I want to search for...
Permit #2013050395
Permit Details
Status: FINAL
| Parcel Id: 05-11-31-5918-00000-0230 |
| Block: 00000 |
| Subdivision: 2244 - VILLAGE AT PALM COAST PH 1 |
| Job Phone: 386-445-9055 |
| Location Address: 123 LONGVIEW WAY N |
| Type: PO - POOL |
| Issue Date: 06/18/2013 |
| NOC: RECORDED |
| Applicant name: LUIS JORGE MEDEIROS |
| Owner: MCDONALD, KEITH JAMES & ELIZABETH M |
|
Address PO BOX 228 POETTERSVILLE, NJ 07979 |
| Lot: 0230 |
| Contracted Stated Job Value: ¤32,500.00 |
| Job Description: POOL W/SCREEN ENCLOSURE |
| Type: CN |
Contractor
NEW COASTAL HOMES INC
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
399 SW PALM COAST PKWY PALM COAST, FL 32137 |
UNIT #5 PALM COAST, FL 32137 |
CGC1519145 (Exp: 08/31/2018) | 386-445-9055 | 386-445-9056 |
Sub Contractors
CHRISTOPHER I HALL
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 2413 Bunnell, FL 32110 |
EC13002161 (Exp: 08/31/2028) | (386) 437-2966 | 386-437-5042 |
ROY CHARLES WALDHAUER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1600 N STATE STREET # 102 , 0 |
CRC1327300 (Exp: 08/31/2026) | 386-263-8272 | 386-263-8289 |
ROY C WALDHAUER
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
1600 N STATE STREET BUNNELL, FL 32110 |
#103 BUNNELL, FL 32110 |
CPC1457705 (Exp: 08/31/2026) | 386-446-5524 | 386-446-5107 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 05/12/2014 | FINAL APPROVED | DSPENCER |
| POOL FINAL | 05/09/2014 | FINAL APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION | |||
| POOL FINAL | 05/08/2014 | CANCELLED BY APPLICANT | CMINI |
| Note: THIS IS A REINSPECTION | |||
| POOL FINAL | 11/15/2013 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Inspection Resulted at 11/15/2013 12:59:16 PM TDH CALCULATION SHEET NOT IN BOX-PAPERWORK MISSING.NO VACUME GUAGE AT PUMP. | |||
| ROW DAMAGE | 11/15/2013 | FINAL APPROVED | RGROSS |
| ELECTRIC AND ALARM | 11/14/2013 | APPROVED | DROCKWELL |
| FINAL SURVEY (OFFICE USE ONLY) | 11/14/2013 | APPROVED | JMCGOWEN |
| POOL DECK | 09/20/2013 | APPROVED | DROCKWELL |
| STEEL AND GROUND | 08/28/2013 | APPROVED | RMARVEL |
| RETAINING WALL | 06/28/2013 | APPROVED | DROCKWELL |
| FOOTER | 06/20/2013 | APPROVED | DROCKWELL |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 11/14/2013 | 11/14/2013 |
| Note: Released By: JMCGOWEN final survey | |||
| SW1 | COMPLETE | 11/14/2013 | 11/14/2013 |
| Note: Released By: JMCGOWEN final survey | |||
| BLD | COMPLETE | 06/18/2013 | 06/18/2013 |
| BLD | HOLD | 06/17/2013 | 06/18/2013 |
| Note: Coordinate plan with revision | |||
| PLENV | COMPLETE | 06/13/2013 | 06/13/2013 |
| Note: Released By: DBEVAN | |||
| BLD | HOLD | 06/06/2013 | 06/12/2013 |
| Note: Revised screen enclosure will need to have a raised seal FBC 107.1 | |||
| ZON | COMPLETE | 06/05/2013 | 06/06/2013 |
| PLENV | HOLD | 06/05/2013 | 06/06/2013 |
| Note: Denise Bevan, Senior Environmental Planner 06-06-13 Pursuant to previous comment, a site visit shall be conducted with project representative prior to release of permit to ensure avoidance of existing gopher tortoise burrow. | |||
| PLENV | HOLD | 06/04/2013 | 06/05/2013 |
| Note: Denise Bevan, Senior Environmental Planner 06-05-13 Based on a site inspection conducted on 06-05-13, an active gopher tortoise burrow is approximately located at the northeast property corner. Please coordinate with Denise Bevan to schedule a site inspection to discuss avoidance and potential permitting associated with the burrow. Office: 386-986-2458; email: dbevan@palmcoastgov.com | |||
| ZON | HOLD | 05/30/2013 | 06/04/2013 |
| Note: 1. The site plan shows the deck at 59.40 feet, however, the screen enclosure plan and pool plan show 59.50 feet. The plans must be consistent with each other. Please revise the plans and make dimensions consistent, while maintaining the required 7.5 foot side yard setbacks on each side of the property. | |||
| BLD | COMPLETE | 05/22/2013 | 05/24/2013 |
| ZON | HOLD | 05/22/2013 | 05/29/2013 |
| Note: Revise site and building plans to show structure meets the side setbacks of 7.5. | |||
| BLD | HOLD | 05/14/2013 | 05/14/2013 |
| Note: Provide a pool or plumbing contractor doing the pool plumbing revise TDH friction loss for 2 inch suction pipe to 62 GPM as per table 107.1 107.2.1 | |||
| SW1 | COMPLETE | 05/14/2013 | 05/14/2013 |
| ZON | HOLD | 05/14/2013 | 05/16/2013 |
| Note: Revise site plan to show all the pool dimensions and setbacks. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 05/09/2014 |
| SITE PLAN 20 | ¤20.00 | 06/18/2013 |
| SURCHARGE FS 533.721 | ¤3.30 | 06/18/2013 |
| SURCHARGE - FS 468.631 | ¤3.30 | 06/18/2013 |
| STORM WATER PERMIT FEES | ¤80.00 | 06/18/2013 |
| ADMIN FEE | ¤20.00 | 06/18/2013 |
| PERMIT FEE | ¤160.00 | 06/18/2013 |
| PLAN CHECK FEE | ¤40.00 | 06/18/2013 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤366.60 |