I want to search for...

Permit #2013050242

Permit Details

Status: COED

Parcel Id: 08-12-31-5835-00000-0010
CONDITIONED SPACE: 2240 sqft
CONDITIONED SPACE: 2984 sqft
GARAGE: 996 sqft
OPENED PORCH (WITH ROOF) : 440 sqft
Total Square Footage: 6660 sqft
Block: 00000
Subdivision: 2117 - Town Center Phase III, BROOKHAVEN
Job Phone: 407-741-8500
Location Address: 109 BROOKHAVEN CV
Type: BM - BUILDING MULTI - APARTMENT
Issue Date: 10/11/2013
NOC: RECORDED
Applicant name: SCOTT W CULP
Owner: BROOKHAVEN DEVELOPMENT LAND LTD

Address

200 E CANTON AVE # 102

WINTER PARK, FL 32789

Lot: 0010
Contracted Stated Job Value: ¤310,085.00
Job Description: BUILDING 6 - BROOKHAVEN 4 UNIT APARTMENT
Type: CN

Contractor

CPG CONSTRUCTION LLP
Status Location Address State License Number Phone Fax
CANCEL

200 E CANTON AVE # 102

WINTER PARK, FL 32789

CGC1512998 (Exp: 08/31/2016) 407-741-8500 407-643-2551

Sub Contractors

RANCE F BORDERICK
Status Location Address State License Number Phone Fax
ACTIVE

430 WEST DRIVE

ALTAMONTE SPRINGS, FL 32714

EC0000981 (Exp: 08/31/2026) (407)788-3500 407-788-2007
DAVID A CROSON
Status Location Address State License Number Phone Fax
CANCEL

31550 COUNTY ROAD 437

SORRENTO, FL 32776

CFC1426109 (Exp: 08/31/2022) 352-729-7100 352-735-0623
JOSEPH RICHARD CASSIDY JR
Status Location Address State License Number Phone Fax
CANCEL

17304 PHIL C PETERS RD

WINTER GARDEN, FL 34787

CCC1327385 (Exp: 08/31/2020) 407-654-4426 (407)654-4307
JOHN MAXEN BARTKOVICH
Status Location Address State License Number Phone
ACTIVE

818 SHADOWMOSS DR

WINTERGARDEN, FL 32787

CAC1815793 (Exp: 08/31/2026) 407-886-3729

Inspection History

Type Request Date Result Inspector
FIRE FINAL 04/07/2014 APPROVED JHINDMAN
LDSC- LANDSCAPE FINAL 04/07/2014 APPROVED - AS NOTED WBUTLER
Note: LANDSCAPE/ IRRIGATION FINALS FOR BROOKHAVEN BUILDINGS 6, 7 AND 8 Permit number 2013050242 (building 6) Permit number 2013050243 (building 7) Permit number 2013050244 (building 8) 4-7-14 NOTE: THESE ITEMS WILL BE REINSPECTED AT THE NEXT BUILDING GROUP STAGE INSPECTION 1. Landscape buffer on the east side of buildings 6 and 7 not planted per the approved plan. Need to re-space magnolia and wax myrtle trees and add as needed. Due to existing natural vegetation and trees at the south end of the buffer, the last two magnolias and the last 6 wax myrtles do not need to be planted and irrigated. Can pick this change up on the as-builts. 2. Need to build earthen watering dams around all trees to contain water from bubblers. 3. The concrete splash blocks between the buildings and sidewalks need to be turned 90 degrees and elevated such that the water coming from the downspouts flows out of the bed and onto the sidewalk. One splash block near the west entrance to building 7 is broken and needs to be replaced. All other splash blocks that empty directly into planting beds need to be removed and downspout extensions are to be installed to reach the edge of the lawn. Some areas may require the shifting of the foundation plants to provide a straight shot from the building to the grass. 4. Add 3 more podocarpus between the sidewalk and the backflow preventer pad to screen this unit from street view. Pick up on as-built. 5. Check for possible irrigation leak in sod behind building 7. 6. Add bubblers to the trees that are currently being planted at the south end of the eastern landscape buffer. 7. Move one rotor head closer to the parking lot directly east of building 6. This head is blasting into a wax myrtle tree. 8. At the north side of the planting bed around the FPL transformer, change the irrigation head from a rotor head to a PGJ head. 9. Add missing spray head "Y" to the east corner of the three parking spaces west of building 6. Move adjacent head "H" to center in the area. 10. Missing a full circle PGJ head in the sod behind building 8. 11. In front of buildings 6, 7 and 8, need to install the correct nozzle ("G") to irrigate the sodded area. There are two in front of each building. 12. Need purple bubblers on all trees. Some of the paint on the PGJ heads is coming off so need to replace with factory purple heads. 13. Need landscape and irrigation as-builts provided that are signed and sealed by a registered Florida landscape architect. These will be required prior to the certificate of occupancy of the last unit. Make sure the following is provided: - Measurements from two fixed points for all valve boxes, drip zone flush plugs and wire splices. - The as-built irrigation plan zone numbering agrees with the way the controller is wired. - A card in the controller indicating the general area that zone operates and what type of zone it is (spray, rotor or drip) - Any deviations from the approved plan must be indicated.
U - UTILITY COMMERCIAL FINAL 04/07/2014 FINAL APPROVED DSPENCER
PLUMBING FINAL 04/04/2014 APPROVED RMARVEL
HVAC FINAL 04/04/2014 APPROVED RMARVEL
ELECTRIC FINAL 04/04/2014 APPROVED RMARVEL
BUILDING FINAL 04/04/2014 APPROVED RMARVEL
FIREWALL 03/24/2014 APPROVED JHINDMAN
Note: THIS IS A REINSPECTION
ELECTRIC - EARLY POWER 03/19/2014 APPROVED RMARVEL
Note: Inspection Resulted at 3/19/2014 3:23:36 PM CALLED FPL AT 11:17
U - SEWER TIE IN 03/05/2014 APPROVED DSPENCER
GRAVITY SEWER 03/04/2014 APPROVED JHINDMAN
FIREWALL 02/11/2014 PARTIALLY APPROVED RMARVEL
Note: THIS IS A REINSPECTION Inspection Resulted at 2/11/2014 3:20:05 PM TAPE AND MUD FIRE WALLS BEFORE SOUND LAYER IS INSTALLED COMPLETE.
FIREWALL 02/10/2014 Disapproved -FEE REQUIRED CMINI
Note: Inspection Resulted at 2/10/2014 3:28:57 PM 1ST LAYER IS FIRE RATED ASSEMBLY NEEDS TO BE TAPED AND COMPOUND NOT AT SOUND BARRIER
INSULATION 02/07/2014 CANCELLED BY APPLICANT JHINDMAN
INSULATION 02/07/2014 APPROVED JHINDMAN
Note: THIS IS A REINSPECTION AFTER HOUR INSPECTION
LATH/BRICK/WATER BARRIER 02/06/2014 APPROVED JHINDMAN
ALL ROUGH 02/06/2014 APPROVED JHINDMAN
FIREWALL 02/06/2014 APPROVED JHINDMAN
Note: THIS IS A REINSPECTION
ELECTRIC 1ST ROUGH 02/05/2014 APPROVED JHINDMAN
Note: Inspection Resulted at 2/5/2014 12:54:37 PM UNDERGROUND SERVICE PIPING
FIREWALL 01/24/2014 PARTIALLY APPROVED JHINDMAN
Note: THIS IS A REINSPECTION wall taping
FIREWALL 01/21/2014 PARTIALLY APPROVED JHINDMAN
Note: THIS IS A REINSPECTION Inspection Resulted at 1/21/2014 12:44:33 PM ATTIC SCREWS
EXTERIOR WALL SHEATHING / SHEARWALL 01/15/2014 APPROVED DROCKWELL
ROOF SHEATHING / BRACE / TIE DOWN 01/15/2014 APPROVED DROCKWELL
EXTERIOR STRAP/CLIP 01/15/2014 APPROVED DROCKWELL
FIREWALL 01/10/2014 PARTIALLY APPROVED JHINDMAN
Note: THIS IS A REINSPECTION Inspection Resulted at 1/10/2014 2:24:04 PM ATTIC TAPING
FIREWALL 01/08/2014 PARTIALLY APPROVED JHINDMAN
Note: Inspection Resulted at 1/8/2014 1:53:56 PM SCREWSI N ATTIC
ELECTRIC TEMP POLE 11/12/2013 APPROVED CMINI
Note: Inspection Resulted at 11/12/2013 3:30:39 PM CALLED FPL TO RELEASE POWER AT 3:00,SPOKE WITH EMILY
MONOLITHIC SLAB 10/31/2013 APPROVED RMARVEL
ELECTRIC 1ST ROUGH 10/31/2013 APPROVED RMARVEL
Note: Inspection Resulted at 10/31/2013 2:55:16 PM UFER
PLUMBING 1ST ROUGH 10/28/2013 APPROVED CMINI

Review History

Department Status Date In Date Out
BLD COMPLETE 02/10/2014 02/10/2014
Note: Revisions 5 and 6.
ELEC COMPLETE 02/10/2014 02/10/2014
FI1 COMPLETE 02/10/2014 02/10/2014
PLUM COMPLETE 02/10/2014 02/10/2014
Note: Revision - Changed sanitary riser diagram, sheet P3.3b, rev. 5.
BLD COMPLETE 12/30/2013 12/31/2013
FI1 COMPLETE 12/30/2013 12/30/2013
Note: Released By: JHINDMAN
ELEC COMPLETE 12/11/2013 12/12/2013
FI1 HOLD 12/11/2013 12/12/2013
Note: . According to the manufacturers specifications, Flame control No 20-20a (under new surfaces) states that No 20-20a will not give a fire resistive rating on metal surfaces. 2. The primer must also be compatible with the fire retardant. 2010 FBC 709.4.1.1
MECH COMPLETE 12/11/2013 12/12/2013
Note: Revision 4 dated 11-18-13.
PLUM COMPLETE 12/11/2013 12/12/2013
Note: Revision 4 dated 11-18-13.
BLD COMPLETE 11/19/2013 12/13/2013
BLD COMPLETE 11/14/2013 11/14/2013
Note: Released By: JMCGOWEN revision, letter from D.P.O.R. on stud spacing
BLD HOLD 11/14/2013 11/15/2013
Note: Divide plans into building types that corresponds with the associate permits FBC 107.2.1
BLD HOLD 11/08/2013 11/08/2013
Note: Held By: JHINDMAN 1. Provide a complete structural drawing for the header changes that is suitable for review, construction and inspection. 2010 FBC 107.2.1.
BLD HOLD 11/08/2013 11/08/2013
Note: Held By: JHINDMAN 1. Provide a complete structural drawing for the header changes that is suitable for review, construction and inspection. 2010 FBC 107.2.1.
BLD HOLD 11/06/2013 11/06/2013
Note: Held By: JHINDMAN 1. Provide clarification for the uplift value and the number of screws and that are required per stud to plate connection. 2010 FBC 107.2.1
BLD COMPLETE 09/30/2013 09/30/2013
BLD HOLD 09/23/2013 09/24/2013
Note: 1. Provide signed and sealed drawings per 2010 FBC 107.1.
BLD COMPLETE 08/22/2013 08/22/2013
FI1 COMPLETE 08/22/2013 08/22/2013
ZON COMPLETE 08/22/2013 08/22/2013
FI1 HOLD 08/08/2013 08/08/2013
Note: 1. The Maltese Cross on page A0.3A does not have a R F designation per F.A.C.69A.
BLD HOLD 08/08/2013 08/08/2013
Note: Provide roof and floor truss engineering per 2010 FBC 107.3.5.
ZON HOLD 08/08/2013 08/08/2013
Note: 1. Although the Area and Height Limitation table on Sheet A1.0 was revised, it appears that the area called out (3,687 square feet) only represents the 1st floor of the building, inclusive of the riser closet and tenant separation space. Please revise the table to reflect the total building area of 6,671 square feet. 2. The revised sheet A6.4 shows that the side elevation dimension is 51 ft-6 in. from the front face of the garages to the outer limit of the column at the rear patio. The color elevations approved with the Development Order show that same dimension at 51 ft-2 in. Please revise the plans so that the dimension matches the approved color elevations incorporated into the Development Order. As an alternative, a modification can be made to the Development Order by submitting a new color elevation with the corrected dimension consistent with the dimension shown on the elevations in the Building Permit set.
BLD HOLD 07/09/2013 07/10/2013
Note: 1. Provide roof and floor truss engineering per 2010 FBC 107.3.5.
ELEC COMPLETE 07/09/2013 07/10/2013
ENGIN1 COMPLETE 07/09/2013 07/11/2013
FI1 HOLD 07/09/2013 07/10/2013
Note: 1. Provide a Maltese Cross with a RF designation per F.A.C. 69A
MECH COMPLETE 07/09/2013 07/10/2013
PLLA COMPLETE 07/09/2013 07/10/2013
PLUM COMPLETE 07/09/2013 07/10/2013
UD1 COMPLETE 07/09/2013 07/15/2013
BLD HOLD 05/10/2013 05/13/2013
Note: Held By: FREODICA 1. Provide specific plans and details applicable to this permit application per 2010 FBC 107.2.1.
ZON HOLD 05/10/2013 07/16/2013
Note: 1. On Sheet A0.2a, there are inconsistencies in the building area data when the two provided tables are compared to each other. One table states that the 1st floor A/C area per unit is 560 SF, and the 1st floor non-A/C area (garage and porches) is 359 SF for a total of 919 SF of Non-A/C area. 919 SF x 4 units is 3676 SF, but the second table shows 3687 SF gross. Also, the total gross area per unit on one table is 1665 SF and 1665 SF x 4 units is 6660 SF, but the second table GSF is stated as 6671 SF. Please revise the data tables so that the building areas expressed on them are consistent with each other. 2. On Sheet A1.0, the Area and Height Limitation Table makes references to the 1-Story Villa buildings. Please revise the table so that all references and data correspond to the Townhouse style buildings. 3. On Sheet A1.0, the reference plan or key plan showing the building locations incorrectly labels Building 15 as a “CCCCCC” type building and the callout is “greyed” out. Please revise to show Building 15 as a “CCCC” type building and show the callout in black. 4. Please revise the TH-4 Area Calculations on Sheets A2.4a and A2.4b to be consistent with the area calculations (once revised) found on Sheet A0.2a. The Non-A/C area found on sheet A0.2a is stated as 359 SF, and 359 SF x 4 units is 1436 SF, not 1447 SF. Also, the total GSF appears to be 6660 SF. 5. Please revise the plans to state that all metal roof fasteners must be color matched to the roof panels. 6. Please revise the plans to provide screen porch elevations detailing the materials to be used on the screen enclosures, including any kickplates if applicable. 7. Please revise sheet A6.4 to include the length and width dimensions of the buildings, which should match the previously approved elevations in the Development Order approval.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
IMPACT FEE FIRE NONRESIDENTIAL ¤831.96 04/01/2014
IMPACT FEE PARKS 04/01/2014
IMPACT FEE SCHOOL ¤3,724.00 04/01/2014
IMPACT FEE TRANSPORTATION ¤10,862.40 04/01/2014
INSPECTION FEE 20 ¤20.00 04/01/2014
REVISION ¤40.00 04/01/2014
REVISION ¤40.00 04/01/2014
REVISION ¤40.00 04/01/2014
REVISION ¤40.00 04/01/2014
REVISION ¤40.00 04/01/2014
REVISION ¤40.00 04/01/2014
REVISION ¤40.00 04/01/2014
REVISION ¤40.00 04/01/2014
REVISION ¤40.00 04/01/2014
REVISION ¤40.00 04/01/2014
REVISION ¤40.00 04/01/2014
REINSPECTION FEE ¤40.00 04/01/2014
REVISION ¤40.00 04/01/2014
ADDITIONAL FEE ¤200.00 02/07/2014
ADMIN COMMERCIAL (¤60.00) 10/11/2013
ADMIN COMMERCIAL ¤60.00 10/11/2013
ADMIN COMMERCIAL ¤60.00 10/11/2013
ELECTRIC FEE ¤426.60 10/11/2013
ELECTRIC FEE (¤426.60) 10/11/2013
ELECTRIC FEE ¤426.60 10/11/2013
FIRE PLANS REVIEW (¤66.60) 10/11/2013
FIRE PLANS REVIEW ¤66.60 10/11/2013
FIRE PLANS REVIEW ¤66.60 10/11/2013
MECHANICAL FEE ¤426.60 10/11/2013
MECHANICAL FEE (¤426.60) 10/11/2013
MECHANICAL FEE ¤426.60 10/11/2013
PERMIT FEE (¤3,360.50) 10/11/2013
PERMIT FEE ¤3,360.50 10/11/2013
PERMIT FEE ¤3,360.50 10/11/2013
PLAN CHECK FEE ¤702.65 10/11/2013
PLAN CHECK FEE (¤702.65) 10/11/2013
PLAN CHECK FEE ¤702.65 10/11/2013
PLUMBING FEE (¤426.60) 10/11/2013
PLUMBING FEE ¤426.60 10/11/2013
PLUMBING FEE ¤426.60 10/11/2013
SURCHARGE FS 533.721 ¤81.05 10/11/2013
SURCHARGE FS 533.721 (¤81.05) 10/11/2013
SURCHARGE FS 533.721 ¤81.05 10/11/2013
SURCHARGE - FS 468.631 (¤81.05) 10/11/2013
SURCHARGE - FS 468.631 ¤81.05 10/11/2013
SURCHARGE - FS 468.631 ¤81.05 10/11/2013
REVISION ¤40.00 10/11/2013
REVISION (¤40.00) 10/11/2013
Fees Total Due: ¤0.00 Total Paid: ¤21,790.01