I want to search for...
Permit #2013020467
Permit Details
Status: COED
| Parcel Id: 07-11-31-7025-000G0-0210 |
| Total Square Footage: 940 sqft |
| Subdivision: - |
| Job Phone: 386-338-7785 |
| Location Address: 85 CYPRESS POINT PKWY |
| Type: CIA - COMMERCIAL INTERIOR EXTERIOR ALTERATION |
| Issue Date: 05/29/2013 |
| NOC: RECORDED |
| Applicant name: THOMAS M SCAGLIONE |
| Owner: INTERNATIONAL CARPET OF FLORIDA LLC |
|
Address 101 OCEAN WAY N PALM COAST , FL 32137 |
| Contracted Stated Job Value: ¤25,000.00 |
| Job Description: SUITE 9 INTERIOR BUILDOUT FOR RESTAURANT-- "FOCACCIA" |
| Type: CN |
Contractor
T-CON GROUP, INC.
| Status | Location Address | State License Number | Phone |
| CANCEL |
3246 NORTH POWERLINE ROAD POMPANO BEACH, FL 33069 |
CBC1251999 (Exp: 08/31/2020) | 954-825-8369 |
Sub Contractors
PETER JOSEPH LYDEN
| Status | Location Address | State License Number | Phone |
| CANCEL |
17 UNIMAY CT BUNNELL, FL 32110 |
EC0002436 (Exp: 08/31/2022) | 386-931-2568 |
RICHARD LEE VONBROCKEN
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
1738 STATE AVE HOLLY HILL, FL 32117 |
CAC035516 (Exp: 08/31/2026) | (386)672-1950 | (386)672-1952 |
IAN MICHEAL JOHNSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
4244 JACKSON STREET PORT ORANGE, FL 32127 |
CCC1325915 (Exp: 08/31/2026) | 386-760-0764 | 386-760-3080 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
Inspection History
| Type | Request Date | Result | Inspector |
| PLUMBING FINAL | 09/10/2013 | APPROVED | CMINI |
| Note: PER OWNER | |||
| HVAC FINAL | 09/10/2013 | APPROVED | CMINI |
| ELECTRIC FINAL | 09/10/2013 | APPROVED | CMINI |
| MONOLITHIC SLAB | 09/10/2013 | APPROVED | CMINI |
| ABOVE CEILING | 09/10/2013 | APPROVED | CMINI |
| BUILDING FINAL | 09/10/2013 | APPROVED | CMINI |
| FIRE FINAL | 09/10/2013 | FINAL APPROVED | JHINDMAN |
| U-GREASE INTERCEPTOR FLOW/DYE TESTED | 09/10/2013 | APPROVED | DSPENCER |
| U - UTILITY COMMERCIAL FINAL | 09/10/2013 | APPROVED | DSPENCER |
| ELECTRIC - EARLY POWER | 08/27/2013 | APPROVED | CMINI |
| Note: all safed off,called fpl to release power | |||
| FRAMING | 07/03/2013 | APPROVED | CMINI |
| ELECTRIC 1ST ROUGH | 07/03/2013 | APPROVED | CMINI |
| HVAC ROUGH | 07/03/2013 | APPROVED | CMINI |
| PLUMBING 1ST ROUGH | 07/03/2013 | APPROVED | CMINI |
| PLUMBING 2ND ROUGH | 07/03/2013 | APPROVED | CMINI |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 05/24/2013 | 05/28/2013 |
| FI1 | COMPLETE | 05/24/2013 | 05/29/2013 |
| BLD | COMPLETE | 05/21/2013 | 05/21/2013 |
| Note: Released By: JMCGOWEN | |||
| MECH | COMPLETE | 05/21/2013 | 05/21/2013 |
| Note: Released By: FREODICA | |||
| MECH | HOLD | 05/15/2013 | 05/16/2013 |
| Note: Previous hold comment below shall be addressed - 1. Support details for AHU and condensing unit shown on hvac plan signed by hvac contractor shall be deleted as design of these supports are beyond the scope of their license per 2010 FBC 107.2.1. | |||
| FI1 | HOLD | 05/15/2013 | 05/20/2013 |
| Note: Held By: JMCGOWEN The new plans show a B vent but the manufacturers statement calls for their extra large hood. NFPA96 | |||
| BLD | HOLD | 05/15/2013 | 05/15/2013 |
| Note: Held By: JMCGOWEN | |||
| PLUM | COMPLETE | 05/15/2013 | 05/16/2013 |
| ZON | HOLD | 05/15/2013 | 05/17/2013 |
| Note: Revise plans adding screening for A/C unit. Elevations show unit is insufficiently screened from the public view on the east elevation. | |||
| ELEC | COMPLETE | 05/02/2013 | 05/02/2013 |
| PLUM | HOLD | 05/02/2013 | 05/02/2013 |
| Note: Previous comments shall be addressed - - Provide men’s and women’s restrooms that are ADA compliant per FPC chapter 4 and FBCA chapter 6. - Sanitary and domestic water riser diagrams are still incomplete. Coordinate with plans and resubmit corection per 2010 FBC 107.2.1. | |||
| FI1 | HOLD | 05/02/2013 | 05/02/2013 |
| Note: 1. Provide pizza ovens manufacturers specifications that show the hood and venting. The new plans show a B vent but the manufacturers statement calls for their extra large hood. NFPA96 | |||
| BLD | HOLD | 05/02/2013 | 05/02/2013 |
| Note: 1. Provide a roof subcontractor for the roof work. 2010 FBC 107.2.1. | |||
| MECH | HOLD | 05/02/2013 | 05/02/2013 |
| Note: 1. Support details for AHU and condensing unit shown on hvac plan signed by hvac contractor shall be deleted as design of these supports are beyond the scope of their license per 2010 FBC 107.2.1. | |||
| UD1 | COMPLETE | 05/02/2013 | 05/07/2013 |
| Note: A CO hold is on place until additional utility fees and required forms are submitted | |||
| ZON | HOLD | 05/02/2013 | 05/03/2013 |
| Note: Provide architectuals to show the roof top a/c units are being screen by building parapet. | |||
| ZON | HOLD | 04/10/2013 | 04/11/2013 |
| Note: Need to modify development order to show a/c mounted on roof. Provide an elevations of all sides showing screening for proposed roof mounted a/c. | |||
| UD1 | HOLD | 04/09/2013 | 04/11/2013 |
| Note: 1. Provide completed DBPR form 2. Additional capacity fees will be required. Fees were paid for retail/ office use for these units. Contact Utility Department for information on fees and DBPR form at 386-986-2355 | |||
| FI1 | HOLD | 04/09/2013 | 04/10/2013 |
| Note: 1. Provide the correct occupant load (kitchen areas are factored at 100 sq ft per person). 2010 FFPC ch 6. 2. On sheet A2 Provide the correct Life Safety Code NFPA number. (it is 101 not 102). 3. Provide the exhaust hood specifications that show the size of the exhaust duct and where it will exit the building. Provide any structural drawings needed to modify the building for the exhaust termination. NFPA 96. | |||
| BLD | HOLD | 04/09/2013 | 04/10/2013 |
| Note: 1. Provide signed and sealed drawings for the air handler support. 2010 FBC 107.2.1. 2. Provide a roofing subcontractor for the roof modifications. 3. Provide details on the plans for how the exhaust hood duct is terminated to the outside. 2010 FBC 107.2.1. | |||
| MECH | HOLD | 04/09/2013 | 04/10/2013 |
| Note: Previous comments items1and 3 shall be addressed - 1. Provide separate permit application for pizza hood oven per 2010 FBC 107.2.1/107.3.5. 3. Provide support details for AHU and duct per 2010 FBC 107.2.1. Note: On item 3, the submitted plan signed by licensed hvac contactor shows supporting details for ducts and AHU. Those details shall be signed and sealed by an engineer. Also, hvac consultant on the plan title block shall be deleted. An engineer or hvac contractor is allowed to design hvac duct system per 2010 FBC 107.1. | |||
| ELEC | HOLD | 04/09/2013 | 04/09/2013 |
| Note: Provide signature and seal on copy righted drawing, provide legible symbols and legend on drawing FBC 107.2.1 | |||
| PLUM | HOLD | 04/09/2013 | 04/10/2013 |
| Note: Provide men’s and women’s restrooms that are ADA compliant per FPC chapter 4 and FBCA chapter 6, provide water incoming water size and division from cold water to water heater FBC 107.2.1 | |||
| BLD | HOLD | 02/21/2013 | 02/25/2013 |
| Note: 1. Provide the correct occupancy type per 2010 FBC 309. 2. Include the kitchen and service areas in the load calculation 2010 FFPC 101 7.3.1.2. 3. The rear hallway does not meet 2010 ADA for maneuvering clearances per Figure 404.2.4.1 (d). 4. The accessible toilet room door cannot obstruct the hallway more than 7 inches when fully open per 2010 FBC 1008.1.9.11. 5. Provide a detail for bracing the top of the walls to the structure 2010 FBC 107.2.1. 6. Provide complete pizza oven specifications including the ventilation requirements 2010 FBC 107.2.1. 7. Provide exhaust hood location with dimensions on the plans. 2010 FBC 107.2.1. 8. Additional comments may be required after these corrections have been made. | |||
| ELEC | HOLD | 02/21/2013 | 02/25/2013 |
| Note: 1. Provide or indicate existing service receptale outlet(s) with-in 25 feet of HVAC condensing unit and Air Handling Unit. NEC 210.63 2. Provide lighting lay out and fixture specification(s). FBC 107.2.1 3. Provide revised load calculations for added service receptacles as needed. NEC 220.14(I) | |||
| FI1 | HOLD | 02/21/2013 | 02/25/2013 |
| Note: 1. Provide the correct occupancy type per 2010 FFPC ch 6. 2. Include the kitchen and service areas in the load calculation. 2010 FFPC 101 7.3.1.2. Provide the correct NFPA code on plans. ( 101 not 102 ). | |||
| MECH | HOLD | 02/21/2013 | 02/25/2013 |
| Note: 1. Provide separate permit application for pizza hood oven per 2010 FBC 107.2.1/107.3.5. 2. Provide location of condenser units on plan. If they are located on roof, the detail shown od plan shall be signed and sealed by engineer per 2010 FBC 107.2.1. 3. Provide support details for AHU and duct per 2010 FBC 107.2.1. | |||
| PLUM | HOLD | 02/21/2013 | 02/26/2013 |
| Note: 1. The door at accessible unisex toilet shall comply with 2010 ADA for maneuvering clearances per Figure 404.2.4.1 (d). 2. The accessible toilet room door cannot obstruct the hallway more than 7 inches when fully open per 2010 FBC 1008.1.9.11. 5. 3. Sanitary riser diagram shows mop sink tied into a wet vented horizontal branch of bathroom group which is not allowed per 2010 FBC P 909.1. 4. For clarity, provide fixture/equipment names at domestic water riser diagram as most of them are missing per 2010 FBC 107.2.1. Also provide information on the source of hot water and show or indicate on plan. 5. Provide material specifications of DWV and domestic hot/cold water per 2010 FBC P 702/605 | |||
| UD1 | HOLD | 02/21/2013 | 02/21/2013 |
| Note: 1. Connect hand sinks in food prep area to grease line. 2. Provide completed DBPR form 3. Additional capacity fees will be required. Fees were paid for retail/ office use for these units. Contact Utility Department for information on fees and DBPR form at 386-986-2355 | |||
| ZON | COMPLETE | 02/21/2013 | 02/22/2013 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMIN COMMERCIAL | ¤60.00 | 05/29/2013 |
| INSPECTION - COMMERCIAL ADD | ¤175.00 | 05/29/2013 |
| CONTRACTOR CHANGE | ¤40.00 | 05/29/2013 |
| CONTRACTOR CHANGE | ¤80.00 | 05/29/2013 |
| ELECTRIC FEE | ¤75.00 | 05/29/2013 |
| FIRE PLANS REVIEW | ¤25.00 | 05/29/2013 |
| MECHANICAL FEE | ¤75.00 | 05/29/2013 |
| PLAN CHECK FEE | ¤100.00 | 05/29/2013 |
| PLUMBING FEE | ¤75.00 | 05/29/2013 |
| SITE PLAN 20 | ¤20.00 | 05/29/2013 |
| SURCHARGE FS 533.721 | ¤8.40 | 05/29/2013 |
| SURCHARGE - FS 468.631 | ¤8.40 | 05/29/2013 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤741.80 |