I want to search for...

Permit #2013050047

Permit Details

Status: COED

Parcel Id: 07-11-31-7034-01350-0090
CONDITIONED SPACE: 2431 sqft
GARAGE: 547 sqft
SCREEN PORCH (SOLID ROOF) : 325 sqft
PATIO/DECK (NO ROOF) : 140 sqft
CONDITIONED SPACE: 208 sqft
Total Square Footage: 3651 sqft
Block: 01350
Subdivision: 2165 - SECTION 34-EASTHAMPTON
Job Phone: (386) 446-5850
Location Address: 7 EDGELY PL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 05/21/2013
NOC: RECORDED
Applicant name: CHARLES DALLAS RINEK
Owner: MARIA THOMAS

Address

1105 KAYLEIGHS COURT

EAST MARION, NY 11939

Lot: 0090
Contracted Stated Job Value: ¤237,500.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

CHARLES RINEK CONSTRUCTION, INC.
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 352502

Palm Coast, FL 32137

CGC046080 (Exp: 08/31/2026) (386) 446-5850 (386)445-9992

Sub Contractors

WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
PAUL S AIELLO
Status Location Address State License Number Phone Fax
CANCEL

PO BOX 351926

PALM COAST, FL 32137

CAC1815808 (Exp: 08/31/2016) (386)239-0053 (386)323-1955
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
STEPHEN M RENDE
Status Location Address State License Number Phone
CANCEL

22 ALAMANDA DRIVE

ORMOND, FL 32176

CCC058058 (Exp: 08/31/2020) 386-439-7156
PHILIP ALAN KENOVICH
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 1470

HOLLY HILL, FL 32117

LG270 (Exp: 08/31/2026) (386)672-2507

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 04/24/2014 FINAL APPROVED RMARVEL
Note: THIS IS A REINSPECTION Inspection Resulted at 4/24/2014 2:54:12 PM DID NOT SIGN PERMIT DUE TO WASP NEST IN JOB BOX.
U -UTILITY RESIDENTIAL FINAL 04/24/2014 FINAL APPROVED DSPENCER
FINAL APRON (AFTER POUR/DRIVEWAY) 04/22/2014 APPROVED GLALIMA
ROW FINAL 04/22/2014 APPROVED GLALIMA
BLD - BUILDING FINAL 04/22/2014 Disapproved -FEE REQUIRED RMARVEL
Note: Inspection Resulted at 4/22/2014 3:01:40 PM AHU AND ACU DO NOT BREAKER SIZING PER MANUFACTURERS SPECS. BONDING OF METAL WATER PIPE SHALL BE ACCESSIBLE/VISIBLE. INSTALL ARC SHIELDS WHERE ENCLOSURES ARE RECESSED MORE THAN 1/4IN INTO NON-COMBUSIBLE MATERIAL. MISSING COVER PLATE AT DOUBLE SWITCH AT UPSTAIRS ROOM. EXTERIOR RECEPTACLES SUBJECT TO RAIN NEED IN-USE COVERS.( LOOK UNDER MAIN DISCONNECT.)
GAS FINAL 04/22/2014 APPROVED RMARVEL
FINAL SURVEY (OFFICE USE ONLY) 04/11/2014 APPROVED JMCGOWEN
GAS ROUGH 03/20/2014 APPROVED DROCKWELL
ELECTRIC - EARLY POWER 03/10/2014 APPROVED DROCKWELL
FINAL APRON (AFTER POUR/DRIVEWAY) 02/24/2014 CANCELLED BY APPLICANT AIRS WEB
PRE-APRON (PRE-POUR/DRIVEWAY) 02/19/2014 APPROVED - AS NOTED GLALIMA
Note: INSPECTION WAS PERFORMED ON FEB, 19, 2014 . WE HAD ISSUES WITH WATER AND SURVEY. PASSED THAT DAY IF AN ISSUE CALL GARY LA LIMA 585 - 0287
PRE-APRON (PRE-POUR/DRIVEWAY) 02/18/2014 PARTIALLY APPROVED GLALIMA
Note: CULVERT READY TO POUR
GRAVITY SEWER TEST 02/03/2014 APPROVED DROCKWELL
U - SEWER TIE IN 01/31/2014 APPROVED DSPENCER
INSULATION 09/30/2013 APPROVED DROCKWELL
ALL ROUGH 09/24/2013 APPROVED DROCKWELL
Note: THIS IS A REINSPECTION
ALL ROUGH 09/20/2013 Disapproved -FEE REQUIRED JHINDMAN
Note: THIS IS A REINSPECTION Inspection Resulted at 9/20/2013 2:26:20 PM 1. THE REVISED ELECTRIC IS NOT PER PLAN. MISSING RECEPTACLE LOCATIONS ARE CIRCLED ON PLANS 2010 FBC 107.4.
ALL ROUGH 09/09/2013 Disapproved -FEE REQUIRED DROCKWELL
Note: THIS IS A REINSPECTION requested by contractor Inspection Resulted at 9/9/2013 2:42:14 PM REVISE PLANS TO SHOW ALL ADDITIONAL ELECTRICAL/PROVIDE A/C PLAN FOR INSPECTION
WALL SHEATHING 09/09/2013 APPROVED DROCKWELL
Note: THIS IS A REINSPECTION by contractor
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/06/2013 APPROVED DROCKWELL
WALL SHEATHING 09/06/2013 Disapproved -FEE REQUIRED DROCKWELL
Note: Inspection Resulted at 9/6/2013 2:33:01 PM PAPER AND LATH ALREADY INSTALLED ON WALLS.MISSED INSPECTION.CONTACT CHIEF BUILDING OFFICIAL LARRY WOODROME BEFORE PROCEEDING FURTHER.
ALL ROUGH 09/06/2013 CANCELLED BY APPLICANT DROCKWELL
LATH/BRICK/ WATER BARRIER 09/06/2013 CANCELLED BY APPLICANT DROCKWELL
ELECTRIC-TUG 09/05/2013 APPROVED DROCKWELL
TIE BEAM / LINTEL 07/18/2013 APPROVED RMARVEL
Note: THIS IS A REINSPECTION
TIE BEAM / LINTEL 07/16/2013 CANCELLED BY APPLICANT JMONTARULI
Note: Contractor called to cancel this inspection
FOUND SURVEY APPROVED (OFFICE) 07/15/2013 APPROVED JHINDMAN
MONOLITHIC SLAB 06/26/2013 APPROVED RMARVEL
PLUMBING 1ST ROUGH UNDERGROUND 06/25/2013 APPROVED RMARVEL
Note: THIS IS A REINSPECTION CONTRACTOR REQUESTED
PLUMBING 1ST ROUGH UNDERGROUND 06/24/2013 Disapproved -FEE REQUIRED RMARVEL
Note: Inspection Resulted at 6/24/2013 3:09:13 PM PROVIDE DWV AND WATER RISER DIAGRAM FOR INSPECTION.

Review History

Department Status Date In Date Out
SW1 COMPLETE 04/11/2014 04/11/2014
Note: Released By: JMCGOWEN FINAL SURVEY
ZON COMPLETE 03/25/2014 03/26/2014
BLD COMPLETE 03/17/2014 03/17/2014
Note: Revision - gas riser diagram including u/g gas tank tie down.
ZON COMPLETE 03/17/2014 03/17/2014
BLD COMPLETE 09/30/2013 10/01/2013
ELEC COMPLETE 09/23/2013 09/23/2013
BLD COMPLETE 09/19/2013 09/19/2013
ELEC COMPLETE 09/19/2013 09/19/2013
ZON COMPLETE 07/15/2013 07/15/2013
Note: Released By: JHINDMAN foundation survey
SW1 COMPLETE 07/15/2013 07/15/2013
Note: Released By: JHINDMAN foundation survey
BLD COMPLETE 06/05/2013 06/06/2013
PLUM COMPLETE 06/05/2013 06/06/2013
BLD HOLD 05/28/2013 05/29/2013
Note: Copyrighted drawings will need to be signed and sealed by architect FBC 107.1
PLUM HOLD 05/28/2013 05/29/2013
Note: Copyrighted drawings will need to be signed and sealed by architect FBC 107.1
PLUM COMPLETE 05/09/2013 05/09/2013
ELEC COMPLETE 05/09/2013 05/09/2013
BLD COMPLETE 05/09/2013 05/09/2013
UD1 COMPLETE 05/09/2013 05/09/2013
ENGIN1 COMPLETE 05/09/2013 05/10/2013
ZON COMPLETE 05/09/2013 05/13/2013
BLD HOLD 05/03/2013 05/03/2013
Note: 1. Provide an attic access 2010 FBC R 302.5.3. 2. Provide a wall sheathing and floor decking size and nailing detail 2010 FBC R 503 and R604. 3. Provide a garage/house door separation that complies with 2010 FBC R302.5. 4. Provide garage/house separation for walls and ceiling that complies with 2010 FBC R302.6. 5. Provide a gas riser diagram that includes the contrators name and license number on it. 2010 FBC 107.1.
ELEC HOLD 05/03/2013 05/03/2013
Note: Provide smoke detector for second story room and co detector at bottom of stairway FRBC R314
ENGIN1 HOLD 05/03/2013 05/06/2013
Note: 1. An on-site, third order, easily identifiable benchmark referenced to NAVD 1988 datum (e.g. fire hydrant, nail in power pole). Pavement nails will not be accepted as benchmarks. (The benchmark must be maintained throughout the construction cycle and will be used in the Swale Plan and Final Survey. 2. The road centerline (RCL) and edge of pavement (EOP) elevations for roadways adjacent to and along all property lines, including EOP in Cul-De-Sacs at 9, 12 and 3 o’clock positions
MECH COMPLETE 05/03/2013 05/03/2013
PLUM HOLD 05/03/2013 05/03/2013
Note: Provide sanitary riser diagram either signed and sealed by a design professional or with signature and license number by a plumbing contractor per 2010 FBC 107.2.1.
SW1 COMPLETE 05/03/2013 05/03/2013
UD1 HOLD 05/03/2013 05/06/2013
Note: Show PEP planel on elic plans
URB COMPLETE 05/03/2013 05/07/2013
ZON HOLD 05/03/2013 05/08/2013
Note: Revise the color sheet to meet the munsell for pastel light reflective value (lrv) of 80% or greater.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADDITIONAL FEE ¤40.00 04/25/2014
REINSPECTION FEE ¤40.00 04/25/2014
REVISION ¤40.00 04/25/2014
REINSPECTION FEE ¤40.00 10/03/2013
REVISION ¤40.00 10/03/2013
REVISION ¤40.00 10/03/2013
REVISION ¤40.00 09/19/2013
REINSPECTION FEE ¤40.00 09/19/2013
REINSPECTION FEE ¤40.00 09/19/2013
REINSPECTION FEE ¤40.00 06/24/2013
REVISION ¤40.00 06/24/2013
NEW RESIDENTIAL INSPECTIONS ¤640.00 05/21/2013
ADMIN FEE ¤20.00 05/21/2013
ELECTRIC FEE ¤252.00 05/21/2013
3% FIRE IMPACT FEE CREDIT (¤6.24) 05/21/2013
IMPACT FEE FIRE NONRESIDENTIAL ¤207.99 05/21/2013
IMPACT FEE PARKS ¤1,343.98 05/21/2013
IMPACT FEE SCHOOL ¤3,600.00 05/21/2013
IMPACT FEE TRANSPORTATION ¤3,017.05 05/21/2013
MECHANICAL FEE ¤252.00 05/21/2013
3% PARKS IMPACT FEE CREDIT (¤40.32) 05/21/2013
PLAN CHECK FEE ¤128.00 05/21/2013
PLUMBING FEE ¤252.00 05/21/2013
SITE PLAN 20 ¤20.00 05/21/2013
SURCHARGE FS 533.721 ¤23.16 05/21/2013
SURCHARGE - FS 468.631 ¤23.16 05/21/2013
STORM WATER PERMIT FEES ¤80.00 05/21/2013
3% TRANS IMPACT FEE CREDIT (¤90.51) 05/21/2013
Fees Total Due: ¤0.00 Total Paid: ¤10,162.27