I want to search for...
Permit #2013050273
Permit Details
Status: COED
| Parcel Id: 08-12-31-5835-00000-0010 |
| CONDITIONED SPACE: 3360 sqft |
| CONDITIONED SPACE: 4476 sqft |
| GARAGE: 1494 sqft |
| OPENED PORCH (WITH ROOF) : 660 sqft |
| Total Square Footage: 9990 sqft |
| Block: 00000 |
| Subdivision: 2117 - Town Center Phase III, BROOKHAVEN |
| Job Phone: 407-741-8500 |
| Location Address: 160 BROOKHAVEN CT S |
| Type: BM - BUILDING MULTI - APARTMENT |
| Issue Date: 10/11/2013 |
| NOC: RECORDED |
| Applicant name: SCOTT W CULP |
| Owner: BROOKHAVEN DEVELOPMENT LAND LTD |
|
Address 200 E CANTON AVE # 102 WINTER PARK, FL 32789 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤465,021.00 |
| Job Description: BUILDING 17 - BROOKHAVEN 6 UNIT APARTMENT |
| Type: CN |
Contractor
CPG CONSTRUCTION LLP
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
200 E CANTON AVE # 102 WINTER PARK, FL 32789 |
CGC1512998 (Exp: 08/31/2016) | 407-741-8500 | 407-643-2551 |
Sub Contractors
RANCE F BORDERICK
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
430 WEST DRIVE ALTAMONTE SPRINGS, FL 32714 |
EC0000981 (Exp: 08/31/2026) | (407)788-3500 | 407-788-2007 |
DAVID A CROSON
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
31550 COUNTY ROAD 437 SORRENTO, FL 32776 |
CFC1426109 (Exp: 08/31/2022) | 352-729-7100 | 352-735-0623 |
JOSEPH RICHARD CASSIDY JR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
17304 PHIL C PETERS RD WINTER GARDEN, FL 34787 |
CCC1327385 (Exp: 08/31/2020) | 407-654-4426 | (407)654-4307 |
JOHN MAXEN BARTKOVICH
| Status | Location Address | State License Number | Phone |
| ACTIVE |
818 SHADOWMOSS DR WINTERGARDEN, FL 32787 |
CAC1815793 (Exp: 08/31/2026) | 407-886-3729 |
Inspection History
| Type | Request Date | Result | Inspector |
| LDSC- LANDSCAPE FINAL | 05/12/2014 | APPROVED - AS NOTED | WBUTLER |
| Note: Permit number 2013050273 (building 17) 5-12-14 General Comments: 1. Irrigation control wire problem with all areas in the Brookhaven development. Need to manually bleed on all valves periodically to insure plants, trees and sod does not die. Need to resolve this before the last unit gets its final inspection approval. 2. As-builts needed from project landscape architect before last unit gets final inspection approval. 3. "Required Clearances and Maintenance issues around Fire Hydrant". Clearance of 71/2 feet on each side and 4 feet behind and nothing in front of hydrant. This includes small plants and bushes and trees around hydrants. Also, 3 feet clearances around the meters and backflow units are required. 4. Need to excavate around water meter boxes where dirt has sunk out and put filter cloth over the openings where dirt is entering boxes. Fill voids around box and replace sod Building 16: 1. Right rear corner of the building there was some work being done on the a/c units and a ligustrum shrub was destroyed and needs replacement. Also fix all disturbed areas by the a/c units behind the building when work is done and remulch the area. 2. Need to finish sodding behind the building all the way to the silt fence when the construction access is no longer needed. 3. Left front corner is missing one spray head in the sod area. 4. Southwest corner of the building, need to move a spray head a little further into the sod as it is right at the bed line and subject to damage by edgers. 5. Flood bubbler on a tree in the rear of the building does not have the fitting painted purple. Check all tree bubblers to make sure they all have them painted purple. Building 17: 1. Sod the access area and pave the gap in the sidewalk after the construction on the gazebo behind the building is done. 2. Landscape the bare areas behind the patios behind the building per the revised plan that eliminated the sidewalks. 3. The oak trees do not agree with the approved plans at the rear of the building. Check any revisions to this area for conformance. 4. At the rear of the building there was some work being done on the a/c units and a ligustrum shrub was destroyed and needs replacement. Also fix all disturbed areas when work is done and remulch the area. 5. In the front of the building near the left driveway a spray head is very hard to go down and up. Need to replace or clean out. Building 12: 1. Magnolia tree on the left front corner is only 10 feet tall and needs replacement. Building 13: 1. Need to replace the magnolia tree at the end of the cul-de-sac northwest of the building, as it is too small. 2. Touch up mulch in bed area and sod as needed at the west end of the cul-de-sac where the sidewalk was just poured. Compactor Lot: 1. On west end of this lot in the existing irrigation along the sidewalk, need to reinstall properly two irrigation heads, backfill trench, sod and mulch the disturbed juniper bed. 2. Second magnolia to the west of the eastern entrance is too small and must be replaced with a 3-1/2 inch caliper, 12-14 feet tall tree. 3. Magnolia that is just east of the exit driveway is also too small and must be replaced. 4. Magnolia to the west of the exit drive is also too small and must be replaced. 5. Replace the broken end strip irrigation head on the east side of the exit drive that was run over by a vehicle. Fix sod as needed. Building 9: 1. Magnolia tree to the east of the building by the Fire protection line is not the required 3-1/2 inch caliper and 12 foot minimum height. Replace any other magnolia that does not meet this specification. Note, caliper may be approved at 3-1/4 inch, but not an eighth smaller. Building 11: 1. Fix the disturbed mulch area at the rear of the building where a plumber had been digging. STILL OUTSTANDING COMMENTS FOR BUILDINGS 25 AND 24 Building 25: 1. Replace broken concrete water meter box on the west side of parking lot entrance. Building 24 1. Need to re-grade the rear of the building so the water drains positively away from the building. Re-sod any disturbed area. Building perimeter floods when irrigation is on or it rains. | |||
| U - UTILITY COMMERCIAL FINAL | 05/12/2014 | FINAL APPROVED | DSPENCER |
| FIREWALL | 05/09/2014 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| FIRE FINAL | 05/08/2014 | APPROVED | JHINDMAN |
| BUILDING FINAL | 05/08/2014 | APPROVED | JHINDMAN |
| PLUMBING FINAL | 05/08/2014 | APPROVED | JHINDMAN |
| HVAC FINAL | 05/08/2014 | APPROVED | JHINDMAN |
| ELECTRIC FINAL | 05/08/2014 | APPROVED | JHINDMAN |
| BUILDING FINAL | 05/07/2014 | CANCELLED BY APPLICANT | AIRS WEB |
| ELECTRIC - EARLY POWER | 04/15/2014 | APPROVED | RMARVEL |
| LATH/BRICK/WATER BARRIER | 03/21/2014 | APPROVED | RMARVEL |
| GRAVITY SEWER | 03/17/2014 | APPROVED | JHINDMAN |
| U - SEWER TIE IN | 03/17/2014 | APPROVED | DSPENCER |
| INSULATION | 02/24/2014 | APPROVED | DROCKWELL |
| ALL ROUGH | 02/21/2014 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| FIREWALL | 02/21/2014 | PARTIALLY APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 2/21/2014 3:35:02 PM FIRE RETARDANT | |||
| ELECTRIC 1ST ROUGH | 02/20/2014 | APPROVED | JHINDMAN |
| Note: Inspection Resulted at 2/20/2014 3:22:22 PM UNDERGROUND SERVICE CONDUIT | |||
| ALL ROUGH | 02/19/2014 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: Inspection Resulted at 2/19/2014 2:19:46 PM 1. ALL TRADES ARE NOT COMPLETE (FIRE SPRINKLERS). 2. REPAIR TOP PLATES AT A/C LINES BY THE STAIRS. 3. SEAL DRYWALL LID AT AHU AND FRESH AIR PENETRATIONS. 4 SEAL HOLE IN FLOOR UPSTAIRS UNIT IN LAUNDRY. 5. INSTALL NAIL PLATES AT LAUNDRY DRAIN AT FLOOR. 2010 FBC 107.4. | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 02/19/2014 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| FIREWALL | 02/19/2014 | PARTIALLY APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 2/19/2014 2:19:49 PM PENETRATIONS IN ATTIC | |||
| FIREWALL | 01/31/2014 | PARTIALLY APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 1/31/2014 12:54:54 PM TAPE BEHIND CHASEWALLS | |||
| FIREWALL | 01/30/2014 | PARTIALLY APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 1/30/2014 1:32:02 PM TAPING IN ATTIC | |||
| EXTERIOR STRAP/CLIP | 01/27/2014 | APPROVED | DROCKWELL |
| EXTERIOR WALL SHEATHING / SHEARWALL | 01/27/2014 | APPROVED | DROCKWELL |
| ROOF SHEATHING / BRACE / TIE DOWN | 01/27/2014 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Inspection Resulted at 1/27/2014 3:12:34 PM TOP PLATE 2X MISSING MANY NUTS AND WASHERS/GABLE ENDS NNED SOLID BLOCKING FOR SOFFIT RETURN FRAMING/BACK NAILS OUT.INCOMPLETE INSPECTION. | |||
| FIREWALL | 01/13/2014 | PARTIALLY APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 1/13/2014 1:23:32 PM TAPING IN ATTIC | |||
| FIREWALL | 01/10/2014 | PARTIALLY APPROVED | JHINDMAN |
| Note: Inspection Resulted at 1/10/2014 2:24:05 PM TAPING | |||
| MONOLITHIC SLAB | 11/05/2013 | APPROVED | CMINI |
| ELECTRIC 1ST ROUGH | 11/05/2013 | APPROVED | CMINI |
| PLUMBING 1ST ROUGH | 11/01/2013 | APPROVED | RMARVEL |
| PLUMBING 1ST ROUGH | 10/31/2013 | APPROVED | RMARVEL |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 05/06/2014 | 05/07/2014 |
| BLD | COMPLETE | 02/07/2014 | 02/10/2014 |
| ELEC | COMPLETE | 02/07/2014 | 02/10/2014 |
| FI1 | COMPLETE | 02/07/2014 | 02/10/2014 |
| PLUM | COMPLETE | 02/07/2014 | 02/10/2014 |
| Note: Revision - Changed sanitary riser diagram, sheet P3.3b, rev. 5. | |||
| BLD | COMPLETE | 12/31/2013 | 12/31/2013 |
| FI1 | COMPLETE | 12/30/2013 | 12/30/2013 |
| Note: Released By: JHINDMAN | |||
| ELEC | COMPLETE | 12/11/2013 | 12/12/2013 |
| FI1 | HOLD | 12/11/2013 | 12/12/2013 |
| Note: . According to the manufacturers specifications, Flame control No 20-20a (under new surfaces) states that No 20-20a will not give a fire resistive rating on metal surfaces. 2. The primer must also be compatible with the fire retardant. 2010 FBC 709.4.1.1 | |||
| MECH | COMPLETE | 12/11/2013 | 12/13/2013 |
| Note: Revision 4 dated 11-18-13. | |||
| PLUM | COMPLETE | 12/11/2013 | 12/13/2013 |
| Note: Revision 4 dated 11-18-13. | |||
| BLD | COMPLETE | 11/19/2013 | 12/12/2013 |
| BLD | COMPLETE | 11/14/2013 | 11/14/2013 |
| Note: Released By: JMCGOWEN revision, letter from D.P.O.R. on stud spacing | |||
| BLD | HOLD | 11/14/2013 | 11/15/2013 |
| Note: Divide plans into building types that corresponds with the associate permits FBC 107.2.1 | |||
| BLD | HOLD | 11/08/2013 | 11/08/2013 |
| Note: Held By: JHINDMAN 1. Provide a complete structural drawing for the header changes that is suitable for review, construction and inspection. 2010 FBC 107.2.1. | |||
| BLD | HOLD | 11/08/2013 | 11/08/2013 |
| Note: Held By: JHINDMAN 1. Provide a complete structural drawing for the header changes that is suitable for review, construction and inspection. 2010 FBC 107.2.1. | |||
| BLD | HOLD | 11/06/2013 | 11/06/2013 |
| Note: Held By: JHINDMAN 1. Provide clarification for the uplift value and the number of screws and that are required per stud to plate connection. 2010 FBC 107.2.1 | |||
| BLD | COMPLETE | 09/30/2013 | 09/30/2013 |
| BLD | HOLD | 09/23/2013 | 09/24/2013 |
| Note: 1. Provide signed and sealed drawings per 2010 FBC 107.1. | |||
| BLD | COMPLETE | 08/22/2013 | 08/22/2013 |
| FI1 | COMPLETE | 08/22/2013 | 08/22/2013 |
| ZON | COMPLETE | 08/22/2013 | 08/22/2013 |
| FI1 | HOLD | 08/07/2013 | 08/08/2013 |
| Note: 1. The Maltese Cross on page A0.3A does not have a R F designation per F.A.C.69A. | |||
| BLD | HOLD | 08/07/2013 | 08/08/2013 |
| Note: 1. Provide roof and floor truss engineering for review per 2010 FBC 107.3.5. | |||
| ZON | HOLD | 08/07/2013 | 08/08/2013 |
| Note: 1. Although the Area and Height Limitation table on Sheet A1.0 was revised, it appears that the area called out (5,527 square feet) only represents the 1st floor of the building, inclusive of the riser closet and tenant separation space. Please revise the table to reflect the total building area of 10,003 square feet. 2. The revised sheet A6.6 shows that the side elevation dimension is 51 ft-6 in. from the front face of the garages to the outer limit of the column at the rear patio. The color elevations approved with the Development Order show that same dimension at 51 ft-2 in. Please revise the plans so that the dimension matches the approved color elevations incorporated into the Development Order. As an alternative, a modification can be made to the Development Order by submitting a new color elevation with the corrected dimension consistent with the dimension shown on the elevations in the Building Permit set. | |||
| PLLA | COMPLETE | 07/16/2013 | 07/16/2013 |
| Note: Released By: WBUTLER | |||
| ENGIN1 | COMPLETE | 07/08/2013 | 07/08/2013 |
| FI1 | HOLD | 07/08/2013 | 07/08/2013 |
| Note: 1. Provide a Maltese Cross with a RF designation per F.A.C. 69A. 2. Provide seperate permits for the Fire Sprinklers, Fire alarm and Fire underground. | |||
| MECH | COMPLETE | 07/08/2013 | 07/08/2013 |
| PLLA | HOLD | 07/08/2013 | 07/08/2013 |
| Note: Reviewer: Bill Butler, Landscape Architect 7-8-13 1. Need landscape and irrigation plans to be submitted for review and approval. | |||
| PLUM | COMPLETE | 07/08/2013 | 07/08/2013 |
| UD1 | COMPLETE | 07/08/2013 | 07/15/2013 |
| BLD | HOLD | 07/08/2013 | 07/08/2013 |
| Note: 1. Provide floor and roof truss engineering per 2010 FBC 107.3.5. | |||
| ELEC | COMPLETE | 07/08/2013 | 07/08/2013 |
| BLD | HOLD | 05/10/2013 | 05/21/2013 |
| Note: Held By: JMCGOWEN Held By: FREODICA 1. Provide specific plans and details applicable to this permit application per 2010 FBC 107.2.1. | |||
| ZON | HOLD | 05/10/2013 | 07/12/2013 |
| Note: 1. Please revise the Area Calculation tables on sheets A2.6a and A2.6b to show TH-6 area calculations. The current sheets show TH-4 area calculations. 2. Please revise the plans to state that all metal roof fasteners must be color matched to the roof panels. 3. Please revise the plans to provide a screen porch elevation detailing the materials to be used on the screen enclosure, including any kickplates if applicable. 4. Please revise sheet A6.6 to include the length and width dimensions of the buildings, which should match the previously approved elevations in the Development Order approval. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 05/15/2014 |
| REINSPECTION FEE | ¤40.00 | 05/15/2014 |
| REVISION | ¤40.00 | 05/15/2014 |
| REVISION | ¤40.00 | 05/15/2014 |
| REVISION | ¤40.00 | 05/15/2014 |
| REVISION | ¤40.00 | 05/15/2014 |
| REVISION | ¤40.00 | 05/15/2014 |
| REVISION | ¤40.00 | 05/15/2014 |
| REVISION | ¤40.00 | 05/15/2014 |
| REVISION | ¤40.00 | 05/15/2014 |
| REVISION | ¤40.00 | 05/15/2014 |
| REVISION | ¤40.00 | 05/15/2014 |
| REVISION | ¤40.00 | 05/15/2014 |
| REVISION | ¤40.00 | 05/15/2014 |
| REVISION | ¤40.00 | 05/15/2014 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤1,247.94 | 05/15/2014 |
| IMPACT FEE SCHOOL | ¤5,586.00 | 05/15/2014 |
| IMPACT FEE TRANSPORTATION | ¤16,293.60 | 05/15/2014 |
| INSPECTION FEE 20 | ¤20.00 | 05/15/2014 |
| PARKS IMPACT FEE | ¤5,365.44 | 05/15/2014 |
| PLAN CHECK FEE | ¤1,053.40 | 10/11/2013 |
| PLUMBING FEE | ¤609.60 | 10/11/2013 |
| MECHANICAL FEE | ¤609.60 | 10/11/2013 |
| PERMIT FEE | ¤5,038.00 | 10/11/2013 |
| FIRE PLANS REVIEW | ¤99.90 | 10/11/2013 |
| ADMIN COMMERCIAL | ¤60.00 | 10/11/2013 |
| ELECTRIC FEE | ¤609.60 | 10/11/2013 |
| SURCHARGE FS 533.721 | ¤119.70 | 10/11/2013 |
| SURCHARGE - FS 468.631 | ¤119.70 | 10/11/2013 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤37,432.48 |