I want to search for...
Permit #2013050234
Permit Details
Status: COED
| Parcel Id: 08-12-31-5835-00000-0010 |
| CONDITIONED SPACE: 3477 sqft |
| OPENED PORCH (WITH ROOF) : 307 sqft |
| Total Square Footage: 3784 sqft |
| Block: 00000 |
| Subdivision: 2117 - Town Center Phase III, BROOKHAVEN |
| Job Phone: 407-741-8500 |
| Location Address: 152 BROOKHAVEN CT N |
| Type: BM - BUILDING MULTI - APARTMENT |
| Issue Date: 09/27/2013 |
| NOC: RECORDED |
| Applicant name: SCOTT W CULP |
| Owner: BROOKHAVEN DEVELOPMENT LAND LTD |
|
Address 200 E CANTON AVE # 102 WINTER PARK, FL 32789 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤134,222.00 |
| Job Description: BUILDING 27 - BROOKHAVEN 3 UNIT APARTMENT |
| Type: CN |
Contractor
CPG CONSTRUCTION LLP
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
200 E CANTON AVE # 102 WINTER PARK, FL 32789 |
CGC1512998 (Exp: 08/31/2016) | 407-741-8500 | 407-643-2551 |
Sub Contractors
RANCE F BORDERICK
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
430 WEST DRIVE ALTAMONTE SPRINGS, FL 32714 |
EC0000981 (Exp: 08/31/2026) | (407)788-3500 | 407-788-2007 |
DAVID A CROSON
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
31550 COUNTY ROAD 437 SORRENTO, FL 32776 |
CFC1426109 (Exp: 08/31/2022) | 352-729-7100 | 352-735-0623 |
JOSEPH RICHARD CASSIDY JR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
17304 PHIL C PETERS RD WINTER GARDEN, FL 34787 |
CCC1327385 (Exp: 08/31/2020) | 407-654-4426 | (407)654-4307 |
JOHN MAXEN BARTKOVICH
| Status | Location Address | State License Number | Phone |
| ACTIVE |
818 SHADOWMOSS DR WINTERGARDEN, FL 32787 |
CAC1815793 (Exp: 08/31/2026) | 407-886-3729 |
Inspection History
| Type | Request Date | Result | Inspector |
| LDSC- LANDSCAPE FINAL | 04/16/2014 | APPROVED - AS NOTED | WBUTLER |
| Note: THIS IS A REINSPECTION Per Bill Butler approved with the follow notes: LANDSCAPE/ IRRIGATION FINALS FOR BROOKHAVEN BUILDINGS 26 and 27 Permit number 2013050233 (building 26) Permit number 2013050234 (building 27) 4-16-14 NOTE: THESE ITEMS WERE OUTSTANDING FROM THE LAST INSPECTION OF BUILDINGS 6, 7 AND 8. NEED TO REINSPECT AT THE NEXT BUILDING GROUP STAGE INSPECTION. 1. Need to build earthen watering dams around all trees to contain water from bubblers. 2. All splash blocks that empty directly into planting beds need to be removed and downspout extensions are to be installed to reach the edge of the lawn. Some areas may require the shifting of the foundation plants to provide a straight shot from the building to the grass. 3. In front of buildings 6, 7 and 8, need to install the correct nozzle ("G") to irrigate the sodded area. There are two in front of each building. 4. Need purple bubblers on all trees. Some of the paint on the PGJ heads is coming off so need to replace with factory purple heads. NEW COMMENTS FOR BUILDINGS 26 and 27: 1. Plant sizes that were installed are not per the approved plan or approved e-mail revisions. An e-mail was received from Ivan Maranan on 3/12/14 asking for the following changes to be made concerning plant material: - The foundation plantings around the buildings of viburnum suspensum have been changed to viburnum odoritissum (30" ht. x 24" spread, 36" o.c. - The dwarf Asiatic jasmine has been changed from 3 gallon to 1 gallon. - The ligustrum has been changed from 12' x 12" to 8' x 8' - Mulch has been changed from 3"depth to 2" depth Bill Butler approved all of these changes the same day and just noted that they be picked up on the as-built drawings. What was discovered in the field at the inspection were some viburnum suspensum in 3 gallon containers that were barely 24 inch tall screening the parking lot area between buildings 26 and 27 on the south side. The plans call for viburnum suspensum, 7 gallon, 30 inch height. Either change these plants to viburnum odoritissum that are 30 inches tall, or podocarpus 30 inches tall. 2. The parking lot was modified to use environmental curbing instead of 6 inch highback curb. Need to add parking stops for the cars and additionally add two parking stops on each side of the parking lot along the northern edge of the two northernmost parking spaces that are adjacent to the landscape islands to prevent cars from entering the islands. 3. Add Bahia sod along the north side of the crown grass planting adjacent to the wetland buffer anywhere there is bare soil. 4. Irrigation bubblers need to be purple for re-use irrigation. 5. Any downspouts that dump water into the planting beds need to have the splash blocks removed and downspout extensions added to carry water directly to the turf areas. Shrubs may need to be shifted as some are right in front of the downspout discharge. 6. At the south side of building 26, need to shift the podocarpus plantings to be a minimum of 2 foot from the water meter boxes to allow future access. 7. Need to build earthen watering dams around all trees to contain water from bubblers. 8. Missing the two G nozzle heads at the east and west sides of the entrance to the parking lot in the 2 foot wide strip between the sidewalk and the street. 9. Need to install flush plugs on all drip irrigation areas. Plugs should be in a 6" diameter valve box. 10. On the east side of building 27, need to add more ligustrum shrubs and curve the foundation plantings out to allow a minimum of 4' clearance to the electrical panel boxes on the wall. 11. On the southwest side of building 26, missing five spray heads (symbol w), that are intended to irrigate the sod. 12. These punchlist items will be reinspected at the time of the next inspection. The first four comments from the first inspection MUST be all completed by that time; otherwise no further landscape inspections will be approved. 13. Landscape and irrigation as-builts will be required for all units prior to the final inspection approval of the last building. | |||
| U - UTILITY COMMERCIAL FINAL | 04/14/2014 | FINAL APPROVED | DSPENCER |
| LDSC- LANDSCAPE FINAL | 04/14/2014 | CANCELLED BY APPLICANT | WBUTLER |
| Note: cancelled by Kevin Sutton. 263-2934 | |||
| FIRE FINAL | 04/11/2014 | APPROVED | JHINDMAN |
| BUILDING FINAL | 04/10/2014 | APPROVED | RMARVEL |
| PLUMBING FINAL | 04/10/2014 | APPROVED | RMARVEL |
| HVAC FINAL | 04/10/2014 | APPROVED | RMARVEL |
| ELECTRIC FINAL | 04/10/2014 | APPROVED | RMARVEL |
| ELECTRIC - EARLY POWER | 04/02/2014 | APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION Inspection Resulted at 4/2/2014 3:48:36 PM CALLED FPL AT 11:35 | |||
| ELECTRIC - EARLY POWER | 03/25/2014 | CANCELLED BY APPLICANT | JHINDMAN |
| FIREWALL | 02/19/2014 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| INSULATION | 02/17/2014 | APPROVED | JHINDMAN |
| ALL ROUGH | 02/14/2014 | APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 02/13/2014 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: Inspection Resulted at 2/13/2014 3:41:40 PM NOT READY. WORK IN PROGRESS. | |||
| FIREWALL | 02/13/2014 | PARTIALLY APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION Inspection Resulted at 2/13/2014 3:41:40 PM FIRE WALL AT TRUSS LEVEL PAINTED AT ROOF. | |||
| WINDOW NAILING | 02/10/2014 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| WINDOW NAILING | 02/07/2014 | CANCELLED BY APPLICANT | JHINDMAN |
| LATH/BRICK/WATER BARRIER | 02/06/2014 | APPROVED | JHINDMAN |
| GRAVITY SEWER | 01/27/2014 | APPROVED | JHINDMAN |
| U - SEWER TIE IN | 01/27/2014 | APPROVED | DSPENCER |
| FIREWALL | 01/07/2014 | PARTIALLY APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 1/7/2014 12:20:12 PM MUD AND TAPE | |||
| ELECTRIC 1ST ROUGH | 01/07/2014 | APPROVED | RMARVEL |
| EXTERIOR WALL SHEATHING / SHEARWALL | 12/31/2013 | APPROVED | RMARVEL |
| FIREWALL | 12/31/2013 | PARTIALLY APPROVED | JHINDMAN |
| Note: Inspection Resulted at 12/31/2013 12:33:13 PM FIREWALL ATTIC SCREWS | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 12/27/2013 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 12/26/2013 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: THIS IS A REINSPECTION Inspection Resulted at 12/26/2013 3:37:29 PM NOT READY FOR INSPECTION | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 12/04/2013 | CANCELLED BY APPLICANT | DROCKWELL |
| EXTERIOR STRAP/CLIP | 11/12/2013 | Disapproved -FEE REQUIRED | CMINI |
| Note: Inspection Resulted at 11/12/2013 3:30:36 PM MISSING EXTERIOR CLIPS | |||
| MONOLITHIC SLAB | 10/24/2013 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB | 10/23/2013 | Disapproved -FEE REQUIRED | CMINI |
| Note: Inspection Resulted at 10/23/2013 3:12:21 PM NEED TO MAINTAIN 20" DEPTH ON EXTERIOR FOOTERS NOT MET | |||
| ELECTRIC 1ST ROUGH | 10/23/2013 | APPROVED | CMINI |
| PLUMBING 1ST ROUGH | 10/18/2013 | APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION | |||
| PLUMBING 1ST ROUGH | 10/17/2013 | CANCELLED BY APPLICANT | RMARVEL |
| ELECTRIC TEMP POLE | 10/17/2013 | APPROVED | RMARVEL |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 03/26/2014 | 03/26/2014 |
| ELEC | COMPLETE | 01/08/2014 | 01/08/2014 |
| FI1 | COMPLETE | 12/30/2013 | 12/30/2013 |
| Note: Released By: JHINDMAN | |||
| BLD | COMPLETE | 12/26/2013 | 12/27/2013 |
| FI1 | HOLD | 12/26/2013 | 12/27/2013 |
| Note: 1. provide fire reatardant letter. | |||
| BLD | HOLD | 12/19/2013 | 12/20/2013 |
| Note: 1. Provide the correct strap ID for the Other straps. 2010 FBC 107.2.1. | |||
| ELEC | COMPLETE | 12/19/2013 | 12/19/2013 |
| MECH | COMPLETE | 12/19/2013 | 12/20/2013 |
| Note: Revision - Rev 4, Sheets AM2.1a/3.3 | |||
| PLUM | COMPLETE | 12/19/2013 | 12/20/2013 |
| Note: Rev 4, Sheets AP3.12/3.2/3.3/4.1 | |||
| BLD | COMPLETE | 12/12/2013 | 12/13/2013 |
| Note: Released By: JMCGOWEN Truss repair | |||
| BLD | COMPLETE | 12/11/2013 | 12/11/2013 |
| ELEC | COMPLETE | 12/11/2013 | 12/11/2013 |
| MECH | COMPLETE | 12/11/2013 | 12/11/2013 |
| Note: Revision 4 dated 11-18-13. | |||
| PLUM | COMPLETE | 12/11/2013 | 12/11/2013 |
| Note: Revision 4 dated 11-18-13. | |||
| FI1 | HOLD | 12/10/2013 | 12/11/2013 |
| Note: 1. According to the manufacturers specifications, Flame control No 20-20a (under new surfaces) states that No 20-20a will not give a fire resistive rating on metal surfaces. 2. The primer must also be compatible with the fire retardant. 2010 FBC 709.4.1.1 | |||
| BLD | HOLD | 11/19/2013 | 11/21/2013 |
| Note: Provide detailed scope of the revision and identified detail of affected area detail will need to be suitable for review, construction and inspection. as per our meeting and FBC 107.2.1 | |||
| BLD | COMPLETE | 11/14/2013 | 11/14/2013 |
| Note: Released By: JMCGOWEN revision, letter from D.P.O.R. on stud spacing | |||
| BLD | COMPLETE | 11/14/2013 | 11/15/2013 |
| Note: Released By: JMCGOWEN Truss repair | |||
| BLD | HOLD | 11/08/2013 | 11/08/2013 |
| Note: Held By: JHINDMAN 1. Provide a complete structural drawing for the header changes that is suitable for review, construction and inspection. 2010 FBC 107.2.1. | |||
| BLD | HOLD | 11/08/2013 | 11/08/2013 |
| Note: Held By: JHINDMAN 1. Provide a complete structural drawing for the header changes that is suitable for review, construction and inspection. 2010 FBC 107.2.1. | |||
| BLD | HOLD | 11/06/2013 | 11/06/2013 |
| Note: Held By: JHINDMAN 1. Provide clarification for the uplift value and the number of screws and that are required per stud to plate connection. 2010 FBC 107.2.1 | |||
| UD1 | COMPLETE | 10/16/2013 | 10/17/2013 |
| PLUM | COMPLETE | 10/16/2013 | 10/17/2013 |
| Note: Revision - revised underground sanitary/domestic water plumbing plans | |||
| UD1 | HOLD | 10/10/2013 | 10/11/2013 |
| Note: Each unit will require an individual water service and meter. | |||
| PLUM | HOLD | 10/10/2013 | 10/11/2013 |
| Note: 1. Provide sanitary riser diagram as shown on Sheet AP4.1 to match with submitted revised plumbing plans per 2010 FBC 107.2.1. 2. Verify the Building Type of plan title for clarification per 2010 FBC 107.2.1. | |||
| BLD | COMPLETE | 09/30/2013 | 09/30/2013 |
| BLD | HOLD | 09/23/2013 | 09/24/2013 |
| Note: 1. Provide signed and sealed drawings per 2010 FBC 107.1. | |||
| BLD | COMPLETE | 08/22/2013 | 08/22/2013 |
| BLD | HOLD | 08/07/2013 | 08/07/2013 |
| Note: 1. Provide roof truss engineering for review per 2010 FBC 107.3.5. | |||
| UD1 | COMPLETE | 08/07/2013 | 08/08/2013 |
| ZON | COMPLETE | 08/07/2013 | 08/08/2013 |
| PLLA | COMPLETE | 07/16/2013 | 07/16/2013 |
| Note: Released By: WBUTLER | |||
| BLD | HOLD | 07/08/2013 | 07/09/2013 |
| Note: 1. Provide roof truss engineering per 2010 FBR 107.3.5. | |||
| ENGIN1 | COMPLETE | 07/08/2013 | 07/09/2013 |
| FI1 | COMPLETE | 07/08/2013 | 07/09/2013 |
| MECH | COMPLETE | 07/08/2013 | 07/08/2013 |
| PLLA | HOLD | 07/08/2013 | 07/08/2013 |
| Note: Permit # 2013050276 Reviewer: Bill Butler, Landscape Architect 7-8-13 1. Need landscape and irrigation plans to be submitted for review and approval. | |||
| PLUM | COMPLETE | 07/08/2013 | 07/08/2013 |
| UD1 | HOLD | 07/08/2013 | 07/15/2013 |
| Note: Plans show single water service in to building. Each unit shall have individual service and meter located in green space outside of building in existing utility easement | |||
| BLD | HOLD | 05/10/2013 | 05/13/2013 |
| Note: Held By: FREODICA 1. Provide specific plans and details applicable to this permit application per 2010 FBC 107.2.1. | |||
| ELEC | COMPLETE | 05/10/2013 | 07/08/2013 |
| UD1 | COMPLETE | 05/10/2013 | 05/10/2013 |
| ZON | HOLD | 05/10/2013 | 07/15/2013 |
| Note: 1. On Sheet AA0.2, the gross square feet is stated as 3786 square feet. Adding up the provided Living area and Non A/C area, the total appears to be 3784 square feet. Please revise the table to reflect the correct area. 2. On Sheet AA2.1a, the table showing Gross Area lists the Non A/C area as 309 square feet; however, on Sheet AA0.2, the Non A/C area adds up to 307 square feet. Please revise the numbers as needed to consistently show the correct Gross and Non-A/C areas. 3. Please revise Sheet AA6.1 to to include the length and width dimensions of the buildings, which should match the previously approved elevations in the Development Order approval. 4. Please revise the plans to provide a screen porch elevation detailing the materials to be used on the screen enclosure, including any kickplates if applicable. 5. Per LDC Sec. 12.03.01.H and I, street address signs or building occupant signs affixed to the wall shall not exceed 2 square feet in sign copy area. Please revise the plans to include a detail of the "Brookhaven" occupant or street address wall sign to show the dimensions, not to exceed 2 square feet. 6. On Sheet AA6.1, please clarify whether the "B" located in or on the window in the dormer is a decal, a separate sign or part of the glass itself (i.e. stained glass). |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 04/16/2014 |
| REINSPECTION FEE | ¤40.00 | 04/16/2014 |
| REINSPECTION FEE | ¤40.00 | 04/16/2014 |
| REINSPECTION FEE | ¤40.00 | 04/16/2014 |
| REVISION | ¤40.00 | 04/16/2014 |
| REVISION | ¤40.00 | 04/16/2014 |
| REVISION | ¤40.00 | 04/16/2014 |
| REVISION | ¤40.00 | 04/16/2014 |
| REVISION | ¤40.00 | 04/16/2014 |
| REVISION | ¤40.00 | 04/16/2014 |
| REVISION | ¤40.00 | 04/16/2014 |
| REVISION | ¤40.00 | 04/16/2014 |
| REVISION | ¤40.00 | 04/16/2014 |
| REVISION | ¤40.00 | 04/16/2014 |
| REVISION | ¤40.00 | 04/16/2014 |
| REVISION | ¤40.00 | 04/16/2014 |
| REVISION | ¤40.00 | 04/16/2014 |
| REVISION | ¤40.00 | 04/16/2014 |
| REVISION | ¤40.00 | 04/16/2014 |
| REVISION | ¤40.00 | 04/16/2014 |
| REVISION | ¤40.00 | 04/16/2014 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤623.97 | 04/16/2014 |
| IMPACT FEE PARKS | ¤4,031.94 | 04/16/2014 |
| IMPACT FEE SCHOOL | ¤2,793.00 | 04/16/2014 |
| IMPACT FEE TRANSPORTATION | ¤8,146.80 | 04/16/2014 |
| INSPECTION FEE 20 | ¤20.00 | 04/16/2014 |
| MECHANICAL FEE | ¤288.60 | 09/27/2013 |
| PERMIT FEE | ¤2,095.50 | 09/27/2013 |
| PLAN CHECK FEE | ¤438.15 | 09/27/2013 |
| PLUMBING FEE | ¤288.60 | 09/27/2013 |
| FIRE PLANS REVIEW | ¤37.84 | 09/27/2013 |
| ADMIN COMMERCIAL | ¤60.00 | 09/27/2013 |
| ELECTRIC FEE | ¤288.60 | 09/27/2013 |
| SURCHARGE FS 533.721 | ¤51.89 | 09/27/2013 |
| SURCHARGE - FS 468.631 | ¤51.89 | 09/27/2013 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,056.78 |