I want to search for...

Permit #2013030355

Permit Details

Status: COED

Parcel Id: 07-11-31-7015-00030-0160
CONDITIONED SPACE: 1862 sqft
GARAGE: 540 sqft
OPENED PORCH (WITH ROOF) : 64 sqft
SCREEN PORCH (SOLID ROOF) : 358 sqft
Total Square Footage: 2824 sqft
Block: 00030
Subdivision: 2194 - SECTION 15-COUNTRY CLUB COVE
Job Phone: (386)445-9393
Location Address: 121 CIMMARON DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 04/05/2013
NOC: RECORDED
Applicant name: ANTONIO AMARAL JR
Owner: DASILVA NEREU FERREIRA

Address

4804 APTO 801

GUARARAPES PE BRASIL, 0

Address

CANDEIAS JABOATAO DOS

GUARARAPES PE BRASIL, 0

Lot: 0160
Contracted Stated Job Value: ¤18,500.00
Job Description: SINGLE FAMILY
Type: CN

Contractor

AMARAL CUSTOM HOMES INC.
Status Location Address State License Number Phone Fax
CANCEL

13 Utility Drive

PALM COAST, FL 32135

CBC058062 (Exp: 08/31/2020) (386)445-9393 (386)446-0403

Sub Contractors

RICHARD H SIMMONS JR
Status Location Address State License Number Phone Fax
CANCEL

P. O. Box 1963

Bunnell, FL 32110

ET11000823 (Exp: 09/09/2016) (386) 437-0607 (386)437-1847
PAUL S AIELLO
Status Location Address State License Number Phone Fax
CANCEL

PO BOX 351926

PALM COAST, FL 32137

CAC1815808 (Exp: 08/31/2016) (386)239-0053 (386)323-1955
GLEN WILLIAM KEHLE
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 353511

BUNNELL, FL 32110

CFC057241 (Exp: 08/31/2026) (386) 447-4249 (386) 437-8488
ANTONIO JR AMARAL
Status Location Address State License Number Phone Fax
CANCEL

13 Utility Drive

PALM COAST, FL 32137

CCC058004 (Exp: 08/31/2018) (386)445-9393 (386)446-0403

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 10/02/2013 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 10/2/2013 8:44:55 AM UTILITY OUT
ROW FINAL 10/02/2013 APPROVED GLALIMA
U -UTILITY RESIDENTIAL FINAL 10/02/2013 FINAL APPROVED DSPENCER
BLD - BUILDING FINAL 10/01/2013 Disapproved -FEE REQUIRED CMINI
Note: Inspection Resulted at 10/1/2013 2:46:37 PM MISSING SMOKE DETECTOR PER PLANS IN BED ROOM...JACUZZI SPA POWER NEEDS TO BE ON GFCI NEC .680.43(2)..A/C CONDENSING UNIT BREAKER TO LARGE FOR WHAT MOCP IS CALLING FOR...ARC FAULT CIRCUIT INTERUPTERS NEED TO BE ON ALL 120 VOLT CIRCUITS NEC 210.12(B)..MISSING WORKING LIGHT IN ATTIC...NEC..210.70. MISSING WORKING LIGHT IN KIT NOOK PER PLAN.NEED TO REMOVE TEMP POLE SAFLEY
FINAL APRON (AFTER POUR/DRIVEWAY) 09/30/2013 APPROVED GLALIMA
Note: THIS IS A REINSPECTION
ROW DAMAGE 09/30/2013 APPROVED GLALIMA
Note: THIS IS A REINSPECTION
STORMWATER FINAL 09/27/2013 APPROVED RMARVEL
Note: THIS IS A REINSPECTION
STORMWATER FINAL 09/23/2013 Disapproved -FEE REQUIRED RMARVEL
Note: Inspection Resulted at 9/23/2013 3:31:13 PM PROVIDE FINAL SURVEY FOR INSPECTION. UNABLE TO LOCATE IN JOB BOX.
ROW DAMAGE 09/23/2013 Disapproved - NO FEE GLALIMA
Note: NEED TO MOVE WOOD CHIPS BACK AWAY FROM CULVERT ENDS AND REPLACE WITH SOD. OTHER WOOD CHIPS ARE BELOW CONCRETE AT EDGE OF DRIVEWAY. YOU SHOULD REMOVE WOOD CHIPS AND ADD FILL THAT PLACE WOOD CHIPS BACK .. YOU WILL HAVE EROSION IF NOT .
FINAL APRON (AFTER POUR/DRIVEWAY) 09/23/2013 Disapproved -FEE REQUIRED GLALIMA
Note: NO SWALE SHEET TO CHECK ELEVATION. NEED TO MAKE ROAD REPAIRS AND REMOVE 1X6 AT ROAD EDGE / END OF DRIVEWAY . WILL CHECK YOUR FINAL SURVEY WITH SWALE SHEET
ELECTRIC - EARLY POWER 09/11/2013 APPROVED RMARVEL
FINAL SURVEY (OFFICE USE ONLY) 09/09/2013 APPROVED JHINDMAN
PRE-APRON (PRE-POUR/DRIVEWAY) 08/14/2013 APPROVED - AS NOTED GLALIMA
Note: THIS IS A REINSPECTION GARY LALIMA " INSPECTION WAS PERFORMED ON AUG 13th 2013 AFTER I SPOKE WITH BUILBER / OWNER . READY TO POUR
PRE-APRON (PRE-POUR/DRIVEWAY) 08/12/2013 Disapproved -FEE REQUIRED GLALIMA
Note: TOOK PICTURES OF PERMIT BOX / PACKAGE COULD NOT FINED '''' SWALE SHEET '''' FAILED
GRAVITY SEWER TEST 07/12/2013 APPROVED DROCKWELL
Note: THIS IS A REINSPECTION
GRAVITY SEWER TEST 07/11/2013 CANCELLED BY APPLICANT DROCKWELL
U - SEWER TIE IN 07/11/2013 APPROVED DSPENCER
INSULATION 06/18/2013 APPROVED DROCKWELL
LATH/BRICK/ WATER BARRIER 06/14/2013 APPROVED DROCKWELL
ALL ROUGH 06/11/2013 APPROVED - AS NOTED DROCKWELL
Note: PER TONY Inspection Resulted at 6/11/2013 12:51:59 PM PLUG UN-USED OPENING IN PANEL/PROTECT LOW VOLT WIRING/CHECK ALL THREADED RODS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/31/2013 APPROVED - AS NOTED DROCKWELL
Note: Inspection Resulted at 5/31/2013 2:39:43 PM MISSING PLY-CLIPS IN MANY AREAS SEE MASTER BED AREA-PROVIDE SOLID BLOCKING WHERE CLIPS ARE MISSING OF WAY OFF CENTER CHECK ALL DECKING./ TIGHTEN THREADED RODS AFTER LOADING ROOF-ALL LOOSE
TIE BEAM / LINTEL 05/10/2013 APPROVED DROCKWELL
Note: THIS IS A REINSPECTION
TIE BEAM / LINTEL 05/09/2013 Disapproved -FEE REQUIRED DROCKWELL
Note: REQUESTED BY TONY Inspection Resulted at 5/9/2013 12:42:58 PM VENT THRU LINTEL IS NOT ATTACHED/GLUED AS REQUIRED.
FOUND SURVEY APPROVED (OFFICE) 05/08/2013 APPROVED JHINDMAN
ELECTRIC TEMP POLE 04/25/2013 APPROVED DROCKWELL
MONOLITHIC SLAB 04/25/2013 APPROVED DROCKWELL
PLUMBING 1ST ROUGH UNDERGROUND 04/22/2013 APPROVED DROCKWELL
Note: per toni

Review History

Department Status Date In Date Out
SW1 COMPLETE 09/09/2013 09/09/2013
Note: Released By: JHINDMAN final survey
ZON COMPLETE 09/09/2013 09/09/2013
Note: Released By: JHINDMAN final survey
SW1 COMPLETE 07/12/2013 07/12/2013
ZON COMPLETE 07/12/2013 07/16/2013
ZON COMPLETE 05/08/2013 05/08/2013
Note: Released By: JHINDMAN foundation survey
SW1 COMPLETE 05/08/2013 05/08/2013
Note: Released By: JHINDMAN foundation survey
PLUM COMPLETE 04/05/2013 04/05/2013
PLUM HOLD 04/05/2013 04/05/2013
Note: There are two (2) sanitary riser diagrams submitted for this job. The original one which was shown on floor plan was signed and sealed by design professional but was put on hold for not matching with plan. The other one was submitted later by a plumbing contractor on a separate sheet and it matched with floor plan. If the latest would be used, the original submittal should be deleted for clarification per 2010 FBC 107.2.1.
SW1 COMPLETE 04/03/2013 04/04/2013
PLUM HOLD 04/03/2013 04/05/2013
Note: Sanitary riser diagram does not match with plan. Coordinate and submit correction per 2010 FBC 107.2.1.
ZON COMPLETE 04/03/2013 04/04/2013
PLUM HOLD 03/27/2013 03/27/2013
Note: Submitted correction on sanitary riser diagram does not match with floor plan. Resubmit correction per 2010 FBC 107.2.1.
BLD COMPLETE 03/27/2013 03/27/2013
SW1 HOLD 03/27/2013 03/27/2013
Note: 1. provide existing and proposed elevations on the site plan to show the lot drainage.
ELEC COMPLETE 03/27/2013 03/27/2013
ZON HOLD 03/27/2013 03/27/2013
Note: Revise site plan to provide the dimension and setback of the purposed driveway Revise site plan to remove the circular portion driveway from easement. Revise color sheet to show a correct color name for trim or color code. Revise landscape to list type of sod to be used on property.
BLD HOLD 03/15/2013 03/15/2013
Note: 1. Provide a wood header detail for the bearing walls. 2010 FBC R602. 2. Provide a non bearing wall detail per 2010 FBC R602.1.3. 3. Provide a threaded rod wall detail that includes the spacing from the corners and openings. 2010 FBC 107.2.1.
ELEC HOLD 03/15/2013 03/18/2013
Note: 1. Provide an electrical receptacle at the masterbath counter per 2008 NEC 210.52(D).
ENGIN1 COMPLETE 03/15/2013 03/20/2013
MECH COMPLETE 03/15/2013 03/15/2013
PLUM HOLD 03/15/2013 03/15/2013
Note: Sanitary riser diagram does not match with plans. Coordinate and revise per 2010 FBC 107.2.1.
SW1 HOLD 03/15/2013 03/18/2013
Note: 1. Provide existing and proposed elevations on the site plan to show the lot drainage.
UD1 COMPLETE 03/15/2013 03/18/2013
URB COMPLETE 03/15/2013 03/18/2013
ZON HOLD 03/15/2013 03/19/2013
Note: Revise site plan to provide the dimension and setback of the purposed driveway Revise site plan to remove the circular portion driveway from easement. Revise color sheet to show a correct color name for trim or color code. Revise landscape to list type of sod to be used on property.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 10/02/2013
REINSPECTION FEE ¤40.00 10/02/2013
REINSPECTION FEE ¤40.00 10/02/2013
REINSPECTION FEE ¤40.00 10/02/2013
REINSPECTION FEE ¤40.00 10/02/2013
NEW RESIDENTIAL INSPECTIONS ¤472.00 04/05/2013
SITE PLAN 20 ¤20.00 04/05/2013
SURCHARGE FS 533.721 ¤17.87 04/05/2013
SURCHARGE - FS 468.631 ¤17.87 04/05/2013
STORM WATER PERMIT FEES ¤80.00 04/05/2013
3% TRANS IMPACT FEE CREDIT (¤90.51) 04/05/2013
ADMIN FEE ¤20.00 04/05/2013
ELECTRIC FEE ¤201.60 04/05/2013
3% FIRE IMPACT FEE CREDIT (¤6.14) 04/05/2013
IMPACT FEE FIRE NONRESIDENTIAL ¤204.51 04/05/2013
IMPACT FEE PARKS ¤1,321.51 04/05/2013
IMPACT FEE SCHOOL ¤3,600.00 04/05/2013
IMPACT FEE TRANSPORTATION ¤3,017.05 04/05/2013
MECHANICAL FEE ¤201.60 04/05/2013
3% PARKS IMPACT FEE CREDIT (¤39.65) 04/05/2013
PLAN CHECK FEE ¤94.40 04/05/2013
PLUMBING FEE ¤201.60 04/05/2013
Fees Total Due: ¤0.00 Total Paid: ¤9,533.71