Permit #2013060686

Permit Details

Status: COED

Parcel Id: 07-11-31-7014-00010-0040
CONDITIONED SPACE: 1818 sqft
GARAGE: 574 sqft
SCREEN PORCH (SOLID ROOF) : 358 sqft
PATIO/DECK (NO ROOF) : 48 sqft
Total Square Footage: 2798 sqft
Block: 00010
Subdivision: 2202 - SECTION 14-COUNTRY CLUB COVE
Job Phone: (386)445-9393
Location Address: 8 COLLINGWOOD LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/11/2013
NOC: RECORDED
Applicant name: ANTONIO AMARAL JR
Owner: PINHO, JOAQUIM & MARIA A

Address

88 OLD FARM DR

NEWINGTON, CT 06111

Lot: 0040
Contracted Stated Job Value: ¤200,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

AMARAL CUSTOM HOMES INC.
Status Location Address State License Number Phone Fax
CANCEL

13 Utility Drive

PALM COAST, FL 32135

CBC058062 (Exp: 08/31/2020) (386)445-9393 (386)446-0403

Sub Contractors

RICHARD H SIMMONS JR
Status Location Address State License Number Phone Fax
CANCEL

P. O. Box 1963

Bunnell, FL 32110

ET11000823 (Exp: 09/09/2016) (386) 437-0607 (386)437-1847
PAUL S AIELLO
Status Location Address State License Number Phone Fax
CANCEL

PO BOX 351926

PALM COAST, FL 32137

CAC1815808 (Exp: 08/31/2016) (386)239-0053 (386)323-1955
GLEN WILLIAM KEHLE
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 353511

BUNNELL, FL 32110

CFC057241 (Exp: 08/31/2026) (386) 447-4249 (386) 437-8488
ANTONIO JR AMARAL
Status Location Address State License Number Phone Fax
CANCEL

13 Utility Drive

PALM COAST, FL 32137

CCC058004 (Exp: 08/31/2018) (386)445-9393 (386)446-0403

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 02/13/2014 FINAL APPROVED DSPENCER
Note: PER TONY
BLD - BUILDING FINAL 12/31/2013 FINAL APPROVED CMINI
FINAL APRON (AFTER POUR/DRIVEWAY) 12/18/2013 APPROVED GLALIMA
Note: THIS IS A REINSPECTION
ROW FINAL 12/18/2013 APPROVED GLALIMA
Note: THIS IS A REINSPECTION
FINAL APRON (AFTER POUR/DRIVEWAY) 12/17/2013 Disapproved -FEE REQUIRED GLALIMA
Note: THIS IS A REINSPECTION WE NEED FINAL SURVEY SO WE CAN SEE THE FINAL ELEVATIONS THAT IS ON SURVERY ALONG WITH THE SWALE SHEET.
ROW FINAL 12/17/2013 Disapproved - NO FEE GLALIMA
Note: NEED A FINAL SURVEY AND SWALE SHEET'''' NOT IN PERMIT BOX
ROW DAMAGE 12/17/2013 APPROVED GLALIMA
Note: THIS IS A REINSPECTION
ELECTRIC - EARLY POWER 12/17/2013 APPROVED RMARVEL
Note: per contractor
STORMWATER FINAL 12/17/2013 APPROVED RMARVEL
Note: THIS IS A REINSPECTION
FINAL SURVEY (OFFICE USE ONLY) 11/20/2013 APPROVED JMCGOWEN
PRE-APRON (PRE-POUR/DRIVEWAY) 11/04/2013 APPROVED RGROSS
Note: THIS IS A REINSPECTION. 11/4/13 - READY TO POUR
PRE-APRON (PRE-POUR/DRIVEWAY) 11/01/2013 Disapproved -FEE REQUIRED RGROSS
GRAVITY SEWER TEST 10/29/2013 APPROVED CMINI
U - SEWER TIE IN 10/25/2013 CANCELLED BY INSPECTOR DSPENCER
Note: per contractor Inspection Resulted at 10/25/2013 12:53:02 PM ATTEMPTED GROUND WATER TO MUCH AND LATERAL OVER 7`` NEER POWER POLE
INSULATION 10/15/2013 APPROVED CMINI
ALL ROUGH 10/03/2013 APPROVED CMINI
Note: THIS IS A REINSPECTION requested by contractor
STORMWATER FINAL 09/20/2013 CANCELLED BY APPLICANT DROCKWELL
ROW DAMAGE 09/20/2013 CANCELLED BY APPLICANT RGROSS
Note: Per Contractor - accidently called in this inspection. Driveway not even poured yet.
FINAL APRON (AFTER POUR/DRIVEWAY) 09/20/2013 CANCELLED BY APPLICANT RGROSS
Note: Per Contractor accidently called in wrong inspection. House does not even have driveway poured.
LATH/BRICK/ WATER BARRIER 09/17/2013 APPROVED CMINI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/11/2013 APPROVED RMARVEL
Note: THIS IS A REINSPECTION
ALL ROUGH 09/11/2013 Disapproved -FEE REQUIRED RMARVEL
Note: Inspection Resulted at 9/11/2013 2:01:58 PM REVISE PLANS TO SHOW CHANGES IN ELECTRICAL. ADDED AND DELETED RECEPTACLES/SWITCHES. LOOKS TO BE MISSING WIRE NUTS ON HALL BATH ROOM CONDUCTORS. PLANS ARE CALLING FOR A SINGLE BOX YOU HAVE A TWO GANG. FBC 2010 107.2.1
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/06/2013 Disapproved -FEE REQUIRED RMARVEL
Note: Inspection Resulted at 9/6/2013 3:07:02 PM MULTIPLE PIECES OF LOOSE SHEATHING.(CIRCLED ON PLANS.) ATTACH PER APPROVED PLANS. ALLTHREADED RODS AT BEARING WALLS NEED TO BE TIGHTENED PER APPROVED PLANS. ROD NEEDS TO BE 6FT OR LESS FROM WALL PER APPROVED PLANS (.CHECKED DOWN CELLS AND TRUSS ENGINEERING. OK)
ELECTRIC TEMP POLE 09/03/2013 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 9/3/2013 2:58:16 PM CALLED FPL TO RELEASE POWER AT 10:30 SPOKE WITH SUSAN,,SIMMONS ELEC
TIE BEAM / LINTEL 08/20/2013 APPROVED DROCKWELL
FOUND SURVEY APPROVED (OFFICE) 08/15/2013 APPROVED JMCGOWEN
MONOLITHIC SLAB 08/05/2013 APPROVED CMINI
PLUMBING 1ST ROUGH UNDERGROUND 08/01/2013 APPROVED CMINI

Review History

Department Status Date In Date Out
ZON COMPLETE 11/20/2013 11/20/2013
Note: Released By: JMCGOWEN final survey
SW1 COMPLETE 11/18/2013 11/20/2013
Note: Released By: JMCGOWEN final survey
BLD COMPLETE 10/01/2013 10/02/2013
ELEC COMPLETE 10/01/2013 10/02/2013
ZON COMPLETE 08/15/2013 08/15/2013
Note: Released By: JMCGOWEN foundation survey
SW1 COMPLETE 08/15/2013 08/15/2013
Note: Released By: JMCGOWEN foundation survey
PLUM COMPLETE 07/11/2013 07/11/2013
PLUM HOLD 07/03/2013 07/03/2013
Note: Submitted sanitary riser diagram does not match with floor plan. Master bathroom tub and future summer kitchen are not shown on floor plan but they are shown on riser diagram. Coordinate and resubmit for clarity to comply with 2010 FBC 107.2.1.
MECH COMPLETE 07/03/2013 07/03/2013
ENGIN1 COMPLETE 07/03/2013 07/10/2013
URB COMPLETE 07/03/2013 07/08/2013
ZON COMPLETE 07/03/2013 07/03/2013
BLD COMPLETE 06/26/2013 06/26/2013
ELEC COMPLETE 06/26/2013 06/26/2013
ENGIN1 HOLD 06/26/2013 06/26/2013
Note: An on-site, third order, easily identifiable benchmark referenced to NAVD 1988 (e.g. fire hydrant, nail in power pole.) Pavement nails will not be accepted as benchmarks. (The bench mark must be maintained throughout the construction cycle and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov.
MECH HOLD 06/26/2013 06/26/2013
Note: Provide method of return air from master bathroom to the hvac unit to comply with 2010 FBCR M1602.4.
PLUM HOLD 06/26/2013 06/26/2013
Note: Provide sanitary riser diagram per 2010 FBC 107.2.1.
SW1 COMPLETE 06/26/2013 06/26/2013
UD1 COMPLETE 06/26/2013 06/27/2013
URB HOLD 06/26/2013 06/27/2013
Note: 1: need a total of 5 code trees 30gal. container size 2"@ 6" 7' to 8' in height when planted at least 50% being shade. 2:Need the type of sod being installed. If using a non drought type St. Augustine etc. a permanent irrigation system must be installed with 100% head to head coverage. 3: Need 3 gal. container size shrubbery the full length of foundation on all sides facing right of ways.
ZON HOLD 06/26/2013 06/28/2013
Note: Revise landscape plan to show landscaping along the entire rear of property. Revise landscape plan to show sod type.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 02/13/2014
REINSPECTION FEE ¤40.00 02/13/2014
REINSPECTION FEE ¤40.00 02/13/2014
REINSPECTION FEE ¤40.00 02/13/2014
REVISION ¤40.00 02/13/2014
SITE PLAN 20 ¤20.00 07/11/2013
SURCHARGE FS 533.721 ¤17.62 07/11/2013
SURCHARGE - FS 468.631 ¤17.62 07/11/2013
STORM WATER PERMIT FEES ¤80.00 07/11/2013
3% TRANS IMPACT FEE CREDIT (¤90.51) 07/11/2013
NEW RESIDENTIAL INSPECTIONS ¤464.00 07/11/2013
ADMIN FEE ¤20.00 07/11/2013
ELECTRIC FEE ¤199.20 07/11/2013
3% FIRE IMPACT FEE CREDIT (¤6.24) 07/11/2013
IMPACT FEE FIRE NONRESIDENTIAL ¤207.99 07/11/2013
IMPACT FEE PARKS ¤1,343.98 07/11/2013
IMPACT FEE SCHOOL ¤3,600.00 07/11/2013
IMPACT FEE TRANSPORTATION ¤3,017.05 07/11/2013
MECHANICAL FEE ¤199.20 07/11/2013
3% PARKS IMPACT FEE CREDIT (¤40.32) 07/11/2013
PLAN CHECK FEE ¤92.80 07/11/2013
PLUMBING FEE ¤199.20 07/11/2013
Fees Total Due: ¤0.00 Total Paid: ¤9,541.59