I want to search for...
Permit #2012100025
Permit Details
Status: FINAL
| Parcel Id: 33-11-31-3060-00030-0540 |
| Block: 00030 |
| Subdivision: 2106 - HIDDEN LAKES, PHASE 1 |
| Job Phone: (386)566-5274 |
| Location Address: 84 ARENA LAKE DR |
| Type: PO - POOL |
| Issue Date: 10/31/2012 |
| NOC: RECORDED |
| Applicant name: RALPH T LEE JR |
| Owner: SHELLEY, BRYAN P & DARLENE L |
|
Address 47 MAXIM DRIVE FORKED RIVER, NJ 08731 |
| Lot: 0540 |
| Contracted Stated Job Value: ¤35,000.00 |
| Job Description: SWIMMING POOL WITH SCREEN |
| Type: CN |
Contractor
AQUATIC DESIGN SYSTEMS INC
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
2090 S. NOVA RD SOUTH DAYTONA, FL 32119 |
UNIT AA 01 BOX 13 SOUTH DAYTONA, FL 32119 |
CPC1457500 (Exp: 08/31/2016) | (386)566-5274 | (386)767-3523 |
Sub Contractors
DAVID CASH
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
45 SOUTH DIXIE HIGHWAY ST. AUGUSTINE, FL 32084 |
01613 (Exp: 08/31/2014) | (386)437-3433 | 904-829-1844 |
JOHN WAYNE YANEY II
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1812 TRAVELERS PALM DR. EDGEWATER, FL 32132 |
EC13003852 (Exp: 08/31/2020) | 386-427-5687 | 386-424-9652 |
TODD MICHAEL ORIE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
560 S. YONGE ST. ORMOND BEACH, FL 32174 |
CBC036417 (Exp: 08/31/2026) | (386)673-4589 | (386)673-8045 |
Inspection History
| Type | Request Date | Result | Inspector |
| GAS FINAL | 02/06/2013 | APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION | |||
| POOL FINAL | 02/06/2013 | FINAL APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | 02/05/2013 | APPROVED | DSPENCER |
| GAS FINAL | 02/05/2013 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: Inspection Resulted at 2/5/2013 2:50:42 PM WORK IN PROGRESS. UNABLE TO FINAL. | |||
| POOL FINAL | 02/05/2013 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: Inspection Resulted at 2/5/2013 2:50:42 PM WORK IN PROGRESS UNABLE TO FINAL. | |||
| GAS ROUGH | 02/01/2013 | APPROVED | RMARVEL |
| FINAL SURVEY (OFFICE USE ONLY) | 01/24/2013 | APPROVED | JHINDMAN |
| ROW DAMAGE | 01/23/2013 | APPROVED | RGROSS |
| ELECTRIC AND ALARM | 01/18/2013 | APPROVED - AS NOTED | RMARVEL |
| Note: Inspection Resulted at 1/18/2013 2:30:52 PM MISSING A KO PLUG IN SIDE OF TIMER | |||
| POOL DECK | 11/28/2012 | APPROVED | RMARVEL |
| STEEL AND GROUND | 11/05/2012 | APPROVED | RMARVEL |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 01/24/2013 | 01/24/2013 |
| Note: Released By: JHINDMAN final survey | |||
| SW1 | COMPLETE | 01/24/2013 | 01/24/2013 |
| Note: Released By: JHINDMAN final survey | |||
| BLD | COMPLETE | 12/18/2012 | 12/18/2012 |
| SW1 | HOLD | 12/18/2012 | 12/18/2012 |
| Note: 1. provide a revised site plan. | |||
| ZON | HOLD | 12/18/2012 | 12/20/2012 |
| Note: Provide a corrected site plan to show new deck dminsension and setbacks. | |||
| ZON | COMPLETE | 10/31/2012 | 10/31/2012 |
| BLD | COMPLETE | 10/30/2012 | 10/30/2012 |
| ZON | HOLD | 10/30/2012 | 10/30/2012 |
| Note: Remove equipment pad from 10ft drainage easement. | |||
| BLD | HOLD | 10/24/2012 | 10/24/2012 |
| Note: 1. Provide the manufacturers specifications on the pool heater that includes the model number and btu information. 2010 FBC 107.2.1. 2. Provide gas riser and subcontrator or have the gas contractor provide a seperate permit. 2010 FBC 107.2.1. | |||
| ZON | HOLD | 10/24/2012 | 10/27/2012 |
| Note: Remove equipment pad from 10ft drainage easement. | |||
| BLD | HOLD | 10/01/2012 | 10/02/2012 |
| Note: 1. Provide screen plans an layout. 2010 FBC107.2.1 2. Provide pool heater specifications and include electrical calculations if it is electric. 2010 FBC 107.2.1.3. Revise TDH form to show the heater. 2010 FBC 107.2.1.4. Provide calculations to show APSP15 compliance. 2010 FBC energy 403.9. | |||
| SW1 | COMPLETE | 10/01/2012 | 10/01/2012 |
| ZON | HOLD | 10/01/2012 | 10/08/2012 |
| Note: Remove equipment pad from 10ft drainage easement. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 02/05/2013 |
| REINSPECTION FEE | ¤40.00 | 02/05/2013 |
| REVISION | ¤40.00 | 01/24/2013 |
| SITE PLAN 20 | ¤20.00 | 10/31/2012 |
| SURCHARGE FS 533.721 | ¤2.00 | 10/31/2012 |
| SURCHARGE - FS 468.631 | ¤2.00 | 10/31/2012 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/31/2012 |
| CONTRACTOR CHANGE | ¤40.00 | 10/31/2012 |
| BUILDING DISCOUNT 100% | (¤198.00) | 10/31/2012 |
| PERMIT FEE | ¤180.00 | 10/31/2012 |
| PLAN CHECK FEE | ¤40.00 | 10/31/2012 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤286.00 |