Permit #2013040154

Permit Details

Status: COED

Parcel Id: 07-11-31-1090-00000-00B0
Block: 00000
Subdivision: 1228 - SOUTHWEST QUADRANT
Job Phone: 904-826-1426
Location Address: 160 CYPRESS POINT PKWY
Type: CIA - COMMERCIAL INTERIOR EXTERIOR ALTERATION
Issue Date: 05/08/2013
NOC: RECORDED
Applicant name: FRANK ROBERT SORRENTINO
Owner: KATHRYN ZBIKOWSKI

Address

160 CYPRESS POINT PKWY

PALM COAST, FL 32164

Address

BUILDING D, UNITS 112 & 113

PALM COAST, FL 32164

Lot: 00B0
Contracted Stated Job Value: ¤10,000.00
Job Description: D 112&113 - INTERIOR BUILDOUT- ZFITNESS & ZIBKO REALTY
Type: CN

Contractor

CLEAR CHOICE WINDOWS OF NORTH FLORIDA
Status Location Address State License Number Phone
CANCEL

212 BEECHWOOD LANE

PALM COAST, FL 32137

CBC1258275 (Exp: 08/31/2016) 386-225-3304

Sub Contractors

GLEN WILLIAM KEHLE
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 353511

BUNNELL, FL 32110

CFC057241 (Exp: 08/31/2026) (386) 447-4249 (386) 437-8488
JAMES KUYKENDALL
Status Location Address State License Number Phone Fax
CANCEL

2550 US 1 NORTH SUITE 3

BUNNELL, FL 32110

CAC1815546 (Exp: 08/31/2022) (386)437-2929 (386)437-2942
JOHN EDWARD GAMBONE
Status Location Address State License Number Phone Fax
CANCEL

55 BARRISTER LN

PALM COAST, FL 32137

ER13013466 (Exp: 08/31/2014) 386-586-9144 (386)246-6305

Inspection History

Type Request Date Result Inspector
PLUMBING FINAL 07/03/2013 APPROVED RMARVEL
HVAC FINAL 07/03/2013 APPROVED RMARVEL
ELECTRIC FINAL 07/03/2013 APPROVED RMARVEL
ABOVE CEILING 07/03/2013 APPROVED RMARVEL
Note: THIS IS A REINSPECTION
BUILDING FINAL 07/03/2013 FINAL APPROVED RMARVEL
FIRE FINAL 07/03/2013 APPROVED JHINDMAN
U - UTILITY COMMERCIAL FINAL 07/03/2013 APPROVED RMARVEL
Note: Inspection Resulted at 7/3/2013 3:24:43 PM PER DANNY SPENCER.
ELECTRIC 2ND ROUGH 06/07/2013 APPROVED RMARVEL
Note: THIS IS A REINSPECTION Inspection Resulted at 6/7/2013 8:20:24 AM WALLS ONLY.
ABOVE CEILING 06/07/2013 Disapproved -FEE REQUIRED RMARVEL
Note: Inspection Resulted at 6/7/2013 8:20:23 AM NOT READY. STILL NEED TO INSTALL POWER AND BOXES FOR FANS IN CEILING. CALL IN FOR REINSPECTION WHEN WORK IS COMPLETE.
FRAMING 06/04/2013 APPROVED RMARVEL
Note: THIS IS A REINSPECTION
PLUMBING 2ND ROUGH 06/04/2013 APPROVED RMARVEL
FRAMING 05/31/2013 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 5/31/2013 3:35:23 PM FRAMING ON WALLS ALL CAN BE 1 SIDED EXCEPT SHOWER WALL,NEED TO COMPLETE PLUMBING AND CALL 2ND ROUGH PLUMBING INSPECTION BEFORE COVER UP ON SHOWER WALL..
ELECTRIC 2ND ROUGH 05/31/2013 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 5/31/2013 3:35:25 PM NEED REVISION APPROVED ON ELECTRIC .CHECKED STRAPPING OK.. ALL CAN BE 1 SIDED EXCEPT SHOWER WALL,NEED TO COMPLETE PLUMBING AND CALL 2ND ROUGH PLUMBING INSPECTION BEFORE COVER UP ON SHOWER WALL..
HVAC ROUGH 05/29/2013 APPROVED RMARVEL
PLUMBING 1ST ROUGH 05/20/2013 APPROVED CMINI

Review History

Department Status Date In Date Out
ELEC COMPLETE 06/05/2013 06/06/2013
ELEC HOLD 05/30/2013 05/31/2013
Note: The original electric drawings are signed and sealed so revised drawings will need to be signed and sealed FBC 107.1
PLUM COMPLETE 05/07/2013 05/07/2013
MECH COMPLETE 05/07/2013 05/07/2013
FI1 COMPLETE 05/07/2013 05/08/2013
FI1 HOLD 04/26/2013 04/30/2013
Note: 1. Provide a complete coordinated drawing by a design professional. per the Building Official.
MECH HOLD 04/26/2013 04/29/2013
Note: 1. Submitted hvac plan with return air from individual office using 6 in x 10 opening above the door is not adequate to comply with 2010 FBC M 601.4 for balance retun air requirement.
PLUM HOLD 04/26/2013 04/29/2013
Note: 1. Provide water heater specifications and instalation instructions as previously requested. 2. Drinking fountain as previously requested shall be included in the riser diagrams for both sanitary and domestic water per 2010 FBC 107.3.5.
ELEC COMPLETE 04/26/2013 05/07/2013
ELEC COMPLETE 04/23/2013 04/23/2013
FI1 HOLD 04/23/2013 04/23/2013
Note: 1. Provide the occupancy type as listed in the Building and Fire codes. 2. Calculate the occupant load based on the square footage and the Building and Fire codes.
MECH HOLD 04/23/2013 04/24/2013
Note: 1. Plan indicates no change in existing hvac. The proposed plan shows 3 offices with full height patitions. How would supply and return be accomplished in those areas per 2010 FBC 107.2.1. Previous comment item 2 shall be addressed - 2. Provide the existing capacity of hvac units to verify if they meet the submitted calculated heating/cooling load per 2010 FBC EC 403.6.
PLUM HOLD 04/23/2013 04/24/2013
Note: 1. Provide specifications of water heater, its location and manufacturer installation instructions per 2010 FBC P 502.1. 2. Provide drinking fountain per 2010 FBC P Table 403.1.
PLUM HOLD 04/19/2013 04/19/2013
Note: Provide domestic water riser diagram and material specification per 2010 FBC 107.3.5.
ELEC HOLD 04/19/2013 04/19/2013
Note: Provide load calculations and panel schedules NEC Article 220
FI1 HOLD 04/19/2013 04/19/2013
Note: 1. The life safety plan must be for the new configuration of the space. It must show the exits, exit sign locations, emergency lights, travel distances, fire extinguisher locations, all door and hallway widths, occupant load and occupancy type.
MECH HOLD 04/19/2013 04/19/2013
Note: 1. Provide proposed hvac plan suitable for review, inspection and construction per 2010 FBC 107.3.5. 2. Provide the existing capacity of hvac units to verify if they meet the submitted calculated heating/cooling load per 2010 FBC EC 403.6.
BLD HOLD 04/04/2013 04/04/2013
Note: Provide plan drawings with detail suitable for review, construction and inspection FBC 107.2.1
ELEC HOLD 04/04/2013 04/04/2013
Note: Provide plan drawings with detail suitable for review, construction and inspection FBC 107.2.1
FI1 HOLD 04/04/2013 04/05/2013
Note: 1. Provide a Lifesafety plan that is suitable for review, construction and inspection. FFPC
PLUM HOLD 04/04/2013 04/04/2013
Note: Provide plan drawings with detail suitable for review, construction and inspection FBC 107.2.1
UD1 COMPLETE 04/04/2013 04/04/2013
ZON COMPLETE 04/04/2013 04/04/2013
BLD COMPLETE 04/04/2013 05/08/2013

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 07/03/2013
REVISION ¤40.00 07/03/2013
SITE PLAN 20 ¤20.00 05/08/2013
SURCHARGE FS 533.721 ¤6.42 05/08/2013
SURCHARGE - FS 468.631 ¤6.42 05/08/2013
ADMIN COMMERCIAL ¤60.00 05/08/2013
INSPECTION - COMMERCIAL ADD ¤70.00 05/08/2013
ELECTRIC FEE ¤66.00 05/08/2013
FIRE PLANS REVIEW ¤25.00 05/08/2013
MECHANICAL FEE ¤66.00 05/08/2013
PLAN CHECK FEE ¤100.00 05/08/2013
PLUMBING FEE ¤66.00 05/08/2013
Fees Total Due: ¤0.00 Total Paid: ¤565.84