I want to search for...
Permit #2013070526
Permit Details
Status: COED
| Parcel Id: 07-11-31-7003-00170-0070 |
| CONDITIONED SPACE: 423 sqft |
| SCREEN PORCH (SOLID ROOF) : 252 sqft |
| PATIO/DECK (NO ROOF) : 23 sqft |
| Total Square Footage: 698 sqft |
| Block: 00170 |
| Subdivision: 2190 - SECTION 3-COUNTRY CLUB COVE |
| Job Phone: 386-672-6101 |
| Location Address: 8 CARDWELL CT |
| Type: BA - BUILDING ADDITION |
| Issue Date: 08/28/2013 |
| NOC: RECORDED |
| Applicant name: JOHN DAVID MINABERRY |
| Owner: EJNES, WALTER A & BARBARA J |
|
Address 76 BEACHWAY DR PALM COAST, FL 32137 |
| Lot: 0070 |
| Contracted Stated Job Value: ¤224,000.00 |
| Job Description: COMPLETE REMODEL & ADDITION |
| Type: CN |
Contractor
KEYSTONE HOMES
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1339 W GRANADA BLVD ORMOND, FL 32174 |
CRC1329222 (Exp: 08/31/2026) | 386-672-6101 | 386-672-6102 |
Sub Contractors
PETER JOSEPH LYDEN
| Status | Location Address | State License Number | Phone |
| CANCEL |
17 UNIMAY CT BUNNELL, FL 32110 |
EC0002436 (Exp: 08/31/2022) | 386-931-2568 |
PAUL S AIELLO
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
PO BOX 351926 PALM COAST, FL 32137 |
CAC1815808 (Exp: 08/31/2016) | (386)239-0053 | (386)323-1955 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
PATTI MULLIGAN
| Status | Location Address | State License Number | Phone |
| CANCEL |
2680 S US HIGHWAY 17 CRESCENT CITY, FL 32112 |
04529 (Exp: 08/31/2015) | 386-328-3417 |
STEPHEN M RENDE
| Status | Location Address | State License Number | Phone |
| CANCEL |
22 ALAMANDA DRIVE ORMOND, FL 32176 |
CCC058058 (Exp: 08/31/2020) | 386-439-7156 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 04/16/2014 | FINAL APPROVED | DSPENCER |
| BLD - BUILDING FINAL | 04/15/2014 | FINAL APPROVED | CMINI |
| FINAL SURVEY (OFFICE USE ONLY) | 04/08/2014 | APPROVED | JMCGOWEN |
| PRE-APRON (PRE-POUR/DRIVEWAY) | 02/14/2014 | APPROVED | GLALIMA |
| LATH/BRICK/ WATER BARRIER | 01/02/2014 | APPROVED | CMINI |
| INSULATION | 12/20/2013 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| INSULATION | 12/19/2013 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Inspection Resulted at 12/19/2013 2:59:30 PM RELOCATE ATTIC ACCESS AND LIGHT AS SO 30INCHES OF HEAD ROOM IS ACHIEVED PER FBC /INSTALL DEPTH MARKERS IN CEILING PER FBC-ENERGY303.1.1.1/NEED BAFFEL AROUND ATTIC ACCESS DOOR TO PREVENT LOOSE FILL FROM FALLING INTO LIVING AREA PER FBC-ENERGY 402.2.3 | |||
| ALL ROUGH | 12/16/2013 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 12/13/2013 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: THIS IS A REINSPECTION Inspection Resulted at 12/13/2013 3:23:12 PM FIREBLOCK AREAS LEADING INTO EXISTING ATTIC/NEED 5FT HEAD REST ON SANITARY PER FBC 312.5/ NAI PLATE AT LOW-VOLT BUNDLE TOP PLATE PER NEC/ STRAP WIRING WIYHIN 12IN OF PANEL PER NEC/ATTACH WINDOWS PER MANUFA SPECS. | |||
| ALL ROUGH | 12/11/2013 | CANCELLED BY APPLICANT | DROCKWELL |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/31/2013 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/30/2013 | CANCELLED BY APPLICANT | RMARVEL |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/29/2013 | Disapproved -FEE REQUIRED | CMINI |
| Note: THIS IS A REINSPECTION per contractor Inspection Resulted at 10/29/2013 3:25:12 PM NEED REPAIR REVISION FOR TRUSSES 03 AND 04...LOOSE SHEET AT KITCHEN NOOK AND TAPCONS IN FRAMING OF OPENINGS NEED TO BE 12"O.C | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/21/2013 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: Inspection Resulted at 10/21/2013 3:10:44 PM NEED TO FINISH PAERING ROOF ALONG WITH VALLEYS AND DRIP EDGE. NOT READY. | |||
| TIE BEAM / LINTEL | 10/04/2013 | APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION | |||
| TIE BEAM / LINTEL | 10/03/2013 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: Inspection Resulted at 10/3/2013 3:43:44 PM REBAR NEEDS TO BE MADE CONTINUOUS FROM TOP TO BOTTOM. INSTALL 25IN OVERLAP OF REBAR TO EXISTING HOLLOW WALL EPOXIED 4IN PER APPROVED PLPANS. | |||
| FOUND SURVEY APPROVED (OFFICE) | 10/02/2013 | APPROVED | FREODICA |
| MONOLITHIC SLAB | 09/20/2013 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB | 09/19/2013 | CANCELLED BY APPLICANT | CMINI |
| PLUMBING 1ST ROUGH UNDERGROUND | 09/18/2013 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 09/17/2013 | CANCELLED BY APPLICANT | CMINI |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 04/08/2014 | 04/08/2014 |
| Note: Released By: JMCGOWEN final survey | |||
| ELEC | COMPLETE | 12/06/2013 | 12/06/2013 |
| ELEC | HOLD | 11/25/2013 | 11/26/2013 |
| Note: Provide a more comprehensive 200 amp service riser detail, your proposed looks like your trying to feed two 200 amp panels with one 200 amp meter and service conductors | |||
| MECH | COMPLETE | 11/25/2013 | 11/27/2013 |
| Note: Revisiion- changed duct layout. | |||
| BLD | COMPLETE | 10/30/2013 | 10/30/2013 |
| ZON | COMPLETE | 10/02/2013 | 10/02/2013 |
| Note: Released By: FREODICA foundation survey | |||
| SW1 | COMPLETE | 10/02/2013 | 10/02/2013 |
| Note: Released By: FREODICA foundation survey | |||
| PLUM | COMPLETE | 08/15/2013 | 08/16/2013 |
| BLD | COMPLETE | 08/08/2013 | 08/08/2013 |
| PLUM | HOLD | 08/08/2013 | 08/08/2013 |
| Note: Submitted sanitary riser diagram does not match with new floor plan. Coordinate and resubmit correction per 2010 FBC 107.2.1. | |||
| ELEC | COMPLETE | 08/08/2013 | 08/08/2013 |
| ZON | COMPLETE | 08/08/2013 | 08/09/2013 |
| BLD | HOLD | 07/23/2013 | 07/24/2013 |
| Note: 1. Provide detail for the spacing and placement of the rebar in the cmu wall built on top of the existing wall. 2010 FBC 107.2.1. | |||
| ELEC | HOLD | 07/23/2013 | 07/24/2013 |
| Note: Provide electric load calculations and service riser detail FBC 107.2.1, NEC 220 | |||
| MECH | COMPLETE | 07/23/2013 | 07/24/2013 |
| PLUM | HOLD | 07/23/2013 | 07/24/2013 |
| Note: Provide sanitary riser diagram either signed and sealed by design professional or have license number and signature of plumbing contractor per 2010 FBC 107.3.4.3. | |||
| SW1 | COMPLETE | 07/23/2013 | 07/24/2013 |
| UD1 | COMPLETE | 07/23/2013 | 07/29/2013 |
| Note: see comment in general notes Keith King 386-9318009 | |||
| ZON | HOLD | 07/23/2013 | 07/24/2013 |
| Note: Revise color and material sheet to show that walls and garage meets the Light reflective value of 80 or greater for pastels. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 04/15/2014 |
| CONTRACTOR CHANGE | ¤40.00 | 04/15/2014 |
| REINSPECTION FEE | ¤40.00 | 04/15/2014 |
| REINSPECTION FEE | ¤40.00 | 04/15/2014 |
| REINSPECTION FEE | ¤40.00 | 04/15/2014 |
| REINSPECTION FEE | ¤40.00 | 04/15/2014 |
| REINSPECTION FEE | ¤40.00 | 04/15/2014 |
| REVISION | ¤40.00 | 04/15/2014 |
| REVISION | ¤40.00 | 04/15/2014 |
| REVISION | ¤40.00 | 04/15/2014 |
| REVISION | ¤40.00 | 04/15/2014 |
| SITE PLAN 20 | ¤20.00 | 08/28/2013 |
| SURCHARGE FS 533.721 | ¤11.74 | 08/28/2013 |
| SURCHARGE - FS 468.631 | ¤11.74 | 08/28/2013 |
| STORM WATER PERMIT FEES | ¤80.00 | 08/28/2013 |
| REMODEL/ADDITION/ACCES INSPECT | ¤89.60 | 08/28/2013 |
| ELECTRIC FEE | ¤194.40 | 08/28/2013 |
| MECHANICAL FEE | ¤194.40 | 08/28/2013 |
| PLAN CHECK FEE | ¤89.60 | 08/28/2013 |
| PLUMBING FEE | ¤194.40 | 08/28/2013 |
| ADMIN FEE | ¤20.00 | 08/28/2013 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤1,345.88 |