Permit #2013080163

Permit Details

Status: COED

Parcel Id: 08-12-31-5385-00000-0010
CONDITIONED SPACE: 7664 sqft
GARAGE: 2068 sqft
OPENED PORCH (WITH ROOF) : 1988 sqft
Total Square Footage: 11720 sqft
Block: 00000
Subdivision: 2117 - Town Center Phase III, BROOKHAVEN
Job Phone: 407-741-8500
Location Address: 111 BROOKHAVEN CT S
Type: BM - BUILDING MULTI - APARTMENT
Issue Date: 10/11/2013
NOC: RECORDED
Applicant name: SCOTT W CULP
Owner: BROOKHAVEN HOLDINGS LLC

Address

200 E CANTON AVE # 102

WINTER PARK, FL 32879

Lot: 0010
Contracted Stated Job Value: ¤321,800.00
Job Description: FORMER BUILDING# 30 - 4 UNIT APARTMENT (ORIGINAL PERMIT # 2007060082)
Type: CN

Contractor

CPG CONSTRUCTION LLP
Status Location Address State License Number Phone Fax
CANCEL

200 E CANTON AVE # 102

WINTER PARK, FL 32789

CGC1512998 (Exp: 08/31/2016) 407-741-8500 407-643-2551

Inspection History

Type Request Date Result Inspector
BUILDING FINAL 04/23/2014 FINAL APPROVED JHINDMAN
Note: THIS IS A REINSPECTION
LDSC- LANDSCAPE FINAL 04/22/2014 APPROVED - AS NOTED WBUTLER
Note: Building 107: 1. Add Bahia sod to the rear property line where bare soil exists on the steep slope. Modify irrigation nozzles to temporarily run full circle on top of the bank to establish the sod. 2. Splash blocks still needed where downspouts can empty on paved surfaces and tile out others to the sod. 3. Need to add flush plugs in 6 inch valve boxes for drip irrigation zone areas. 4. Irrigation spray heads not installed on the south side of the building to water the grass. 5. Landscape and irrigation as-builts will be required for all units prior to the final inspection approval of the last building. Building 111: 1. Splash blocks still needed where downspouts can empty on paved surfaces and tile out others to the sod. 2. South side of building still not completely sodded. 3. Move a rotor head out of the shrubbery bed on the south side of the building. 4. Spray heads not installed on the north side of the building to water the grass. 5. Need to add flush plugs in 6 inch valve boxes for drip irrigation zone areas. 6. Landscape and irrigation as-builts will be required for all units prior to the final inspection approval of the last building. NOTE: THESE ITEMS WERE OUTSTANDING FROM THE LAST INSPECTION OF BUILDINGS 6, 7 AND 8. NEED TO REINSPECT AT THE NEXT BUILDING GROUP STAGE INSPECTION. 1. All splash blocks that empty directly into planting beds need to be removed and downspout extensions are to be installed to reach the edge of the lawn. Some areas may require the shifting of the foundation plants to provide a straight shot from the building to the grass. 2. Need to add flush plugs in 6 inch valve boxes for drip irrigation zone areas. STILL OUTSTANDING COMMENTS FOR BUILDINGS 26 and 27: 1. The parking lot was modified to use environmental curbing instead of 6 inch highback curb. Additionally add two parking stops on each side of the parking lot along the northern edge of the two northernmost parking spaces that are adjacent to the landscape islands to prevent cars from entering the islands. 2. Add Bahia sod along the north side of the crown grass planting adjacent to the wetland buffer anywhere there is bare soil. 3. Any downspouts that dump water into the planting beds need to have the splash blocks removed and downspout extensions added to carry water directly to the turf areas. Shrubs may need to be shifted as some are right in front of the downspout discharge. 4. Need to install flush plugs on all drip irrigation areas. Plugs should be in a 6 inch diameter valve boxes. 5. These punchlist items will be reinspected at the time of the next inspection. All of the comments from all previous inspections MUST be all completed by that time; otherwise no further landscape inspections will be approved. 6. Landscape and irrigation as-builts will be required for all units prior to the final inspection approval of the last building.
U - UTILITY COMMERCIAL FINAL 04/22/2014 FINAL APPROVED DSPENCER
HVAC FINAL 04/22/2014 APPROVED JHINDMAN
Note: THIS IS A REINSPECTION
ELECTRIC FINAL 04/21/2014 APPROVED JHINDMAN
PLUMBING FINAL 04/21/2014 APPROVED JHINDMAN
HVAC FINAL 04/21/2014 Disapproved -FEE REQUIRED JHINDMAN
Note: Inspection Resulted at 4/21/2014 3:55:43 PM 1. FRESH AIR INTAKES ARE NOT COMPLETE 2010 FBC 110.5.
U - UTILITY COMMERCIAL FINAL 04/21/2014 FINAL APPROVED DSPENCER
FIRE FINAL 04/21/2014 APPROVED JHINDMAN
BUILDING FINAL 04/21/2014 Disapproved -FEE REQUIRED JHINDMAN
Note: Inspection Resulted at 4/21/2014 3:55:44 PM 1. GARAGE DOORS ARE NOT INSTALLED 2010 FBC 110.5.
ELECTRIC - EARLY POWER 04/11/2014 APPROVED RMARVEL
Note: Inspection Resulted at 4/11/2014 2:36:48 PM CALLED FPL AT 1:17
LATH/BRICK/WATER BARRIER 03/19/2014 APPROVED RMARVEL
ELECTRIC TEMP POLE 03/13/2014 APPROVED RMARVEL
FIREWALL 03/04/2014 APPROVED JHINDMAN
Note: THIS IS A REINSPECTION
INSULATION 02/26/2014 APPROVED JHINDMAN
ALL ROUGH 02/21/2014 APPROVED JHINDMAN
Note: THIS IS A REINSPECTION
ALL ROUGH 02/18/2014 CANCELLED BY APPLICANT JHINDMAN
Note: THIS IS A REINSPECTION
FIREWALL 02/18/2014 PARTIALLY APPROVED JHINDMAN
Note: THIS IS A REINSPECTION Inspection Resulted at 2/18/2014 2:36:21 PM FIRE RETARDANT SPRAY
ALL ROUGH 02/17/2014 CANCELLED BY APPLICANT JHINDMAN
FIREWALL 02/10/2014 Disapproved -FEE REQUIRED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 2/10/2014 3:28:57 PM TRUSS TO ROOF MISSING TAPE AND JOINT COMPOUND AT GARAGE AREA AND NEED TO REMOVE PLASTIC..SCREWS MISSING COMPOUND..SEAL ANY OTHER OPENINGS
MONOLITHIC SLAB 02/05/2014 APPROVED JHINDMAN
FIREWALL 02/04/2014 PARTIALLY APPROVED JHINDMAN
Note: THIS IS A REINSPECTION Inspection Resulted at 2/4/2014 12:15:41 PM CHASEWALL SCREWS
PLUMBING 1ST ROUGH 02/03/2014 APPROVED RMARVEL
Note: THIS IS A REINSPECTION
ROOF SHEATHING / BRACE / TIE DOWN 02/03/2014 APPROVED DROCKWELL
Note: THIS IS A REINSPECTION
ROOF SHEATHING / BRACE / TIE DOWN 01/31/2014 CANCELLED BY APPLICANT DROCKWELL
Note: THIS IS A REINSPECTION
PLUMBING 1ST ROUGH 01/31/2014 Disapproved -FEE REQUIRED JHINDMAN
Note: Inspection Resulted at 1/31/2014 12:54:56 PM NOT READY
ROOF SHEATHING / BRACE / TIE DOWN 01/30/2014 Disapproved -FEE REQUIRED DROCKWELL
Note: Inspection Resulted at 1/30/2014 3:31:59 PM BLOCK FLAT TOP HIP TRUSSES-OSB CANNOT EXCEED 24IN O/C/LETTER OF REPAIR FOR BLOCK BLOW-OUT AT TAP CON INSTALL/CLIP GIRDE TRUSS PER PLAN.OK TO INSULATE AND PRE-ROCK PARTY WALL IF NO EMP``S TO BE INSPECTED
FIREWALL 01/29/2014 PARTIALLY APPROVED JHINDMAN
Note: THIS IS A REINSPECTION Inspection Resulted at 1/29/2014 2:35:16 PM ATTIC SCREWS
FIREWALL 01/21/2014 CANCELLED BY APPLICANT JHINDMAN

Review History

Department Status Date In Date Out
BLD COMPLETE 04/09/2014 04/09/2014
MECH COMPLETE 02/10/2014 02/11/2014
Note: Revision 2, sheets M2.1 and M3.1.
BLD COMPLETE 02/07/2014 02/07/2014
ELEC COMPLETE 02/07/2014 02/10/2014
Note: NA
PLUM COMPLETE 02/07/2014 02/07/2014
Note: revision 2
BLD COMPLETE 01/31/2014 01/31/2014
Note: Released By: JMCGOWEN building revision
BLD COMPLETE 11/26/2013 11/27/2013
Note: Revision - revised set of drawings from old permit 2007060082.
PLUM COMPLETE 11/26/2013 11/26/2013
Note: Revision - changed sanitary riser and added domestic water riser diagram.
ELEC COMPLETE 11/26/2013 11/26/2013
BLD HOLD 11/19/2013 11/20/2013
Note: Provide Florida product approval and installation sheets for windows, doors and cladding FBC 107.2.1
BLD HOLD 11/14/2013 11/18/2013
Note: Provide a signed and sealed letter of evaluation and acceptance of existing structure FBC 107.1
ELEC HOLD 11/08/2013 11/13/2013
Note: Revise receptacle locations to meet NEC 210.52
MECH COMPLETE 11/08/2013 11/13/2013
PLUM HOLD 11/08/2013 11/13/2013
Note: 1. Plan shows two (2) lavatories in bath number 2 but piping layout and sanitary riser diagram show only one (1) lavatory. Coordinate and revise for clarity per 2010 FBC 107.2.1. 2. Provide domestic water riser diagram per 2010 FBC 107.3.5. 3. Update the plumbing reference code on sheet P7.1 from 2004 to 2010 per 2010 FBC 107.2.1.
BLD HOLD 11/06/2013 11/06/2013
Note: Held By: JHINDMAN 1. Provide clarification for the uplift value and the number of screws and that are required per stud to plate connection. 2010 FBC 107.2.1
BLD COMPLETE 09/30/2013 09/30/2013
BLD HOLD 09/23/2013 09/24/2013
Note: 1. Provide signed and sealed drawings per 2010 FBC 107.1.
BLD COMPLETE 09/05/2013 09/05/2013
BLD HOLD 08/23/2013 08/26/2013
Note: 1. revise letter to state that the existing construction complies with the 2004 Florida Building Code.
BLD HOLD 08/07/2013 08/07/2013
Note: Provide an engineer’s evaluation of existing structure FBC 107.2.1
ZON COMPLETE 08/07/2013 08/07/2013

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
IMPACT FEE FIRE NONRESIDENTIAL ¤831.96 04/23/2014
IMPACT FEE PARKS ¤5,375.92 04/23/2014
IMPACT FEE SCHOOL ¤3,724.00 04/23/2014
IMPACT FEE TRANSPORTATION ¤10,862.40 04/23/2014
REINSPECTION FEE ¤40.00 04/23/2014
REINSPECTION FEE ¤40.00 04/23/2014
REINSPECTION FEE ¤40.00 04/23/2014
REINSPECTION FEE ¤40.00 04/23/2014
REINSPECTION FEE ¤40.00 04/23/2014
REVISION ¤40.00 04/23/2014
REVISION ¤40.00 04/23/2014
REVISION ¤40.00 04/23/2014
REVISION ¤40.00 04/23/2014
REVISION ¤40.00 04/23/2014
REVISION ¤40.00 04/23/2014
REVISION ¤40.00 04/23/2014
REVISION ¤40.00 04/23/2014
REVISION ¤40.00 04/23/2014
REVISION ¤40.00 04/23/2014
REVISION ¤40.00 04/23/2014
SURCHARGE FS 533.721 ¤127.05 10/11/2013
SURCHARGE - FS 468.631 ¤127.05 10/11/2013
ADMIN COMMERCIAL ¤60.00 10/11/2013
ELECTRIC FEE ¤644.40 10/11/2013
REVISION ¤40.00 10/11/2013
MECHANICAL FEE ¤644.40 10/11/2013
PERMIT FEE ¤5,357.00 10/11/2013
PLAN CHECK FEE ¤1,120.10 10/11/2013
PLUMBING FEE ¤644.40 10/11/2013
FIRE PLANS REVIEW ¤117.20 10/11/2013
Fees Total Due: ¤0.00 Total Paid: ¤30,315.88