I want to search for...
Permit #2013040078
Permit Details
Status: COED
| Parcel Id: 10-11-30-4937-00000-0180 |
| Block: 00000 |
| Subdivision: 2262 - PALM COAST INDUSTRIAL PARK |
| Job Phone: 386-238-1570 |
| Location Address: 5 HARGROVE GRADE |
| Type: CIA - COMMERCIAL INTERIOR EXTERIOR ALTERATION |
| Issue Date: 05/01/2013 |
| NOC: RECORDED |
| Applicant name: GARY LYNN ROBERTS |
| Owner: HANCOCK BANK |
|
Address 1022 WEST 23RD STREET PANAMA CITY, FL 32405 |
| Lot: 0180 |
| Contracted Stated Job Value: ¤99,673.00 |
| Job Description: INTERIOR RENOVATION "GIOIA SAILS" (MANUFACTURER BOAT SEAT / CANVAS AWNING) |
| Type: CN |
Contractor
COMMERCIAL CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
7 SUNSHINE BLVD ORMOND BEACH, FL 32174 |
CGC059441 (Exp: 08/31/2026) | 386-238-1570 | 386-238-1571 |
Sub Contractors
JOHN FREDERICK WANERKA JR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
P.O. BOX 350214 BUNNELL, FL 32110 |
EC13003318 (Exp: 08/31/2022) | (386)446-9626 | (386)445-3131 |
JUAN EUGENIO CAMPELO
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
114 ALLGOOD CIRCLE SUITE #101 ST AUGUSTINE, FL 32086 |
CAC1813797 (Exp: 08/31/2026) | 904-824-4275 | 904-824-4614 |
ISAAC WALTER JOHNSTON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
887 BRENTWOOD DRIVE Daytona Beach, FL 32117 |
CFC023634 (Exp: 08/31/2026) | (386) 252-7047 |
Inspection History
| Type | Request Date | Result | Inspector |
| ELECTRIC FINAL | 06/06/2013 | FINAL APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| ELECTRIC FINAL | 06/04/2013 | Disapproved -FEE REQUIRED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 6/4/2013 3:14:43 PM NEED TO SHOW ADDED CIRCUITS ON BUILDING B AND SUB PANEL ON PLANS ALSO WHAT SUB PANEL IS FEEDING WITH LOAD CALCS. | |||
| HVAC FINAL | 06/04/2013 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| BUILDING FINAL | 06/04/2013 | APPROVED | CMINI |
| FIRE FINAL | 06/04/2013 | APPROVED | JHINDMAN |
| PLUMBING FINAL | 06/03/2013 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| PLUMBING FINAL | 05/30/2013 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 5/30/2013 3:40:10 PM BUILDING A ONLY | |||
| HVAC FINAL | 05/30/2013 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 5/30/2013 3:40:11 PM BUILDING A ONLY | |||
| ELECTRIC FINAL | 05/30/2013 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 5/30/2013 3:40:08 PM PARTIAL ON CIRCUITS IN CELING OK..NEED REVISION ON PANEL SCHEDULES TO MATCH PLAN SHOWING SIZES OF PANEL AND BREAKERS TO MATCH NEW CIRCUITS ,RISER DOES NOT MATCH PLAN..,NEW TO SHOW ADDED LIGHTS IN BUILDING A ALSO | |||
| U - UTILITY COMMERCIAL FINAL | 05/30/2013 | APPROVED | DSPENCER |
| ELECTRIC 2ND ROUGH | 05/28/2013 | APPROVED - AS NOTED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 5/28/2013 2:16:37 PM CEILING OUTLETS | |||
| ELECTRIC 2ND ROUGH | 05/24/2013 | CANCELLED BY APPLICANT | CMINI |
| Note: Inspection Resulted at 5/24/2013 12:53:32 PM | |||
| HVAC ROUGH | 05/21/2013 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB | 05/21/2013 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 5/21/2013 2:15:34 PM PLUMBING COVER UP | |||
| ABOVE CEILING | 05/21/2013 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| FINAL | 05/21/2013 | CANCELLED BY INSPECTOR | CMINI |
| Note: Inspection Resulted at 5/21/2013 2:16:47 PM WRONG INSPECTION CALLED IN | |||
| ABOVE CEILING | 05/20/2013 | Disapproved -FEE REQUIRED | CMINI |
| Note: Inspection Resulted at 5/20/2013 2:43:58 PM M.C NEEDS TO BE STRAPPED AND SUPPORTED EVERY 6`` INTERVALS,NEED TO STRAP MC WITHIN 12" OF BOXES..CHECK BOX FILL ON JUNCTION BOX..DUCT WORK STILL NOT COMPLETE | |||
| HVAC ROUGH | 05/20/2013 | Disapproved - NO FEE | CMINI |
| Note: Inspection Resulted at 5/20/2013 2:43:59 PM DUCT WORK STILL NOT COMPLETE | |||
| PLUMBING 1ST ROUGH | 05/20/2013 | APPROVED | CMINI |
| PLUMBING 2ND ROUGH | 05/20/2013 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| PLUMBING 2ND ROUGH | 05/13/2013 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 5/13/2013 2:39:40 PM 1ST PHASE | |||
| MONOLITHIC SLAB | 05/06/2013 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 5/6/2013 12:09:15 PM PLUMBING COVER UP | |||
| PLUMBING 1ST ROUGH | 05/03/2013 | APPROVED | RMARVEL |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 06/05/2013 | 06/06/2013 |
| ELEC | COMPLETE | 06/04/2013 | 06/04/2013 |
| PLUM | COMPLETE | 04/26/2013 | 04/29/2013 |
| FI1 | COMPLETE | 04/26/2013 | 04/30/2013 |
| PLUM | HOLD | 04/22/2013 | 04/22/2013 |
| Note: 1. Provide pipe sizes (sanitary and vent) for added/relocated fixtures on sanitary riser diagram for building A per 2010 FBC 107.3.5. 2. Provide sanitary riser diagram for building B per 2010 FBC 107.3.5. | |||
| ELEC | COMPLETE | 04/22/2013 | 04/22/2013 |
| MECH | COMPLETE | 04/22/2013 | 04/22/2013 |
| BLD | COMPLETE | 04/22/2013 | 04/22/2013 |
| FI1 | HOLD | 04/22/2013 | 04/22/2013 |
| Note: 1. Provide a layout of all fixtures, racks, tables and equipment with dimensions for review. | |||
| BLD | HOLD | 04/02/2013 | 04/03/2013 |
| Note: 1. Provide a floorplan with dimensions. 210 FBC 107.2.1. 2. The minimum corridor width does not comply with 2010 FBC 1023.2. | |||
| ELEC | HOLD | 04/02/2013 | 04/02/2013 |
| Note: Provide electric load calculations, panel schedules and service riser detail NEC 220 and 230 | |||
| FI1 | HOLD | 04/02/2013 | 04/03/2013 |
| Note: 1. Provide a lifesafety plan with dimensions that includes all paths of travel and all fixtures, tables, racks and equipment. 2. The life safety plan in building A has two sections of F1/ Industrial with different occupant load factors. Provide correct load factors. If the 300 sq ft per person area is storage is there any high pile racks? 3.Provide correct Occupancy classification and occupant load totals on the Lifesafety plan. 4. Sheet TBL and the Lifesafety plan do not have the same exit details. 5. The dead end corridor width does not meet Table 40.2.5 of the 2010 FFPC. | |||
| MECH | HOLD | 04/02/2013 | 04/03/2013 |
| Note: Provide hvac plans and details suitable for review, inspection and construction per 2010 FBC 107.2.1. | |||
| PLUM | HOLD | 04/02/2013 | 04/02/2013 |
| Note: 1. Provide service sink each for building A and building B per 2010 FBC P Table 403.1 | |||
| ZON | COMPLETE | 04/02/2013 | 04/04/2013 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REVISION | ¤40.00 | 06/06/2013 |
| REINSPECTION FEE | ¤40.00 | 06/05/2013 |
| REINSPECTION FEE | ¤40.00 | 06/04/2013 |
| REVISION | ¤40.00 | 06/04/2013 |
| SITE PLAN 20 | ¤20.00 | 05/01/2013 |
| SURCHARGE FS 533.721 | ¤18.48 | 05/01/2013 |
| SURCHARGE - FS 468.631 | ¤18.48 | 05/01/2013 |
| ADMIN COMMERCIAL | ¤60.00 | 05/01/2013 |
| INSPECTION - COMMERCIAL ADD | ¤697.71 | 05/01/2013 |
| ELECTRIC FEE | ¤119.80 | 05/01/2013 |
| FIRE PLANS REVIEW | ¤25.00 | 05/01/2013 |
| MECHANICAL FEE | ¤119.80 | 05/01/2013 |
| PLAN CHECK FEE | ¤114.63 | 05/01/2013 |
| PLUMBING FEE | ¤119.80 | 05/01/2013 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤1,473.70 |