Permit #2013080165
Permit Details
Status: COED
| Parcel Id: 08-12-31-5385-00000-0010 |
| CONDITIONED SPACE: 7665 sqft |
| GARAGE: 2068 sqft |
| OPENED PORCH (WITH ROOF) : 1988 sqft |
| Total Square Footage: 11721 sqft |
| Block: 00000 |
| Subdivision: 2117 - Town Center Phase III, BROOKHAVEN |
| Job Phone: 407-741-8500 |
| Location Address: 141 BROOKHAVEN CT S |
| Type: BM - BUILDING MULTI - APARTMENT |
| Issue Date: 09/13/2013 |
| NOC: RECORDED |
| Applicant name: SCOTT W CULP |
| Owner: BROOKHAVEN DEVELOPMENT LAND LTD |
|
Address 200 E CANTON AVE # 102 WINTER PARK, FL 32789 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤321,800.00 |
| Job Description: FORMER BUILDING # 28 - 4 UNIT APARTMENT (ORIGINAL PERMIT # 2007060070) |
| Type: CN |
Contractor
CPG CONSTRUCTION LLP
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
200 E CANTON AVE # 102 WINTER PARK, FL 32789 |
CGC1512998 (Exp: 08/31/2016) | 407-741-8500 | 407-643-2551 |
Inspection History
| Type | Request Date | Result | Inspector |
| BUILDING FINAL | 04/23/2014 | FINAL APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| LDSC- LANDSCAPE FINAL | 04/22/2014 | APPROVED - AS NOTED | WBUTLER |
| Note: Building 107: 1. Add Bahia sod to the rear property line where bare soil exists on the steep slope. Modify irrigation nozzles to temporarily run full circle on top of the bank to establish the sod. 2. Splash blocks still needed where downspouts can empty on paved surfaces and tile out others to the sod. 3. Need to add flush plugs in 6 inch valve boxes for drip irrigation zone areas. 4. Irrigation spray heads not installed on the south side of the building to water the grass. 5. Landscape and irrigation as-builts will be required for all units prior to the final inspection approval of the last building. Building 111: 1. Splash blocks still needed where downspouts can empty on paved surfaces and tile out others to the sod. 2. South side of building still not completely sodded. 3. Move a rotor head out of the shrubbery bed on the south side of the building. 4. Spray heads not installed on the north side of the building to water the grass. 5. Need to add flush plugs in 6 inch valve boxes for drip irrigation zone areas. 6. Landscape and irrigation as-builts will be required for all units prior to the final inspection approval of the last building. NOTE: THESE ITEMS WERE OUTSTANDING FROM THE LAST INSPECTION OF BUILDINGS 6, 7 AND 8. NEED TO REINSPECT AT THE NEXT BUILDING GROUP STAGE INSPECTION. 1. All splash blocks that empty directly into planting beds need to be removed and downspout extensions are to be installed to reach the edge of the lawn. Some areas may require the shifting of the foundation plants to provide a straight shot from the building to the grass. 2. Need to add flush plugs in 6 inch valve boxes for drip irrigation zone areas. STILL OUTSTANDING COMMENTS FOR BUILDINGS 26 and 27: 1. The parking lot was modified to use environmental curbing instead of 6 inch highback curb. Additionally add two parking stops on each side of the parking lot along the northern edge of the two northernmost parking spaces that are adjacent to the landscape islands to prevent cars from entering the islands. 2. Add Bahia sod along the north side of the crown grass planting adjacent to the wetland buffer anywhere there is bare soil. 3. Any downspouts that dump water into the planting beds need to have the splash blocks removed and downspout extensions added to carry water directly to the turf areas. Shrubs may need to be shifted as some are right in front of the downspout discharge. 4. Need to install flush plugs on all drip irrigation areas. Plugs should be in a 6 inch diameter valve boxes. 5. These punchlist items will be reinspected at the time of the next inspection. All of the comments from all previous inspections MUST be all completed by that time; otherwise no further landscape inspections will be approved. 6. Landscape and irrigation as-builts will be required for all units prior to the final inspection approval of the last building. | |||
| HVAC FINAL | 04/22/2014 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| U - UTILITY COMMERCIAL FINAL | 04/22/2014 | FINAL APPROVED | DSPENCER |
| PLUMBING FINAL | 04/21/2014 | APPROVED | JHINDMAN |
| HVAC FINAL | 04/21/2014 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: Inspection Resulted at 4/21/2014 3:55:44 PM 1. FRESH AIR INTAKES ARE NOT COMPLETE. 2010 FBC 110.5. | |||
| ELECTRIC FINAL | 04/21/2014 | APPROVED | JHINDMAN |
| U - UTILITY COMMERCIAL FINAL | 04/21/2014 | FINAL APPROVED | DSPENCER |
| FIRE FINAL | 04/21/2014 | APPROVED | JHINDMAN |
| BUILDING FINAL | 04/21/2014 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: Inspection Resulted at 4/21/2014 3:55:45 PM 1. GARAGE DOORS ARE NOT INSTALLED 2010 FBC 110.5. | |||
| ELECTRIC - EARLY POWER | 04/11/2014 | APPROVED | RMARVEL |
| Note: Inspection Resulted at 4/11/2014 2:36:48 PM CALLED FPL AT 1:17 | |||
| LATH/BRICK/WATER BARRIER | 03/19/2014 | APPROVED | RMARVEL |
| FIREWALL | 02/28/2014 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| INSULATION | 02/26/2014 | APPROVED | JHINDMAN |
| FIREWALL | 02/20/2014 | PARTIALLY APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 2/20/2014 3:22:22 PM PENETRATIONS | |||
| ALL ROUGH | 02/20/2014 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 02/19/2014 | CANCELLED BY APPLICANT | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| FIREWALL | 02/19/2014 | CANCELLED BY APPLICANT | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 02/17/2014 | CANCELLED BY APPLICANT | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 02/14/2014 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: Inspection Resulted at 2/14/2014 3:46:36 PM ADD RECEPTACLES WHERE REQUIRED BHY THE 2008 NEC 210.52. RECHECK NAIL PLATES. PROVIDE 5FT OF HEAD PRESSURE ON DWV. STRAP DRYER VENT EVERY 4FT. REPLACE DAMAGED OUTLET BOX IN GARAGE. CLOSE ALL UNUSED OPENINGS IN BOXES. MISSING FRAMING MEMBER IN BEDROOM WALL. SEAL ALL PENTRATIONS THROUGH SLAB INTO EARTH. PROVIDE 12IN CLEARANCE FOR BLOWN INSULATION. UNKINK MECHANICAL DUCTS IN ATTIC.FINISH REMOVING PLASTIC ON FIRE WALL AT GARAGE. | |||
| PLUMBING 1ST ROUGH | 01/31/2014 | APPROVED | JHINDMAN |
| Note: Inspection Resulted at 1/31/2014 12:54:56 PM WILL CHECK PRESSURE TEST AT ALL ROUGH | |||
| FIREWALL | 01/31/2014 | PARTIALLY APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 1/31/2014 12:54:56 PM TAPE BEHIND CHASEWALLS | |||
| FIREWALL | 01/30/2014 | PARTIALLY APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 1/30/2014 1:32:03 PM SCREWS BEHIND CHASEWALLS | |||
| EXTERIOR STRAP/CLIP | 01/28/2014 | APPROVED | DROCKWELL |
| ROOF SHEATHING / BRACE / TIE DOWN | 01/28/2014 | APPROVED | DROCKWELL |
| EXTERIOR WALL SHEATHING / SHEARWALL | 01/28/2014 | APPROVED | DROCKWELL |
| ROOF SHEATHING / BRACE / TIE DOWN | 01/27/2014 | APPROVED | DROCKWELL |
| EXTERIOR WALL SHEATHING / SHEARWALL | 01/27/2014 | APPROVED | DROCKWELL |
| EXTERIOR STRAP/CLIP | 01/27/2014 | APPROVED | DROCKWELL |
| FIREWALL | 01/21/2014 | PARTIALLY APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 1/21/2014 12:44:34 PM TAPING IN ATTIC | |||
| FIREWALL | 01/15/2014 | PARTIALLY APPROVED | JHINDMAN |
| Note: Inspection Resulted at 1/15/2014 12:41:32 PM SCREWS IN ATTIC | |||
| ELECTRIC TEMP POLE | 11/21/2013 | APPROVED | CMINI |
| Note: Inspection Resulted at 11/21/2013 2:47:02 PM CALLED FPL TO RELEASE POWER AT 2:00 SPOKE WITH KAREN | |||
| LINTEL | 10/02/2013 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| LINTEL | 09/26/2013 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Inspection Resulted at 9/26/2013 2:44:52 PM NOT READY FOR INSPECTION LINTEL STEEL NOT COMPLETED |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 04/09/2014 | 04/09/2014 |
| MECH | COMPLETE | 02/10/2014 | 02/10/2014 |
| Note: Revision 2, sheets M2.1 and M3.1. | |||
| BLD | COMPLETE | 02/07/2014 | 02/07/2014 |
| ELEC | COMPLETE | 02/07/2014 | 02/10/2014 |
| Note: NA | |||
| PLUM | COMPLETE | 02/07/2014 | 02/07/2014 |
| Note: Revision 2 | |||
| BLD | COMPLETE | 01/31/2014 | 01/31/2014 |
| Note: Released By: JMCGOWEN revision | |||
| BLD | COMPLETE | 11/26/2013 | 11/27/2013 |
| Note: Revised plans from old permit 2007060070 | |||
| PLUM | COMPLETE | 11/26/2013 | 11/27/2013 |
| Note: Revised plans | |||
| ELEC | COMPLETE | 11/26/2013 | 11/26/2013 |
| BLD | HOLD | 11/19/2013 | 11/20/2013 |
| Note: Provide Florida product approval and installation sheets for windows, doors and cladding FBC 107.2.1 | |||
| BLD | HOLD | 11/14/2013 | 11/18/2013 |
| Note: Provide a signed and sealed letter of evaluation and acceptance of existing structure FBC 107.1 | |||
| ELEC | HOLD | 11/08/2013 | 11/13/2013 |
| Note: Revise receptacle locations to meet NEC 210.52 | |||
| MECH | COMPLETE | 11/08/2013 | 11/13/2013 |
| PLUM | HOLD | 11/08/2013 | 11/13/2013 |
| Note: 1. Plan shows two (2) lavatories in bathroom but piping layout and sanitary riser diagram show only one (1). Coordinate and revise for clarity per 2010 FBC 107.2.1. 2. Provide domestic water riser diagram per 2010 FBC 107.3.5. 3. Update the plumbing reference code on sheet P7.1 from 2004 to 2010 per 2010 FBC 107.2.1. | |||
| BLD | HOLD | 11/06/2013 | 11/06/2013 |
| Note: Held By: JHINDMAN 1. Provide clarification for the uplift value and the number of screws and that are required per stud to plate connection. 2010 FBC 107.2.1 | |||
| BLD | COMPLETE | 09/30/2013 | 09/30/2013 |
| BLD | HOLD | 09/23/2013 | 09/24/2013 |
| Note: 1. Provide signed and sealed drawings per 2010 FBC 107.1. | |||
| BLD | COMPLETE | 09/05/2013 | 09/05/2013 |
| BLD | HOLD | 08/23/2013 | 08/26/2013 |
| Note: 1. Revise letter to state that the existing construction complies with the 2004 Florida Building Code. | |||
| BLD | HOLD | 08/07/2013 | 08/07/2013 |
| Note: 1. Provide engineers evaluation of the existing structure per 2010 FBC 107.2.1.. | |||
| ZON | COMPLETE | 08/07/2013 | 08/07/2013 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤831.96 | 04/23/2014 |
| IMPACT FEE TRANSPORTATION | ¤10,862.40 | 04/23/2014 |
| REINSPECTION FEE | ¤40.00 | 04/23/2014 |
| REINSPECTION FEE | ¤40.00 | 04/23/2014 |
| REINSPECTION FEE | ¤40.00 | 04/23/2014 |
| REINSPECTION FEE | ¤40.00 | 04/23/2014 |
| REVISION | ¤40.00 | 04/23/2014 |
| REVISION | ¤40.00 | 04/23/2014 |
| REVISION | ¤40.00 | 04/23/2014 |
| REVISION | ¤40.00 | 04/23/2014 |
| REVISION | ¤40.00 | 04/23/2014 |
| REVISION | ¤40.00 | 04/23/2014 |
| REVISION | ¤40.00 | 04/23/2014 |
| REVISION | ¤40.00 | 04/23/2014 |
| REVISION | ¤40.00 | 04/23/2014 |
| REVISION | ¤40.00 | 04/23/2014 |
| REVISION | ¤40.00 | 04/23/2014 |
| REVISION | ¤40.00 | 04/23/2014 |
| IMPACT FEE SCHOOL | ¤3,724.00 | 04/23/2014 |
| IMPACT FEE PARKS | ¤5,375.92 | 04/23/2014 |
| IMPACT FEE SCHOOL | (¤3,724.00) | 09/13/2013 |
| IMPACT FEE SCHOOL | ¤3,724.00 | 09/13/2013 |
| FIRE PLANS REVIEW | ¤117.21 | 09/13/2013 |
| FIRE PLANS REVIEW | (¤117.21) | 09/13/2013 |
| FIRE PLANS REVIEW | ¤117.21 | 09/13/2013 |
| IMPACT FEE TRANSPORTATION | (¤10,862.40) | 09/13/2013 |
| SURCHARGE FS 533.721 | ¤127.05 | 09/13/2013 |
| SURCHARGE FS 533.721 | (¤127.05) | 09/13/2013 |
| SURCHARGE FS 533.721 | ¤127.05 | 09/13/2013 |
| SURCHARGE - FS 468.631 | (¤127.05) | 09/13/2013 |
| SURCHARGE - FS 468.631 | ¤127.05 | 09/13/2013 |
| SURCHARGE - FS 468.631 | ¤127.05 | 09/13/2013 |
| IMPACT FEE TRANSPORTATION | ¤10,862.40 | 09/13/2013 |
| MECHANICAL FEE | ¤644.40 | 09/13/2013 |
| MECHANICAL FEE | (¤644.40) | 09/13/2013 |
| MECHANICAL FEE | ¤644.40 | 09/13/2013 |
| PERMIT FEE | (¤5,357.00) | 09/13/2013 |
| PERMIT FEE | ¤5,357.00 | 09/13/2013 |
| PERMIT FEE | ¤5,357.00 | 09/13/2013 |
| PLAN CHECK FEE | ¤1,120.10 | 09/13/2013 |
| PLAN CHECK FEE | (¤1,120.10) | 09/13/2013 |
| PLAN CHECK FEE | ¤1,120.10 | 09/13/2013 |
| PLUMBING FEE | (¤644.40) | 09/13/2013 |
| PLUMBING FEE | ¤644.40 | 09/13/2013 |
| PLUMBING FEE | ¤644.40 | 09/13/2013 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤831.96 | 09/13/2013 |
| IMPACT FEE PARKS | ¤5,375.92 | 09/13/2013 |
| IMPACT FEE PARKS | (¤5,375.92) | 09/13/2013 |
| ADMIN COMMERCIAL | (¤60.00) | 09/13/2013 |
| ADMIN COMMERCIAL | ¤60.00 | 09/13/2013 |
| ADMIN COMMERCIAL | ¤60.00 | 09/13/2013 |
| ELECTRIC FEE | ¤644.40 | 09/13/2013 |
| ELECTRIC FEE | (¤644.40) | 09/13/2013 |
| ELECTRIC FEE | ¤644.40 | 09/13/2013 |
| IMPACT FEE FIRE NONRESIDENTIAL | (¤831.96) | 09/13/2013 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤30,275.89 |