1. LABEL FIRE WALLS PER 2010 FBC 703.6. 2. SEAL ALLPENETRATIONS IN THE FIREWALLS PER 2010FBC 709.7.
U - UTILITY COMMERCIAL FINAL 12/07/2012 APPROVED DSPENCER
BUILDING FINAL 12/07/2012 Disapproved - NO FEE JHINDMAN
Note: Inspection Resulted at 12/7/2012 12:25:45 PM NOT READY 2010 FBC 110.6.
ELECTRIC FINAL 11/02/2012 APPROVED CMINI
Note: THIS IS A REINSPECTION
ELECTRIC FINAL 10/25/2012 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 10/25/2012 2:45:49 PM THIS WAS A POWER RELEASE INSPECTION,CHECK PANEL AND SERVICE FEEDERS FOR TORQURE.CALLED FPL AT 1:30 SPOKE WITH SUSAN...SUN COAST ELEC.
PLUMBING FINAL 10/25/2012 APPROVED CMINI
HVAC FINAL 10/25/2012 APPROVED CMINI
HVAC ROUGH 09/20/2012 APPROVED CMINI
Note: THIS IS A REINSPECTION
ELECTRIC 2ND ROUGH 09/20/2012 APPROVED CMINI
Note: THIS IS A REINSPECTION
ELECTRIC 2ND ROUGH 09/18/2012 Disapproved -FEE REQUIRED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 9/18/2012 2:54:50 PM NEED TO STRAP M.C. WITH IN 12" OF BOXES.NEC 330.30.....NEED TO STRAP EMT WITH IN 3`` OF BOXES NEC 358.30(A)AND (B)....NEED TO STRIP GROUNDS CORRECTLY IN BOXES...NEED TO SHOW ON PLANS ALL RECEPTACLES...OVER BENT CONDUCTORS...NEC 334. 24.....NEED TO SEPARATE WIRES IN PANEL...310.15(B)2.......ALL WORK NEED TO BE NEAT AND WORKMAN LIKE MANNER..110.12
FRAMING 09/18/2012 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 9/18/2012 2:54:54 PM NEED TO SHOW REVISION OR CORRECTION FOR DOUBLE DOOR REPLACED WITH SINGLE ,CHECK ON FINAL
HVAC ROUGH 09/18/2012 Disapproved -FEE REQUIRED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 9/18/2012 2:54:52 PM NEED LADDER TO CHECK ABOVE DUCT SEALING
PLUMBING 1ST ROUGH 09/18/2012 APPROVED CMINI
Note: THIS IS A REINSPECTION
PLUMBING 1ST ROUGH 08/22/2012 Disapproved - NO FEE RMARVEL
Note: THIS IS A REINSPECTION Inspection Resulted at 8/22/2012 12:43:11 PM PLUMBING LOCATIONS OF FIXTURES NEED TO MATCH APPROVED SET OF PLANS.
HVAC ROUGH 08/22/2012 Disapproved - NO FEE RMARVEL
Note: THIS IS A REINSPECTION Inspection Resulted at 8/22/2012 12:43:11 PM NEED LADDER TO CHECK FOR DUCT SEALING.
ELECTRIC 2ND ROUGH 08/22/2012 Disapproved - NO FEE RMARVEL
Note: THIS IS A REINSPECTION Inspection Resulted at 8/22/2012 12:43:12 PM NEED TO MATCH APPROVED SET OF PLANS.
FRAMING 08/22/2012 Disapproved -FEE REQUIRED RMARVEL
Note: THIS IS A REINSPECTION Inspection Resulted at 8/22/2012 12:43:09 PM BATHROOM FRAMING NEEDS TO MATCH PLANS.
FRAMING 07/23/2012 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 7/23/2012 3:42:55 PM ANCHORING AND SCREWS FOR FIRE WALL STUDS COMPLETE..ALL OTHER FRAMING NEEDS TO BE INSPECTED.
FRAMING 07/19/2012 Disapproved -FEE REQUIRED RMARVEL
Note: Inspection Resulted at 7/19/2012 4:42:42 PM MISSING SCREWS ON STUDS TO BOTTOM PLATE AND TAPCONS IN BOTTOM PLATE PER PLANS.

Review History

Department Status Date In Date Out
BLD COMPLETE 12/05/2012 12/05/2012
FI1 COMPLETE 12/05/2012 12/05/2012
BLD HOLD 10/26/2012 10/26/2012
Note: 1. Provide product approval for the new rated door. 2010 FBC 1715 .5.2.
FI1 HOLD 10/26/2012 10/26/2012
Note: 1. provide product approval for the new rated door. 2010 FBC 1715.5.2.
BLD COMPLETE 09/14/2012 09/14/2012
MECH COMPLETE 09/07/2012 09/07/2012
Note: Revision - added locking access cap on freon access port at CU-1.
UD1 COMPLETE 09/07/2012 09/07/2012
ZON COMPLETE 09/07/2012 09/14/2012
BLD HOLD 09/07/2012 09/07/2012
Note: 1. provide Florida product approval and installation instructions for the new door. per 2010 FBC 1609.6. 2. provide detail that was removed from the electric page for the anchorage of the platform above the bathroom 2010 FBC 107.2.1.
ELEC COMPLETE 09/07/2012 09/07/2012
FI1 COMPLETE 09/07/2012 09/07/2012
PLUM COMPLETE 09/07/2012 09/07/2012
Note: Revision - water riser diagram
SW1 COMPLETE 09/07/2012 09/07/2012
MECH COMPLETE 08/01/2012 08/02/2012
Note: Revision-relocated AHU
MECH COMPLETE 06/26/2012 06/26/2012
ELEC COMPLETE 06/26/2012 06/26/2012
Note: no change
ELEC COMPLETE 06/13/2012 06/14/2012
MECH HOLD 06/13/2012 06/14/2012
Note: Provide hvac unit sizing calculations for heating and cooling loads per 2010 Energy Conservation Section 503.2.1. Provide specifications and duct layout for toilet exhaust Provide information or layout how condesate will be discharged. list all sub contractors plumb. mech, and electric and will need to be added to permit Fred Reodica
ZON -SELECT ST 06/06/2012 06/06/2012
BLD COMPLETE 06/06/2012 06/06/2012
ELEC HOLD 06/06/2012 06/06/2012
Note: Provide service riser detail with conductor sizes and grounding source
FI1 COMPLETE 06/06/2012 06/06/2012
MECH HOLD 06/06/2012 06/06/2012
Note: 1. Previous hold comments need to be addressed including energy calculations.
PLUM COMPLETE 06/06/2012 06/06/2012
MECH HOLD 04/30/2012 04/30/2012
Note: 1. Provide hvac contractor in the permit application. 2. Provide specifications of air handling unit, condenser unit , toilet exhaust fan and duct material. 3. Provide support details for duct and air handling unit. 4. Provide the required outside air ventilation calculation based on FMC 2010 Table 403.3. 5. Outside air shall be taken from the outside of the building and not from the warehouse. Revise layout. 6. Provide condensate drain detail or indicate on plan how those consensate drain would be discharged. 7. Hvac plan shall have signature and license number of hvac contractor.
PLUM HOLD 04/30/2012 04/30/2012
Note: 1. Provide domestic water riser diagram and material specification.
BLD HOLD 04/30/2012 04/30/2012
Note: 1. provide lintel type, reinforcing steel anchoring and attachment details for the new block opening
ELEC HOLD 04/30/2012 04/30/2012
Note: Provide service riser detail with conductor sizes and grounding source
FI1 HOLD 04/30/2012 04/30/2012
Note: The occupant load for mercantile on a street level occupancy is 30 sq. ft. per person please revise occupant load accordingly.
ELEC HOLD 04/27/2012 04/30/2012
Note: Provide service riser detail with conductor sizes and grounding source
BLD HOLD 04/27/2012 04/30/2012
Note: 1. provide lintel type, reinforcing steel anchoring and attachment details for the new block opening
FI1 HOLD 04/27/2012 04/30/2012
Note: The occupant load for mercantile on a street level occupancy is 30 sq. ft. per person please revise occupant load accordingly.
BLD HOLD 04/03/2012 04/03/2012
Note: Provide HVAC contractor doing the work, provide energy calculations, duct layout, and specifications provide ADA elevations for rest rooms, provide plumbing contractor doing the work, provide plumbing riser detail, provide fixture schedule, provide all dimensions of all rooms ,provide all added wall details, provide detail of opening between units
ELEC HOLD 04/03/2012 04/03/2012
Note: Provide electric sub-contractor doing the work, provide load calculations, provide panel location, provide panel schedule, provide fixture schedule
FI1 HOLD 04/03/2012 04/03/2012
Note: 1. provide all room dimensions on the plans. 2. provide correct occupant load per table 7.3.2.1 of the Florida Fire Prevention Code. 3. Define the hazard of contents per 6.2.1.2 of the Florida Fire Prevention code. 4. Provide a layout of all shelving racks, any counters and fixtures.
SW1 COMPLETE 04/03/2012 04/03/2012
Note: no review required (Building interieur alteration)
UD1 COMPLETE 04/03/2012 04/03/2012
ZON COMPLETE 04/03/2012 04/04/2012
Note: No zoning review required.
ELEC HOLD 06/06/2012
Note: Provide service riser detail with conductor sizes and grounding source
MECH HOLD 06/06/2012
Note: 1. Previous hold comments need to be addressed including energy calculations.
MECH HOLD 06/06/2012
Note: 1. Previous hold comments need to be addressed including energy calculations.
MECH HOLD 06/06/2012
Note: 1. Previous hold comments need to be addressed including energy calculations.
ELEC HOLD 06/06/2012
Note: Provide service riser detail with conductor sizes and grounding source
MECH HOLD 06/06/2012
Note: 1. Previous hold comments need to be addressed including energy calculations.
ZON COMPLETE 06/07/2012

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 12/18/2012
REINSPECTION FEE ¤40.00 12/18/2012
REINSPECTION FEE ¤40.00 12/18/2012
REINSPECTION FEE ¤40.00 12/18/2012
REINSPECTION FEE ¤40.00 12/18/2012
REVISION ¤40.00 12/18/2012
REVISION ¤40.00 12/18/2012
REVISION ¤40.00 12/18/2012
REVISION ¤40.00 12/18/2012
REVISION ¤40.00 12/18/2012
REVISION ¤40.00 12/18/2012
SITE PLAN 20 ¤20.00 07/03/2012
SURCHARGE FS 533.721 ¤2.00 07/03/2012
SURCHARGE - FS 468.631 ¤2.00 07/03/2012
ADMIN COMMERCIAL ¤60.00 07/03/2012
BUILDING DISCOUNT 100% (¤399.73) 07/03/2012
ELECTRIC FEE ¤61.38 07/03/2012
FIRE PLANS REVIEW ¤25.00 07/03/2012
MECHANICAL FEE ¤61.38 07/03/2012
PERMIT FEE ¤100.00 07/03/2012
PLAN CHECK FEE ¤100.00 07/03/2012
PLUMBING FEE ¤61.38 07/03/2012
Fees Total Due: ¤0.00 Total Paid: ¤533.41