Permit #2013050232
Permit Details
Status: COED
| Parcel Id: 08-12-31-5835-00000-0010 |
| CONDITIONED SPACE: 4528 sqft |
| OPENED PORCH (WITH ROOF) : 428 sqft |
| Total Square Footage: 4956 sqft |
| Block: 00000 |
| Subdivision: 2117 - Town Center Phase III, BROOKHAVEN |
| Job Phone: 407-741-8500 |
| Location Address: 181 BROOKHAVEN CT N |
| Type: BM - BUILDING MULTI - APARTMENT |
| Issue Date: 09/27/2013 |
| NOC: RECORDED |
| Applicant name: SCOTT W CULP |
| Owner: BROOKHAVEN DEVELOPMENT LAND LTD |
|
Address 200 E CANTON AVE # 102 WINTER PARK, FL 32789 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤255,698.00 |
| Job Description: BUILDING 25 - BROOKHAVEN 4 UNIT APARTMENT |
| Type: CN |
Contractor
CPG CONSTRUCTION LLP
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
200 E CANTON AVE # 102 WINTER PARK, FL 32789 |
CGC1512998 (Exp: 08/31/2016) | 407-741-8500 | 407-643-2551 |
Sub Contractors
RANCE F BORDERICK
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
430 WEST DRIVE ALTAMONTE SPRINGS, FL 32714 |
EC0000981 (Exp: 08/31/2026) | (407)788-3500 | 407-788-2007 |
DAVID A CROSON
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
31550 COUNTY ROAD 437 SORRENTO, FL 32776 |
CFC1426109 (Exp: 08/31/2022) | 352-729-7100 | 352-735-0623 |
JOSEPH RICHARD CASSIDY JR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
17304 PHIL C PETERS RD WINTER GARDEN, FL 34787 |
CCC1327385 (Exp: 08/31/2020) | 407-654-4426 | (407)654-4307 |
JOHN MAXEN BARTKOVICH
| Status | Location Address | State License Number | Phone |
| ACTIVE |
818 SHADOWMOSS DR WINTERGARDEN, FL 32787 |
CAC1815793 (Exp: 08/31/2026) | 407-886-3729 |
Inspection History
| Type | Request Date | Result | Inspector |
| LDSC- LANDSCAPE FINAL | 04/29/2014 | APPROVED - AS NOTED | WBUTLER |
| Note: LANDSCAPE/ IRRIGATION FINALS FOR BROOKHAVEN BUILDINGS 24 and 25 Permit number 2013050230 (building24) Permit number 2013050232 (building25) 4-28-14 General Comments: 1. Irrigation control wire problem with all areas in the Brookhaven development. Need to manually bleed on all valves periodically to insure plants, trees and sod does not die. Need to resolve this before the last unit gets its final inspection approval. 2. Replace broken concrete water meter box on the west side of parking lot entrance. 3. As-builts needed from project landscape architect before last unit gets final inspection approval. 4. Stake all podocarpus that are leaning as this is a City requirement for a Florida Number one or better quality plant (plant must stand upright without staking to be a number 1) Staff is willing in this case to allow staking of those that do not stand erect. Building 25: 1. Possible leak in irrigation line at southwest corner of the building. Building 24 1. Need to excavate around water meter boxes where dirt has sunk out and put filter cloth over the openings where dirt is entering boxes. Fill voids around box and replace sod. 2. On east side of the driveway entrance move one spray head about one foot east to fully cover the sod. 3. Need to re-grade the rear of the building so the water drains positively away from the building. Re-sod any disturbed area. Building perimeter floods when irrigation is on or it rains. 4. Remove the porta-potty, debris and dirt from the cul-de-sac area. Building 107: 1. Add Bahia sod to the rear property line where bare soil exists on the steep slope. Modify irrigation nozzles to temporarily run full circle on top of the bank to establish the sod. STILL NOT COMPLETE 2. Irrigation spray heads not installed on the south side of the building to water the grass. STILL NOT COMPLETE Building 111: 1. Spray heads not installed on the north side of the building to water the grass. STILL NOT COMPLETE STILL OUTSTANDING COMMENTS FOR BUILDINGS 26 and 27: 1. The parking lot was modified to use environmental curbing instead of 6 inch highback curb. Additionally add two parking stops on each side of the parking lot along the northern edge of the two northernmost parking spaces that are adjacent to the landscape islands to prevent cars from entering the islands. STILL NOT COMPLETE- CURBING OF PARKING LOT ISLANDS IS REQUIRED PER SECTION 11.03.04.B.3.a. of the Land Development Code. The modification to the parking lot was not previously approved by the City. Previous plan showed these islands curbed. 2. Add Bahia sod along the north side of the crown grass planting adjacent to the wetland buffer anywhere there is bare soil. STILL NOT COMPLETE-FINISH EASTERN END | |||
| U - UTILITY COMMERCIAL FINAL | 04/29/2014 | FINAL APPROVED | DSPENCER |
| BUILDING FINAL | 04/25/2014 | APPROVED | JHINDMAN |
| PLUMBING FINAL | 04/25/2014 | APPROVED | JHINDMAN |
| HVAC FINAL | 04/25/2014 | APPROVED | JHINDMAN |
| ELECTRIC FINAL | 04/25/2014 | APPROVED | JHINDMAN |
| FIRE FINAL | 04/25/2014 | APPROVED | JHINDMAN |
| ELECTRIC - EARLY POWER | 04/17/2014 | APPROVED | RMARVEL |
| Note: Inspection Resulted at 4/17/2014 12:39:47 PM CALLED FPL AT 11:35. | |||
| FIREWALL | 03/24/2014 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| LATH/BRICK/WATER BARRIER | 03/21/2014 | APPROVED | RMARVEL |
| ALL ROUGH | 03/21/2014 | APPROVED | RMARVEL |
| FIREWALL | 02/20/2014 | CANCELLED BY APPLICANT | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| INSULATION | 02/18/2014 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| INSULATION | 02/17/2014 | CANCELLED BY APPLICANT | JHINDMAN |
| ALL ROUGH | 02/14/2014 | APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 02/13/2014 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: THIS IS A REINSPECTION Inspection Resulted at 2/13/2014 3:41:41 PM LOOSE FITTING AT MAKE UP AIR VENTS. REPAIR OVERNOTCHED STUDS AND NAIL PLATE.RECHECK ALL AREAS FOR MECHANICAL REFAB. | |||
| ALL ROUGH | 02/12/2014 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: Inspection Resulted at 2/12/2014 3:04:05 PM NOT READY.MIDDLE 2 UNITS ARE NOT DONE. PLUMBING AND ELECTRICAL HAVE BEEN INSPECTED AND ARE APPROVED. | |||
| WINDOW NAILING | 02/12/2014 | APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION | |||
| FIREWALL | 02/12/2014 | PARTIALLY APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION Inspection Resulted at 2/12/2014 3:04:07 PM PAINTED PORTION AT ROOF DECKING. | |||
| WINDOW NAILING | 02/10/2014 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: THIS IS A REINSPECTION Inspection Resulted at 2/10/2014 3:26:49 PM REPLACE DAMADGED WINDOW | |||
| WINDOW NAILING | 02/07/2014 | CANCELLED BY APPLICANT | JHINDMAN |
| GRAVITY SEWER | 01/27/2014 | APPROVED | JHINDMAN |
| U - SEWER TIE IN | 01/27/2014 | APPROVED | DSPENCER |
| ELECTRIC 1ST ROUGH | 01/24/2014 | APPROVED | JHINDMAN |
| Note: laterals | |||
| EXTERIOR WALL SHEATHING / SHEARWALL | 01/10/2014 | APPROVED | RMARVEL |
| ROOF SHEATHING / BRACE / TIE DOWN | 01/10/2014 | APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION | |||
| EXTERIOR STRAP/CLIP | 01/10/2014 | APPROVED | RMARVEL |
| FIREWALL | 01/07/2014 | PARTIALLY APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 1/7/2014 12:20:13 PM MUD AND TAPE | |||
| FIREWALL | 01/06/2014 | PARTIALLY APPROVED | JHINDMAN |
| Note: Inspection Resulted at 1/6/2014 12:21:06 PM SCREWS IN ATTIC | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 12/31/2013 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: THIS IS A REINSPECTION Inspection Resulted at 12/31/2013 3:23:30 PM MISSING ENGINEERING. MULTIPLE LOCATIONS PER PLANS. PROVIDE TRUSS REPAIR ON DAMAGED TRUSS R20. | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 12/30/2013 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: THIS IS A REINSPECTION Inspection Resulted at 12/30/2013 3:17:39 PM NOT READY FOR INSPECTION. VALLEY TIE DOWNS ARE OVER BENT. INSTALL TO MANUFACTURERS SPECIFICATIONS. UNABLE TO GET TO ALL AREAS TO CHECK FOR LOOSE SHEATHING. TRADES SHOULD NOT BE INSTALLING AT THIS POINT. 2010 FBC INSPECTION SCHEDULE. | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 12/27/2013 | CANCELLED BY APPLICANT | CMINI |
| MONOLITHIC SLAB | 10/28/2013 | APPROVED | RMARVEL |
| ELECTRIC 1ST ROUGH | 10/28/2013 | APPROVED | RMARVEL |
| PLUMBING 1ST ROUGH | 10/24/2013 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| PLUMBING 1ST ROUGH | 10/23/2013 | Disapproved -FEE REQUIRED | CMINI |
| Note: Inspection Resulted at 10/23/2013 3:12:22 PM NO PLANS ON SITE FOR PLUMBING INSPECTION FBC 105.3 |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 03/26/2014 | 03/26/2014 |
| BLD | COMPLETE | 03/19/2014 | 03/19/2014 |
| ELEC | COMPLETE | 03/19/2014 | 03/19/2014 |
| MECH | COMPLETE | 03/19/2014 | 03/19/2014 |
| Note: Revision 7 dated 3-10-14. | |||
| PLUM | COMPLETE | 03/19/2014 | 03/19/2014 |
| Note: Revision 7 dated 3-10-14. | |||
| ELEC | COMPLETE | 02/12/2014 | 02/12/2014 |
| PLUM | COMPLETE | 02/12/2014 | 02/12/2014 |
| Note: Revision 5 - Added UFAS units | |||
| ELEC | COMPLETE | 01/08/2014 | 01/08/2014 |
| FI1 | COMPLETE | 12/26/2013 | 12/27/2013 |
| ELEC | COMPLETE | 12/19/2013 | 12/19/2013 |
| MECH | COMPLETE | 12/19/2013 | 12/20/2013 |
| Note: Revision - Rev.4 ,Sheet AM3.3. | |||
| PLUM | COMPLETE | 12/19/2013 | 12/20/2013 |
| Note: Revision - Rev.4 ,Sheets AP3.12/3.2/3.3/4.1. | |||
| ELEC | COMPLETE | 12/11/2013 | 12/12/2013 |
| MECH | COMPLETE | 12/11/2013 | 12/12/2013 |
| Note: Revision 4 dated 11-18-13 | |||
| PLUM | COMPLETE | 12/11/2013 | 12/12/2013 |
| Note: Revision 4 dated 11-18-13 | |||
| FI1 | HOLD | 12/10/2013 | 12/11/2013 |
| Note: 1. According to the manufacturers specifications, Flame control No 20-20a (under new surfaces) states that No 20-20a will not give a fire resistive rating on metal surfaces. 2. The primer must also be compatible with the fire retardant. 2010 FBC 709.4.1.1 | |||
| BLD | COMPLETE | 11/19/2013 | 02/12/2014 |
| Note: Revision 5 - Added UFAS units | |||
| BLD | COMPLETE | 11/14/2013 | 11/14/2013 |
| Note: Released By: JMCGOWEN revision, letter from D.P.O.R. on stud spacing | |||
| BLD | COMPLETE | 11/14/2013 | 11/15/2013 |
| Note: Released By: JMCGOWEN Truss repair | |||
| BLD | HOLD | 11/08/2013 | 11/08/2013 |
| Note: Held By: JHINDMAN 1. Provide a complete structural drawing for the header changes that is suitable for review, construction and inspection. 2010 FBC 107.2.1. | |||
| BLD | HOLD | 11/08/2013 | 11/08/2013 |
| Note: Held By: JHINDMAN 1. Provide a complete structural drawing for the header changes that is suitable for review, construction and inspection. 2010 FBC 107.2.1. | |||
| BLD | HOLD | 11/06/2013 | 11/06/2013 |
| Note: Held By: JHINDMAN 1. Provide clarification for the uplift value and the number of screws and that are required per stud to plate connection. 2010 FBC 107.2.1 | |||
| FI1 | COMPLETE | 10/16/2013 | 10/16/2013 |
| Note: n/a | |||
| UD1 | COMPLETE | 10/16/2013 | 10/17/2013 |
| PLUM | COMPLETE | 10/16/2013 | 10/17/2013 |
| Note: Revision - underground sanitary/domestic water plumbing plans | |||
| PLUM | COMPLETE | 10/09/2013 | 10/09/2013 |
| Note: Released By: JMCGOWEN Plumbing revision | |||
| BLD | COMPLETE | 09/30/2013 | 09/30/2013 |
| BLD | HOLD | 09/23/2013 | 09/24/2013 |
| Note: 1. Provide signed and sealed drawings per 2010 FBC 107.1. | |||
| BLD | COMPLETE | 08/07/2013 | 08/22/2013 |
| UD1 | COMPLETE | 08/07/2013 | 08/08/2013 |
| ZON | COMPLETE | 08/07/2013 | 08/08/2013 |
| BLD | HOLD | 07/10/2013 | 07/11/2013 |
| Note: 1. provide roof truss engineering per 2010 FBC 107.3.5. | |||
| ELEC | COMPLETE | 07/10/2013 | 07/10/2013 |
| ENGIN1 | COMPLETE | 07/10/2013 | 07/11/2013 |
| FI1 | COMPLETE | 07/10/2013 | 07/11/2013 |
| MECH | COMPLETE | 07/10/2013 | 07/10/2013 |
| PLLA | COMPLETE | 07/10/2013 | 07/10/2013 |
| PLUM | COMPLETE | 07/10/2013 | 07/10/2013 |
| UD1 | HOLD | 07/10/2013 | 07/11/2013 |
| Note: Held By: CJOHNSON Plans show single water service in to building. Each unit shall have individual service and meter located in green space outside of building in existing utility easement | |||
| ZON | HOLD | 07/10/2013 | 07/15/2013 |
| Note: 1. On Sheet AA0.2, the gross square feet is stated as 4958 square feet. Adding up the provided Living area and Non A/C area, the total appears to be 4956 square feet. Please revise the table to reflect the correct area. 2. Please revise Sheet AA6.2 to include the length and width dimensions of the buildings, which should match the previously approved elevations in the Development Order approval. 3. Please revise the plans to provide a screen porch elevation detailing the materials to be used on the screen enclosure, including any kickplates if applicable. 4. Per LDC Sec. 12.03.01.H and I, street address signs or building occupant signs affixed to the wall shall not exceed 2 square feet in sign copy area. Please revise the plans to include a detail of the "Brookhaven" occupant or street address wall sign to show the dimensions, not to exceed 2 square feet. 5. On Sheet AA6.2, please clarify whether the "B" located in or on the windows in the dormers are decals, separate signs or a part of the glass itself (i.e. stained glass). | |||
| BLD | HOLD | 05/10/2013 | 05/13/2013 |
| Note: Held By: FREODICA 1. Provide specific plans and details applicable to this permit application per 2010 FBC 107.2.1. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 05/01/2014 |
| REINSPECTION FEE | ¤40.00 | 05/01/2014 |
| REINSPECTION FEE | ¤40.00 | 05/01/2014 |
| REINSPECTION FEE | ¤40.00 | 05/01/2014 |
| REINSPECTION FEE | ¤40.00 | 05/01/2014 |
| REINSPECTION FEE | ¤40.00 | 05/01/2014 |
| REVISION | ¤40.00 | 05/01/2014 |
| REVISION | ¤40.00 | 05/01/2014 |
| REVISION | ¤40.00 | 05/01/2014 |
| REVISION | ¤40.00 | 05/01/2014 |
| REVISION | ¤40.00 | 05/01/2014 |
| REVISION | ¤40.00 | 05/01/2014 |
| REVISION | ¤40.00 | 05/01/2014 |
| REVISION | ¤40.00 | 05/01/2014 |
| REVISION | ¤40.00 | 05/01/2014 |
| REVISION | ¤40.00 | 05/01/2014 |
| REVISION | ¤40.00 | 05/01/2014 |
| REVISION | ¤40.00 | 05/01/2014 |
| REVISION | ¤40.00 | 05/01/2014 |
| REVISION | ¤40.00 | 05/01/2014 |
| REVISION | ¤40.00 | 05/01/2014 |
| REVISION | ¤40.00 | 05/01/2014 |
| REVISION | ¤40.00 | 05/01/2014 |
| REVISION | ¤40.00 | 05/01/2014 |
| REVISION | ¤40.00 | 05/01/2014 |
| REVISION | ¤40.00 | 05/01/2014 |
| REVISION | ¤40.00 | 05/01/2014 |
| REVISION | ¤40.00 | 05/01/2014 |
| REVISION | ¤40.00 | 05/01/2014 |
| REVISION | ¤40.00 | 05/01/2014 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤831.96 | 05/01/2014 |
| IMPACT FEE SCHOOL | ¤3,724.00 | 05/01/2014 |
| IMPACT FEE TRANSPORTATION | ¤10,862.40 | 05/01/2014 |
| INSPECTION FEE 20 | ¤20.00 | 05/01/2014 |
| PARKS IMPACT FEE | ¤3,576.96 | 05/01/2014 |
| PLAN CHECK FEE | ¤571.55 | 09/27/2013 |
| PLUMBING FEE | ¤358.20 | 09/27/2013 |
| MECHANICAL FEE | ¤358.20 | 09/27/2013 |
| PERMIT FEE | ¤2,733.50 | 09/27/2013 |
| FIRE PLANS REVIEW | ¤49.56 | 09/27/2013 |
| ADMIN COMMERCIAL | ¤60.00 | 09/27/2013 |
| ELECTRIC FEE | ¤358.20 | 09/27/2013 |
| SURCHARGE FS 533.721 | ¤66.60 | 09/27/2013 |
| SURCHARGE - FS 468.631 | ¤66.60 | 09/27/2013 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤24,837.73 |