Permit #2013080687

Permit Details

Status: COED

Parcel Id: 07-11-31-7009-00070-0090
CONDITIONED SPACE: 2035 sqft
GARAGE: 463 sqft
OPENED PORCH (WITH ROOF) : 197 sqft
PATIO/DECK (NO ROOF) : 73 sqft
Total Square Footage: 2768 sqft
Block: 00070
Subdivision: 2208 - SECTION 9-FLORIDA PARK
Job Phone: 386-672-6101
Location Address: 33 FARISTON PL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/23/2013
NOC: RECORDED
Applicant name: JOHN DAVID MINABERRY
Owner: BYRNE, JAMES & LORI

Address

33 FARISTON PL

PALM COAST, FL 32137

Lot: 0090
Contracted Stated Job Value: ¤220,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

KEYSTONE HOMES
Status Location Address State License Number Phone Fax
ACTIVE

1339 W GRANADA BLVD

ORMOND, FL 32174

CRC1329222 (Exp: 08/31/2026) 386-672-6101 386-672-6102

Sub Contractors

PETER JOSEPH LYDEN
Status Location Address State License Number Phone
CANCEL

17 UNIMAY CT

BUNNELL, FL 32110

EC0002436 (Exp: 08/31/2022) 386-931-2568
PAUL S AIELLO
Status Location Address State License Number Phone Fax
CANCEL

PO BOX 351926

PALM COAST, FL 32137

CAC1815808 (Exp: 08/31/2016) (386)239-0053 (386)323-1955
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
WAYNE A PHILLIPS
Status Location Address State License Number Phone Fax
ACTIVE

357 ANDREWS ST

ORMOND BEACH, FL 32174

CVC56698 (Exp: 08/31/2026) (386)673-9720 (386)673-9840
STEPHEN M RENDE
Status Location Address State License Number Phone
CANCEL

22 ALAMANDA DRIVE

ORMOND, FL 32176

CCC058058 (Exp: 08/31/2020) 386-439-7156

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 06/13/2014 APPROVED DSPENCER
FINAL APRON (AFTER POUR/DRIVEWAY) 06/11/2014 APPROVED RGROSS
Note: THIS IS A REINSPECTION
ROW FINAL 06/11/2014 APPROVED RGROSS
BLD - BUILDING FINAL 06/11/2014 FINAL APPROVED CMINI
FINAL SURVEY (OFFICE USE ONLY) 06/09/2014 APPROVED JMCGOWEN
FINAL APRON (AFTER POUR/DRIVEWAY) 06/05/2014 Disapproved -FEE REQUIRED RGROSS
Note: Concrete cannot be allowed to enter the roadway. Need to cut the asphalt out at the end of the driveway and the entire width and replace with hot patch. See Paint marks.
ELECTRIC - EARLY POWER 05/20/2014 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 5/20/2014 3:29:13 PM CALLED FPL TO RELEASE POWER AT 2:20 PM,SPOKE WITH SUSAN
PRE-APRON (PRE-POUR/DRIVEWAY) 04/29/2014 APPROVED RGROSS
Note: READY TO POUR
U - SEWER TIE IN 03/12/2014 APPROVED DSPENCER
GRAVITY SEWER TEST 03/12/2014 APPROVED CMINI
LATH/BRICK/ WATER BARRIER 01/21/2014 APPROVED CMINI
Note: THIS IS A REINSPECTION
LATH/BRICK/ WATER BARRIER 01/17/2014 Disapproved -FEE REQUIRED DROCKWELL
Note: Inspection Resulted at 1/17/2014 3:02:20 PM WORK NOT COMPLETED/NOT READY FOR INSPECTION
INSULATION 01/13/2014 APPROVED CMINI
Note: THIS IS A REINSPECTION
INSULATION 01/09/2014 Disapproved -FEE REQUIRED RMARVEL
Note: Inspection Resulted at 1/9/2014 3:31:36 PM UNABLE TO CHECK FOR APPROVED FIRE RATED FOAM/CAULK ABOVE ELECTRICAL PANEL. MISSED MULTIPLE HOLES LEADING INTO ATTAC AREA. TOO MANY TO LIST. FIREBLOCKING NEEDED…..F.B.C. 302.11
ALL ROUGH 01/03/2014 APPROVED CMINI
Note: THIS IS A REINSPECTION
ALL ROUGH 12/31/2013 Disapproved -FEE REQUIRED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 12/31/2013 3:29:55 PM NAIL PLATES NEEDED ON ELECTRIC, WIRES STAPLED WITHIN 1-1/4" FROM FRAMING EDGE...NEC 300.4 (D),METAL BOX IN MASTER CEILING NOT GROUNDED NEC 314.4...WIRE IN CLOSET 3RD BD.RM. HANGING BELOW CEILING LINE...FRONT ENTRY ARCH WINDOW 1 SCREW NOT CATCHING 2X
ALL ROUGH 12/30/2013 Disapproved -FEE REQUIRED CMINI
Note: Inspection Resulted at 12/30/2013 3:19:08 PM METAL BOXES SHALL BE GROUNDED MISSING IN MULTIPLE LOCATIONS,CHECK ALL.. NEC.314.4.NAIL PLATES NEEDED ON ELECTRIC, WIRES STAPLED WITHIN 1-1/4" FROM FRAMING EDGE.AND AT TOP OF PANEL..NEC 300.4..WINDOW HUNG UP ON TAPCON WILL NOT CLOSE,CHECK OTHER WINDOWS WITH TAPCONS NOT FULLY ANCHORED...FIRE BLOCK NEEDED AT CHASE BEHIND A/C STAND..HVAC DUCT LAYOUT MISSING FROM PLANS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/16/2013 APPROVED DROCKWELL
Note: THIS IS A REINSPECTION Inspection Resulted at 12/16/2013 3:31:19 PM CORRECTIONS MADE
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/10/2013 Disapproved -FEE REQUIRED RMARVEL
Note: per contractor Inspection Resulted at 12/10/2013 3:01:03 PM LOOSE SHEATHING CIRCLED ON PLANS. ATTACH PER APPROVED PLANS. MISSING ENGINEERING ON TRUSS 09. REPAIR OVERNOTCHED BEARING WALL AT GARAGE.
ELECTRIC TEMP POLE 11/06/2013 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 11/6/2013 3:09:34 PM CALLED FPL TO RELEASE POWER AT 11:45,SPOKE WITH KAREN
TIE BEAM / LINTEL 10/31/2013 APPROVED CMINI
Note: THIS IS A REINSPECTION
TIE BEAM / LINTEL 10/30/2013 Disapproved -FEE REQUIRED RMARVEL
Note: Inspection Resulted at 10/30/2013 2:40:30 PM CLEARANCE FROM REBAR TO MASONRY F.B.C 606.9.4 CIRCLED ON PLANS. EPOXIED DOWEL IS LOOSE. NOT BONDED TO CONCRETE.
FOUND SURVEY APPROVED (OFFICE) 10/29/2013 APPROVED FREODICA
MONOLITHIC SLAB 10/16/2013 APPROVED CMINI
PLUMBING 1ST ROUGH UNDERGROUND 10/11/2013 APPROVED CMINI

Review History

Department Status Date In Date Out
SW1 COMPLETE 06/09/2014 06/09/2014
Note: Released By: JMCGOWEN
URB COMPLETE 05/23/2014 05/27/2014
ELEC COMPLETE 12/20/2013 12/20/2013
ELEC HOLD 12/19/2013 12/19/2013
Note: Provide signed and sealed drawing for electric revision FBC 107.1
ZON COMPLETE 12/18/2013 12/18/2013
BLD COMPLETE 12/06/2013 12/06/2013
SW1 COMPLETE 10/29/2013 10/29/2013
Note: Released By: FREODICA foundation survey
ZON COMPLETE 10/29/2013 10/29/2013
Note: Released By: FREODICA foundation
ELEC COMPLETE 09/04/2013 09/04/2013
ENGIN1 COMPLETE 09/04/2013 09/05/2013
BLD COMPLETE 08/28/2013 08/29/2013
ELEC HOLD 08/28/2013 08/29/2013
Note: 1. Provide electrical panel location. 2008 NEC 110.26 2. Provide a receptacle at bedroom number three under the light switches. 2008 NEC 210.52.
ENGIN1 HOLD 08/28/2013 09/04/2013
Note: No resubmittal required.
MECH COMPLETE 08/28/2013 08/29/2013
PLUM COMPLETE 08/28/2013 08/29/2013
SW1 COMPLETE 08/28/2013 08/29/2013
UD1 COMPLETE 08/28/2013 08/29/2013
Note: See comment in general notes Keith King 386-9318009
URB COMPLETE 08/28/2013 08/30/2013
ZON COMPLETE 08/28/2013 09/03/2013

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 06/10/2014
REINSPECTION FEE ¤40.00 06/10/2014
REINSPECTION FEE ¤40.00 06/10/2014
REINSPECTION FEE ¤40.00 06/10/2014
REINSPECTION FEE ¤40.00 06/10/2014
REINSPECTION FEE ¤40.00 06/10/2014
REINSPECTION FEE ¤40.00 06/10/2014
REINSPECTION FEE ¤40.00 06/10/2014
REVISION ¤40.00 06/10/2014
REVISION ¤40.00 06/10/2014
SITE PLAN 20 ¤20.00 09/23/2013
SURCHARGE FS 533.721 ¤18.44 09/23/2013
SURCHARGE - FS 468.631 ¤18.44 09/23/2013
STORM WATER PERMIT FEES ¤80.00 09/23/2013
3% TRANS IMPACT FEE CREDIT (¤90.51) 09/23/2013
ADMIN FEE ¤20.00 09/23/2013
NEW RESIDENTIAL INSPECTIONS ¤490.00 09/23/2013
ELECTRIC FEE ¤207.00 09/23/2013
3% FIRE IMPACT FEE CREDIT (¤6.24) 09/23/2013
IMPACT FEE FIRE NONRESIDENTIAL ¤207.99 09/23/2013
IMPACT FEE PARKS ¤1,343.98 09/23/2013
IMPACT FEE SCHOOL ¤3,600.00 09/23/2013
IMPACT FEE TRANSPORTATION ¤3,017.05 09/23/2013
MECHANICAL FEE ¤207.00 09/23/2013
3% PARKS IMPACT FEE CREDIT (¤40.32) 09/23/2013
PLAN CHECK FEE ¤98.00 09/23/2013
PLUMBING FEE ¤207.00 09/23/2013
Fees Total Due: ¤0.00 Total Paid: ¤9,797.83