I want to search for...
Permit #2013050241
Permit Details
Status: COED
| Parcel Id: 08-12-31-5835-00000-0010 |
| CONDITIONED SPACE: 2240 sqft |
| CONDITIONED SPACE: 2984 sqft |
| GARAGE: 996 sqft |
| OPENED PORCH (WITH ROOF) : 440 sqft |
| Total Square Footage: 6660 sqft |
| Block: 00000 |
| Subdivision: 2117 - Town Center Phase III, BROOKHAVEN |
| Job Phone: 407-741-8500 |
| Location Address: 171 BROOKHAVEN DR |
| Type: BM - BUILDING MULTI - APARTMENT |
| Issue Date: 11/13/2013 |
| NOC: RECORDED |
| Applicant name: SCOTT W CULP |
| Owner: BROOKHAVEN DEVELOPMENT LAND LTD |
|
Address 200 E CANTON AVE #102 WINTER PARK, FL 32789 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤310,085.00 |
| Job Description: BUILDING 5 - BROOKHAVEN 4 UNIT APARTMENT |
| Type: CN |
Contractor
CPG CONSTRUCTION LLP
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
200 E CANTON AVE # 102 WINTER PARK, FL 32789 |
CGC1512998 (Exp: 08/31/2016) | 407-741-8500 | 407-643-2551 |
Sub Contractors
RANCE F BORDERICK
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
430 WEST DRIVE ALTAMONTE SPRINGS, FL 32714 |
EC0000981 (Exp: 08/31/2026) | (407)788-3500 | 407-788-2007 |
DAVID A CROSON
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
31550 COUNTY ROAD 437 SORRENTO, FL 32776 |
CFC1426109 (Exp: 08/31/2022) | 352-729-7100 | 352-735-0623 |
JOSEPH RICHARD CASSIDY JR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
17304 PHIL C PETERS RD WINTER GARDEN, FL 34787 |
CCC1327385 (Exp: 08/31/2020) | 407-654-4426 | (407)654-4307 |
JOHN MAXEN BARTKOVICH
| Status | Location Address | State License Number | Phone |
| ACTIVE |
818 SHADOWMOSS DR WINTERGARDEN, FL 32787 |
CAC1815793 (Exp: 08/31/2026) | 407-886-3729 |
Inspection History
| Type | Request Date | Result | Inspector |
| LDSC- LANDSCAPE FINAL | 06/03/2014 | APPROVED - AS NOTED | WBUTLER |
| Note: Permit number 2013050241 (building 5) 6-3-14 General Comments: 1. Irrigation control wire problem with all areas in the Brookhaven development. Need to manually bleed on all valves periodically to insure plants, trees and sod does not die. Need to resolve this before the last unit gets its final inspection approval. 2. As-builts needed from project landscape architect before last unit gets final inspection approval. Building 5: 1. Replace oak tree in the rear that has major trunk damage by construction equipment. 2. Pull dirt and excess mulch off the top of the rootballs of the Indian hawthorn shrubs. Building 14: 1. Need to survey the upland buffer line on the west side of the building and then regrade the slope off the building to provide a less steep slope. Resod the lawn, tile the two downspouts in that area to outfall at the toe of the new slope, replant the muhly grass, mulch it and sod the disturbed area on the west side of the muhly grass bed with Bahia sod. 2. Both magnolia trees on the west end of the cul-de-sac are too small and need to be replaced. 3. Need to construct the shell walking trail on the east side of the building per the recently approved modifications to the plans. Adjust irrigation as needed. Building 15: 1. Fix broken concrete electric box in the front of the building. 2. Need to construct the shell walking trail behind the building per the recently approved modifications to the plans. Adjust irrigation as needed. Building 16: 1. Now that the sodding is complete behind the building, need to remove the silt fence. Building 17: 1. Sod the access area and pave the gap in the sidewalk after the construction on the gazebo behind the building is done. Building 13: 1. Need to replace the magnolia tree at the end of the cul-de-sac northwest of the building, as it is too small. Building 9: 1. Magnolia tree to the east of the building by the Fire protection line is not the required 3-1/2 inch caliper and 12 foot minimum height. Replace any other magnolia that does not meet this specification. Note, caliper may be approved at 3-1/4 inch, but not an eighth smaller. Building 10: 1. Replace the magnolia tree in the front of the house that is too small. STILL OUTSTANDING COMMENTS FOR BUILDINGS 25 AND 24 Building 25: 1. Replace broken concrete water meter box on the west side of parking lot entrance. Building 24 1. Need to re-grade the rear of the building so the water drains positively away from the building. Re-sod any disturbed area. Building perimeter floods when irrigation is on or it rains. 2. Replace dead trees and shrubs that died due to poor drainage and downspouts not being tiled out of the bed areas. Building 22: 1. Replace dead plants and trees that died due to poor drainage. Building 23: 1. Replace dead plants and trees that died due to poor drainage. Replace dead magnolia tree in parking lot island. | |||
| U - UTILITY COMMERCIAL FINAL | 06/03/2014 | FINAL APPROVED | DSPENCER |
| LDSC- LANDSCAPE FINAL | 05/30/2014 | CANCELLED BY APPLICANT | AIRS WEB |
| U - UTILITY COMMERCIAL FINAL | 05/30/2014 | CANCELLED BY APPLICANT | AIRS WEB |
| PLUMBING FINAL | 05/27/2014 | APPROVED | RMARVEL |
| HVAC FINAL | 05/27/2014 | APPROVED | RMARVEL |
| ELECTRIC FINAL | 05/27/2014 | APPROVED | RMARVEL |
| BUILDING FINAL | 05/27/2014 | FINAL APPROVED | RMARVEL |
| FIRE FINAL | 05/23/2014 | APPROVED | JHINDMAN |
| ELECTRIC - EARLY POWER | 05/02/2014 | APPROVED | RMARVEL |
| LATH/BRICK/WATER BARRIER | 04/14/2014 | APPROVED | RMARVEL |
| GRAVITY SEWER | 04/11/2014 | APPROVED | RMARVEL |
| U - SEWER TIE IN | 04/11/2014 | APPROVED | DSPENCER |
| FIREWALL | 03/26/2014 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| INSULATION | 03/24/2014 | APPROVED | JHINDMAN |
| ALL ROUGH | 03/21/2014 | APPROVED | RMARVEL |
| FIREWALL | 03/21/2014 | PARTIALLY APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 3/21/2014 2:30:05 PM FIRE RETARDANT | |||
| FIREWALL | 03/13/2014 | PARTIALLY APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 3/13/2014 3:40:06 PM TAPE AT CHASEWALLS | |||
| ELECTRIC 1ST ROUGH | 03/12/2014 | APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION | |||
| FIREWALL | 03/10/2014 | PARTIALLY APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 3/10/2014 2:41:43 PM CHASEWALL SCREWS | |||
| EXTERIOR WALL SHEATHING / SHEARWALL | 03/05/2014 | APPROVED | RMARVEL |
| ROOF SHEATHING / BRACE / TIE DOWN | 03/05/2014 | APPROVED | RMARVEL |
| EXTERIOR STRAP/CLIP | 03/05/2014 | APPROVED | RMARVEL |
| FIREWALL | 01/31/2014 | PARTIALLY APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 1/31/2014 12:54:55 PM TAPE IN ATTIC | |||
| FIREWALL | 01/27/2014 | PARTIALLY APPROVED | JHINDMAN |
| Note: Inspection Resulted at 1/27/2014 1:25:18 PM ATTIC SCREWS | |||
| MONOLITHIC SLAB | 12/02/2013 | APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB | 11/26/2013 | Disapproved -FEE REQUIRED | CMINI |
| Note: Inspection Resulted at 11/26/2013 2:55:16 PM DETAIL 5A DOES NOT MATCH WORK DONE..NEED CORRECTION | |||
| ELECTRIC 1ST ROUGH | 11/26/2013 | Disapproved - NO FEE | CMINI |
| Note: Inspection Resulted at 11/26/2013 2:55:17 PM SLAB NOT READY | |||
| PLUMBING 1ST ROUGH | 11/18/2013 | APPROVED | CMINI |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 05/06/2014 | 05/07/2014 |
| BLD | COMPLETE | 02/10/2014 | 02/10/2014 |
| ELEC | COMPLETE | 02/10/2014 | 02/10/2014 |
| FI1 | COMPLETE | 02/10/2014 | 02/10/2014 |
| PLUM | COMPLETE | 02/10/2014 | 02/10/2014 |
| Note: Revision - Changed sanitary riser diagram, sheet P3.3b, rev. 5. | |||
| BLD | COMPLETE | 12/30/2013 | 12/31/2013 |
| FI1 | COMPLETE | 12/30/2013 | 12/30/2013 |
| Note: Released By: JHINDMAN | |||
| ELEC | COMPLETE | 12/11/2013 | 12/12/2013 |
| FI1 | HOLD | 12/11/2013 | 12/12/2013 |
| Note: . According to the manufacturers specifications, Flame control No 20-20a (under new surfaces) states that No 20-20a will not give a fire resistive rating on metal surfaces. 2. The primer must also be compatible with the fire retardant. 2010 FBC 709.4.1.1 | |||
| MECH | COMPLETE | 12/11/2013 | 12/12/2013 |
| Note: Revision 4 dated 11-18-13 | |||
| PLUM | COMPLETE | 12/11/2013 | 12/12/2013 |
| Note: Revision 4 dated 11-18-13 | |||
| BLD | COMPLETE | 11/19/2013 | 12/13/2013 |
| BLD | COMPLETE | 11/14/2013 | 11/14/2013 |
| Note: Released By: JMCGOWEN revision, letter from D.P.O.R. on stud spacing | |||
| BLD | COMPLETE | 11/14/2013 | 11/15/2013 |
| Note: Released By: JMCGOWEN truss repair | |||
| BLD | HOLD | 11/08/2013 | 11/08/2013 |
| Note: Held By: JHINDMAN 1. Provide a complete structural drawing for the header changes that is suitable for review, construction and inspection. 2010 FBC 107.2.1. | |||
| BLD | HOLD | 11/08/2013 | 11/08/2013 |
| Note: Held By: JHINDMAN 1. Provide a complete structural drawing for the header changes that is suitable for review, construction and inspection. 2010 FBC 107.2.1. | |||
| BLD | HOLD | 11/06/2013 | 11/06/2013 |
| Note: Held By: JHINDMAN 1. Provide clarification for the uplift value and the number of screws and that are required per stud to plate connection. 2010 FBC 107.2.1 | |||
| BLD | COMPLETE | 09/30/2013 | 09/30/2013 |
| BLD | HOLD | 09/23/2013 | 09/24/2013 |
| Note: 1. Provide signed and sealed drawings per 2010 FBC 107.1. | |||
| BLD | COMPLETE | 08/22/2013 | 08/22/2013 |
| FI1 | COMPLETE | 08/22/2013 | 08/22/2013 |
| ZON | COMPLETE | 08/22/2013 | 08/22/2013 |
| ENGIN1 | COMPLETE | 08/22/2013 | 08/23/2013 |
| FI1 | HOLD | 08/08/2013 | 08/08/2013 |
| Note: Provide a Maltese Cross with a RF designation per 2010 F.A.C. 69 A. | |||
| BLD | HOLD | 08/08/2013 | 08/08/2013 |
| Note: Provide roof and floor truss engineering per 2010 FBC 107.3.5. | |||
| ZON | HOLD | 08/08/2013 | 08/08/2013 |
| Note: 1. Although the Area and Height Limitation table on Sheet A1.0 was revised, it appears that the area called out (3,687 square feet) only represents the 1st floor of the building, inclusive of the riser closet and tenant separation space. Please revise the table to reflect the total building area of 6,671 square feet. 2. The revised sheet A6.4 shows that the side elevation dimension is 51 ft-6 in. from the front face of the garages to the outer limit of the column at the rear patio. The color elevations approved with the Development Order show that same dimension at 51 ft-2 in. Please revise the plans so that the dimension matches the approved color elevations incorporated into the Development Order. As an alternative, a modification can be made to the Development Order by submitting a new color elevation with the corrected dimension consistent with the dimension shown on the elevations in the Building Permit set. | |||
| ENGIN1 | COMPLETE | 08/08/2013 | 08/12/2013 |
| BLD | HOLD | 07/09/2013 | 07/10/2013 |
| Note: 1. Provide roof and floor truss engineering per 2010 FBC 107.3.5. | |||
| ELEC | COMPLETE | 07/09/2013 | 07/10/2013 |
| ENGIN1 | COMPLETE | 07/09/2013 | 07/11/2013 |
| FI1 | HOLD | 07/09/2013 | 07/10/2013 |
| Note: 1. Provide a Maltese Cross with a RF designation per F. A. C. 69A. | |||
| MECH | COMPLETE | 07/09/2013 | 07/10/2013 |
| PLLA | COMPLETE | 07/09/2013 | 07/10/2013 |
| PLUM | COMPLETE | 07/09/2013 | 07/10/2013 |
| Note: Released By: BBEMBRY | |||
| UD1 | COMPLETE | 07/09/2013 | 07/15/2013 |
| BLD | HOLD | 05/10/2013 | 05/13/2013 |
| Note: Held By: FREODICA 1. Provide specific plans and details applicable to this permit application per 2010 FBC 107.2.1. | |||
| ZON | HOLD | 05/10/2013 | 07/16/2013 |
| Note: 1. On Sheet A0.2a, there are inconsistencies in the building area data when the two provided tables are compared to each other. One table states that the 1st floor A/C area per unit is 560 SF, and the 1st floor non-A/C area (garage and porches) is 359 SF for a total of 919 SF of Non-A/C area. 919 SF x 4 units is 3676 SF, but the second table shows 3687 SF gross. Also, the total gross area per unit on one table is 1665 SF and 1665 SF x 4 units is 6660 SF, but the second table GSF is stated as 6671 SF. Please revise the data tables so that the building areas expressed on them are consistent with each other. 2. On Sheet A1.0, the Area and Height Limitation Table makes references to the 1-Story Villa buildings. Please revise the table so that all references and data correspond to the Townhouse style buildings. 3. On Sheet A1.0, the reference plan or key plan showing the building locations incorrectly labels Building 15 as a “CCCCCC” type building and the callout is “greyed” out. Please revise to show Building 15 as a “CCCC” type building and show the callout in black. 4. Please revise the TH-4 Area Calculations on Sheets A2.4a and A2.4b to be consistent with the area calculations (once revised) found on Sheet A0.2a. The Non-A/C area found on sheet A0.2a is stated as 359 SF, and 359 SF x 4 units is 1436 SF, not 1447 SF. Also, the total GSF appears to be 6660 SF. 5. Please revise the plans to state that all metal roof fasteners must be color matched to the roof panels. 6. Please revise the plans to provide screen porch elevations detailing the materials to be used on the screen enclosures, including any kickplates if applicable. 7. Please revise sheet A6.4 to include the length and width dimensions of the buildings, which should match the previously approved elevations in the Development Order approval. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 06/04/2014 |
| REVISION | ¤40.00 | 06/04/2014 |
| REVISION | ¤40.00 | 06/04/2014 |
| REVISION | ¤40.00 | 06/04/2014 |
| REVISION | ¤40.00 | 06/04/2014 |
| REVISION | ¤40.00 | 06/04/2014 |
| REVISION | ¤40.00 | 06/04/2014 |
| REVISION | ¤40.00 | 06/04/2014 |
| REVISION | ¤40.00 | 06/04/2014 |
| REVISION | ¤40.00 | 06/04/2014 |
| REVISION | ¤40.00 | 06/04/2014 |
| REVISION | ¤40.00 | 06/04/2014 |
| REVISION | ¤40.00 | 06/04/2014 |
| REVISION | ¤40.00 | 06/04/2014 |
| REVISION | ¤40.00 | 06/04/2014 |
| REVISION | ¤40.00 | 06/04/2014 |
| REVISION | ¤40.00 | 06/04/2014 |
| REVISION | ¤40.00 | 06/04/2014 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤831.96 | 06/04/2014 |
| IMPACT FEE SCHOOL | ¤3,724.00 | 06/04/2014 |
| IMPACT FEE TRANSPORTATION | ¤10,862.40 | 06/04/2014 |
| INSPECTION FEE 20 | ¤20.00 | 06/04/2014 |
| PARKS IMPACT FEE | ¤3,576.96 | 06/04/2014 |
| PLAN CHECK FEE | ¤702.65 | 11/13/2013 |
| PLUMBING FEE | ¤426.60 | 11/13/2013 |
| MECHANICAL FEE | ¤426.60 | 11/13/2013 |
| PERMIT FEE | ¤3,360.50 | 11/13/2013 |
| FIRE PLANS REVIEW | ¤66.60 | 11/13/2013 |
| ADMIN COMMERCIAL | ¤60.00 | 11/13/2013 |
| ELECTRIC FEE | ¤426.60 | 11/13/2013 |
| SURCHARGE FS 533.721 | ¤81.05 | 11/13/2013 |
| SURCHARGE - FS 468.631 | ¤81.05 | 11/13/2013 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤25,366.97 |