Permit #2013080570
Permit Details
Status: COED
| Parcel Id: 48-11-31-1700-00000-0090 |
| CONDITIONED SPACE: 2969 sqft |
| GARAGE: 847 sqft |
| OPENED PORCH (WITH ROOF) : 722 sqft |
| PATIO/DECK (NO ROOF) : 88 sqft |
| Total Square Footage: 4626 sqft |
| Block: 00000 |
| Subdivision: 2086 - ESTATES AT GRAND HAVEN PHASE I |
| Job Phone: 386-236-4133 |
| Location Address: 121 WILLOW OAK WAY |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/04/2013 |
| NOC: RECORDED |
| Applicant name: KEVIN MICHAEL MAYS |
| Owner: ICI FLAGLER RESIDENTIAL HOLDING LLC |
|
Address 2379 BEVILLE ROAD DAYTONA BEACH, FL 32119 |
| Lot: 0090 |
| Contracted Stated Job Value: ¤385,227.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
INTERVEST CONSTRUCTION, INC
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
2379 BEVILLE ROAD DAYTONA BEACH, FL 32119 |
CGC1517573 (Exp: 08/31/2018) | 386-236-4133 | 386-763-7833 |
Sub Contractors
STEPHEN COURTEAUX
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
85 North Yonge Street Ormond Beach, FL 32174 |
EC13001748 (Exp: 08/31/2026) | (386) 672-4900 | 386-676-7472 |
CHRIS C KOONTZ
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
651 CARSWELL AVE Holly Hill, FL 32117 |
CAC035563 (Exp: 08/31/2024) | (386) 252-1878 | (386)252-9703 |
GLEN WILLIAM KEHLE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 353511 BUNNELL, FL 32110 |
CFC057241 (Exp: 08/31/2026) | (386) 447-4249 | (386) 437-8488 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW FINAL | 03/06/2014 | APPROVED | GLALIMA |
| Note: PER JEANN PASSED PER GARY LALIMA ON THE 27th BECAUSE THE G.M CALLED AND I WENT BACK . | |||
| U -UTILITY RESIDENTIAL FINAL | 03/05/2014 | FINAL APPROVED | DSPENCER |
| BLD - BUILDING FINAL | 02/28/2014 | FINAL APPROVED | CMINI |
| FINAL SURVEY (OFFICE USE ONLY) | 02/27/2014 | APPROVED | FREODICA |
| FINAL APRON (AFTER POUR/DRIVEWAY) | 02/26/2014 | APPROVED | GLALIMA |
| Note: THIS IS A REINSPECTION | |||
| FINAL APRON (AFTER POUR/DRIVEWAY) | 02/25/2014 | CANCELLED BY APPLICANT | GLALIMA |
| Note: HAD TO REMOVE DUMPSTER AND TOILET FROM RIGHT OF WAY AND SOD IF NEEDED . ALSO NEED TO SWEEP STREET GUTER | |||
| ELECTRIC - EARLY POWER | 02/19/2014 | APPROVED | DROCKWELL |
| PRE-APRON (PRE-POUR/DRIVEWAY) | 02/11/2014 | APPROVED | GLALIMA |
| Note: THIS IS A REINSPECTION THIS WAS A 2 PART INSPECTIONS BECAUSE OF RAIN AND DRIVEWAY FORMS WERE OF SET. WENT OVER THIS WILL THE BOSS MAN AT I . C . I | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 02/05/2014 | Disapproved - NO FEE | GLALIMA |
| Note: FORMS AR DAMAGED AND MISSING ON RIGHT. ON SITE WITH G. M. BUILDER I . C . I ALSO CHECK THE CENTER LINE OF DRIVEWAY TO HOUSE LOCATION . WAY OFF . IF NEEDED CALL GARY LA LIMA 585 - 0287 NO FEE THIS TIME | |||
| INSULATION | 01/17/2014 | APPROVED | DROCKWELL |
| ALL ROUGH | 01/14/2014 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 1/14/2014 2:47:22 PM ARCH WINDOW ATTACHMENTS...REAR DOOR IN BATH ATTACHMENTS | |||
| LATH/BRICK/ WATER BARRIER | 01/14/2014 | APPROVED | CMINI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/13/2013 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/12/2013 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Inspection Resulted at 12/12/2013 3:24:31 PM STRAP R26 TRUSSES TO WALL (7)/PAD OUT R47 GIRDER STRAP/REMOVE SHINERS IN WALL SHEATHING AT ENTRY LEFT SIDE OVER ROOF AND RE-NAIL LOOSE SHEETS/NAIL WALL SHEATHING AT RIGHT SIDE ENTRY AT BEDROOM FRONT | |||
| ELECTRIC TEMP POLE | 11/18/2013 | APPROVED - AS NOTED | DROCKWELL |
| Note: Inspection Resulted at 11/18/2013 3:32:47 PM THIS IS A TUG | |||
| TIE BEAM / LINTEL | 11/07/2013 | APPROVED | CMINI |
| Note: per contractor | |||
| FOUND SURVEY APPROVED (OFFICE) | 11/06/2013 | APPROVED | JMCGOWEN |
| ELEV CERT-FOUNDATION APPROVAL | 11/05/2013 | APPROVED | CBENTLEY |
| MONOLITHIC SLAB | 10/17/2013 | APPROVED | CMINI |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/11/2013 | APPROVED | CMINI |
| GRAVITY SEWER TEST | 10/11/2013 | APPROVED | CMINI |
| U - SEWER TIE IN | 10/10/2013 | APPROVED | DSPENCER |
Review History
| Department | Status | Date In | Date Out |
| PLFM | HOLD | 03/05/2014 | 03/05/2014 |
| Note: Held By: DRAMIREZ B.4 Map/Panel Number is incorrect. Please update to show the correct panel number. Surveyor was called and he is aware of the issue. | |||
| PLFM | COMPLETE | 03/05/2014 | 03/05/2014 |
| Note: Released By: DRAMIREZ Elevation certificate corrected. By Denise Bevan | |||
| PLFM | COMPLETE | 03/04/2014 | 03/04/2014 |
| PLFM | HOLD | 02/27/2014 | 02/27/2014 |
| Note: 1. Section A5: The coordinate for latitude is different than “Building” stage elevation certificate and appears incorrect. Please modify with the correct coordinate (29.548501). 2. Section B6. FIRM Index Date and Section B7 FIRM Panel Effective/Revised Date are both incorrect and should depict 07/17/2006. 3. Please verify the conversion difference between NGVD 1929 and NAVD 1988. | |||
| SW1 | COMPLETE | 02/27/2014 | 02/27/2014 |
| Note: Released By: FREODICA approved site plan is missing. | |||
| ELEC | COMPLETE | 01/08/2014 | 01/09/2014 |
| MECH | COMPLETE | 01/08/2014 | 01/09/2014 |
| SW1 | COMPLETE | 11/06/2013 | 11/06/2013 |
| Note: Released By: JMCGOWEN corrections to foundation survey approved by Constants Bentley | |||
| ZON | COMPLETE | 11/06/2013 | 11/06/2013 |
| Note: Released By: JMCGOWEN corrections foundation survey approved by Constants Bentley | |||
| PLFM | COMPLETE | 11/04/2013 | 11/05/2013 |
| BLD | COMPLETE | 10/31/2013 | 11/01/2013 |
| MECH | COMPLETE | 10/31/2013 | 11/01/2013 |
| Note: Revision- changed hvac units from carrier to lennox and energy calc. | |||
| PLFM | HOLD | 10/31/2013 | 11/01/2013 |
| Note: 1. Revise C2a for 1929 datum. 2. In Section D check box indicating that there are comments on the back of the form. 3. In Section D provide comment for proposed C2e. | |||
| SW1 | HOLD | 10/31/2013 | 10/31/2013 |
| Note: Held By: JMCGOWEN foundation Foundation survey shows FFE at 10.77' and your proposed FFE is 11.20 please revise | |||
| ZON | HOLD | 10/31/2013 | 10/31/2013 |
| Note: Held By: JMCGOWEN foundation survey Foundation survey shows FFE at 10.77' and your proposed FFE is 11.20 please revise | |||
| ELEC | COMPLETE | 08/30/2013 | 09/03/2013 |
| PLFM | COMPLETE | 08/27/2013 | 08/28/2013 |
| BLD | COMPLETE | 08/22/2013 | 08/26/2013 |
| ELEC | HOLD | 08/22/2013 | 08/23/2013 |
| Note: Revise receptacle locations to meet NEC 210.52 | |||
| ENGIN1 | COMPLETE | 08/22/2013 | 08/23/2013 |
| Note: No swale plan required. | |||
| MECH | COMPLETE | 08/22/2013 | 08/23/2013 |
| PLUM | COMPLETE | 08/22/2013 | 08/23/2013 |
| SW1 | COMPLETE | 08/22/2013 | 08/23/2013 |
| UD1 | COMPLETE | 08/22/2013 | 08/23/2013 |
| Note: See comment in general notes Keith King 386-9318009 | |||
| URB | COMPLETE | 08/22/2013 | 08/23/2013 |
| ZON | COMPLETE | 08/22/2013 | 08/27/2013 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REVISION | ¤40.00 | 03/06/2014 |
| REVISION | ¤40.00 | 03/06/2014 |
| REINSPECTION FEE | ¤40.00 | 03/06/2014 |
| NEW RESIDENTIAL INSPECTIONS | ¤772.00 | 09/04/2013 |
| SITE PLAN 20 | ¤20.00 | 09/04/2013 |
| SURCHARGE FS 533.721 | ¤27.32 | 09/04/2013 |
| SURCHARGE - FS 468.631 | ¤27.32 | 09/04/2013 |
| STORM WATER PERMIT FEES | ¤80.00 | 09/04/2013 |
| 3% TRANS IMPACT FEE CREDIT | (¤90.51) | 09/04/2013 |
| ADMIN FEE | ¤20.00 | 09/04/2013 |
| ELECTRIC FEE | ¤291.60 | 09/04/2013 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.24) | 09/04/2013 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤207.99 | 09/04/2013 |
| IMPACT FEE PARKS | ¤1,343.98 | 09/04/2013 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 09/04/2013 |
| IMPACT FEE TRANSPORTATION | ¤3,017.05 | 09/04/2013 |
| MECHANICAL FEE | ¤291.60 | 09/04/2013 |
| 3% PARKS IMPACT FEE CREDIT | (¤40.32) | 09/04/2013 |
| PLAN CHECK FEE | ¤154.40 | 09/04/2013 |
| PLUMBING FEE | ¤291.60 | 09/04/2013 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤10,127.79 |