I want to search for...
Permit #2013080305
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7029-00180-0040 |
| CONDITIONED SPACE: 288 sqft |
| OPENED PORCH (WITH ROOF) : 288 sqft |
| Total Square Footage: 576 sqft |
| Block: 00180 |
| Subdivision: 2209 - SECTION 29-ROYAL PALMS |
| Job Phone: (386)986-2224 |
| Location Address: 57 RYLAND DR |
| Type: BA - BUILDING ADDITION |
| Issue Date: 08/19/2013 |
| NOC: RECORDED |
| Applicant name: WILLIAM P WHITLEY III |
| Owner: KNOB, STEVEN E & SHERRIE L |
|
Address TRUSTEES PALM COAST, FL 32164 |
|
Address 57 RYLAND DRIVE PALM COAST, FL 32164 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤52,555.00 |
| Job Description: BEDROOM ADDITION W/BATHROOM AND ADDITION OF A SECOND FLOOR BALCONY |
| Type: CN |
Contractor
WHITLEY BUILDERS LLC
| Status | Location Address | State License Number | Phone |
| CANCEL |
6 BUTTONWELL LANE PALM COAST, FL 32137 |
CBC1255213 (Exp: 08/31/2018) | (386)986-2224 |
Sub Contractors
MARK DANIEL EIDMAN JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
15 HARGROVE LANE UNIT 2C PALM COAST, FL 32137 |
CAC1817213 (Exp: 08/31/2026) | 386-446-8894 |
JONATHAN P DUCEY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
505 WEST COURT STREET BUNNELL, FL 32110 |
CFC1427093 (Exp: 08/31/2026) | 386-503-6092 |
RICHARD ALLAN TENNYSON
| Status | Location Address | State License Number | Phone |
| INACTIVE |
1919 ELLMAN STREET ORLANDO, FL 32804 |
CCC1327016 (Exp: 08/31/2026) | 407-322-7663 |
JOHN EDWARD GAMBONE
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
55 BARRISTER LN PALM COAST, FL 32137 |
ER13013466 (Exp: 08/31/2014) | 386-586-9144 | (386)246-6305 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 06/10/2014 | FINAL APPROVED | DSPENCER |
| BLD - BUILDING FINAL | 06/09/2014 | FINAL APPROVED | CMINI |
| BLD - BUILDING FINAL | 06/06/2014 | CANCELLED BY APPLICANT | AIRS WEB |
| FINAL SURVEY (OFFICE USE ONLY) | 06/05/2014 | APPROVED | JHINDMAN |
| PLUMBING 2ND ROUGH | 05/02/2014 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| PLUMBING 2ND ROUGH | 05/01/2014 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Inspection Resulted at 5/1/2014 2:44:39 PM NO TEST PRESSURE ON WATER LINES AS REQUIRED PER FBC-PLUMBING 2503.7 | |||
| INSULATION | 04/11/2014 | APPROVED | DROCKWELL |
| ALL ROUGH | 04/10/2014 | APPROVED | RMARVEL |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/10/2014 | APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION | |||
| FRAMING | 11/08/2013 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Inspection Resulted at 11/8/2013 2:48:05 PM PLANS ON SITE ARE NOT LEDGEIBLE-THIS IS MY 2ND STOP HERE THIS AM.MUST CALL IN ROOF SHEATHING BRACES TIES ETC AND NOT A FRAMING. SEE PLACCARD FOR PROPER INSPECTION CALL-IN | |||
| ELECTRIC 2ND ROUGH | 11/08/2013 | CANCELLED BY INSPECTOR | DROCKWELL |
| Note: Inspection Resulted at 11/8/2013 2:48:05 PM MUST CALL FOR INSPECTION LISTED ON PLACCARD-ALL ROUGH NOT ELECT 2ND ROUGH. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/18/2013 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: by owner Inspection Resulted at 10/18/2013 2:45:59 PM FLOOR SYSTEM DOES NOT MATCH CITY STAMPED APPROVED PLANS. UNABLE TO SEE FASTENERS FOR ATTACHMENT PATTERNS OF FLOOR SYSTEM. FINAL LAYER NOT FULLY ADHERED AS PER PLANS. | |||
| TIE BEAM / LINTEL | 09/11/2013 | APPROVED | DROCKWELL |
| Note: per contractor | |||
| FOUND SURVEY APPROVED (OFFICE) | 09/10/2013 | APPROVED | JMCGOWEN |
| MONOLITHIC SLAB | 08/26/2013 | APPROVED - AS NOTED | DROCKWELL |
| Note: Inspection Resulted at 8/26/2013 12:28:14 PM CLEAN FOOTER UNDER 4IN PIPE | |||
| GRAVITY SEWER TEST | 08/22/2013 | APPROVED | CMINI |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/22/2013 | APPROVED | CMINI |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 06/05/2014 | 06/05/2014 |
| Note: Released By: JHINDMAN final survey | |||
| BLD | COMPLETE | 03/06/2014 | 03/06/2014 |
| BLD | HOLD | 03/04/2014 | 03/05/2014 |
| Note: 1. Provide florida product approval with installation instructions for the new roofing system. 2010 FBC 107.2.1. J. Hindman 986-3784. | |||
| BLD | COMPLETE | 11/20/2013 | 11/21/2013 |
| ELEC | COMPLETE | 11/20/2013 | 11/21/2013 |
| BLD | HOLD | 11/13/2013 | 11/13/2013 |
| Note: Any hand written changes to an signed and sealed drawing will need to be resigned and sealed and initialed by D.P.O.R. FBC 107.1 | |||
| BLD | HOLD | 10/22/2013 | 10/24/2013 |
| Note: Provide a coordinated plan. the revised plan has two different details for the ledger at the house. 2010 FBC 107.2.1. 2. The downstairs french door location | |||
| BLD | HOLD | 10/17/2013 | 10/17/2013 |
| Note: 1. Provide a coordinated plan. the revised plan has two different details for the ledger at the house. 2010 FBC 107.2.1. 2. The downstairs french door location is at the same location as the plan that is on file. please clarify the change. | |||
| SW1 | COMPLETE | 09/10/2013 | 09/10/2013 |
| Note: Released By: JMCGOWEN foundation survey | |||
| ZON | COMPLETE | 09/10/2013 | 09/10/2013 |
| Note: Released By: JMCGOWEN foundation survey | |||
| BLD | COMPLETE | 08/13/2013 | 08/14/2013 |
| ELEC | COMPLETE | 08/13/2013 | 08/14/2013 |
| MECH | COMPLETE | 08/13/2013 | 08/13/2013 |
| PLUM | COMPLETE | 08/13/2013 | 08/13/2013 |
| SW1 | COMPLETE | 08/13/2013 | 08/14/2013 |
| ZON | COMPLETE | 08/13/2013 | 08/17/2013 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 06/09/2014 |
| REINSPECTION FEE | ¤40.00 | 06/09/2014 |
| REINSPECTION FEE | ¤40.00 | 06/09/2014 |
| REVISION | ¤40.00 | 06/09/2014 |
| REVISION | ¤40.00 | 06/09/2014 |
| REVISION | ¤40.00 | 06/09/2014 |
| SITE PLAN 20 | ¤20.00 | 08/19/2013 |
| SURCHARGE FS 533.721 | ¤5.63 | 08/19/2013 |
| SURCHARGE - FS 468.631 | ¤5.63 | 08/19/2013 |
| STORM WATER PERMIT FEES | ¤80.00 | 08/19/2013 |
| REMODEL/ADDITION/ACCES INSPECT | ¤40.00 | 08/19/2013 |
| ADMIN FEE | ¤20.00 | 08/19/2013 |
| ELECTRIC FEE | ¤91.80 | 08/19/2013 |
| MECHANICAL FEE | ¤91.80 | 08/19/2013 |
| PLAN CHECK FEE | ¤40.00 | 08/19/2013 |
| PLUMBING FEE | ¤91.80 | 08/19/2013 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤726.66 |