I want to search for...

Permit #2013090034

Permit Details

Status: COED

Parcel Id: 16-11-31-1260-00000-0230
CONDITIONED SPACE: 2335 sqft
GARAGE: 528 sqft
SCREEN PORCH (SOLID ROOF) : 220 sqft
PATIO/DECK (NO ROOF) : 54 sqft
Total Square Footage: 3137 sqft
Block: 00000
Subdivision: 2081 - Creekside Village at Grand Haven
Job Phone: 386-236-4133
Location Address: 18 SWEETWATER CT
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/20/2013
NOC: RECORDED
Applicant name: KEVIN MICHAEL MAYS
Owner: BIRKEL, BRIAN W & JEANNE M

Address

9 GIBBS ROAD

AMITY HARBOR, NY 11701

Lot: 0230
Contracted Stated Job Value: ¤282,609.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

INTERVEST CONSTRUCTION, INC
Status Location Address State License Number Phone Fax
CANCEL

2379 BEVILLE ROAD

DAYTONA BEACH, FL 32119

CGC1517573 (Exp: 08/31/2018) 386-236-4133 386-763-7833

Sub Contractors

STEPHEN COURTEAUX
Status Location Address State License Number Phone Fax
ACTIVE

85 North Yonge Street

Ormond Beach, FL 32174

EC13001748 (Exp: 08/31/2026) (386) 672-4900 386-676-7472
CHRIS C KOONTZ
Status Location Address State License Number Phone Fax
INACTIVE

651 CARSWELL AVE

Holly Hill, FL 32117

CAC035563 (Exp: 08/31/2024) (386) 252-1878 (386)252-9703
GLEN WILLIAM KEHLE
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 353511

BUNNELL, FL 32110

CFC057241 (Exp: 08/31/2026) (386) 447-4249 (386) 437-8488
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 05/16/2014 FINAL APPROVED DSPENCER
BLD - BUILDING FINAL 05/15/2014 FINAL APPROVED CMINI
ROW FINAL 05/13/2014 APPROVED GLALIMA
Note: THIS IS A REINSPECTION
FINAL APRON (AFTER POUR/DRIVEWAY) 05/12/2014 APPROVED GLALIMA
ROW FINAL 05/12/2014 Disapproved - NO FEE GLALIMA
Note: FILL IN RUTS AND DAMAGE TO SWALE ON VACANT LOT TO THE LEFT AND CLEAN OUT STREET GUTTER
FINAL SURVEY (OFFICE USE ONLY) 04/29/2014 APPROVED JMCGOWEN
ELECTRIC - EARLY POWER 04/23/2014 APPROVED CMINI
Note: Inspection Resulted at 4/23/2014 3:39:56 PM CALLED FPL TO RELEASE POWER AT 2:00 SPOKE WITH KAREN
PRE-APRON (PRE-POUR/DRIVEWAY) 04/03/2014 APPROVED RGROSS
LATH/BRICK/ WATER BARRIER 02/27/2014 APPROVED CMINI
INSULATION 02/25/2014 APPROVED CMINI
ALL ROUGH 02/21/2014 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 2/21/2014 3:05:01 PM ADD OUTLETS LEFT OF MB.RM DOOR WITH IN 6`` AND LEFT OF STOVE FOR 24",SEAL UNUSED OPENINGS IN SWITCH BOXES CHECK ALL
GRAVITY SEWER TEST 02/20/2014 APPROVED DROCKWELL
U - SEWER TIE IN 02/20/2014 APPROVED DSPENCER
ALL ROUGH 02/19/2014 Disapproved -FEE REQUIRED DROCKWELL
Note: Inspection Resulted at 2/19/2014 3:24:44 PM APPROVED STAMPED ELECTRIC PLAN NOT ON SITE
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/29/2014 APPROVED CMINI
Note: Inspection Resulted at 1/29/2014 3:27:31 PM ROOF DRY IN
U - SEWER TIE IN 01/29/2014 APPROVED DSPENCER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/27/2014 APPROVED CMINI
Note: THIS IS A REINSPECTION
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/24/2014 CANCELLED BY APPLICANT CMINI
TIE BEAM / LINTEL 01/02/2014 APPROVED CMINI
FOUND SURVEY APPROVED (OFFICE) 12/31/2013 APPROVED JHINDMAN
MONOLITHIC SLAB 12/11/2013 APPROVED DROCKWELL
PLUMBING 1ST ROUGH UNDERGROUND 12/09/2013 APPROVED RMARVEL
Note: THIS IS A REINSPECTION
PLUMBING 1ST ROUGH UNDERGROUND 12/04/2013 Disapproved -FEE REQUIRED RMARVEL
Note: Inspection Resulted at 12/4/2013 3:55:42 PM PLUMBING RISER DIGRAM DOES NOT MATCH EXISTING WORK. INSTALL TO APPROVED PLANS OR REVISE.
RETAINING WALL 11/20/2013 APPROVED CMINI
FOOTER 11/05/2013 APPROVED CMINI
Note: THIS IS A REINSPECTION
FOOTER 10/11/2013 Disapproved -FEE REQUIRED CMINI
Note: Inspection Resulted at 10/11/2013 2:56:33 PM NEED TO HAVE FOOTPRINT OF FOOTER ON PLANS..DOES NOT MATCH,BUILDER IS INCORPERATING POOL FOOTER..NEED TO MAINTAIN FOOTER DEPTH THROUGH OUT BY USING FORMS IF EARTH CAN NOT MEET IT
ELECTRIC TEMP POLE 09/25/2013 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 9/25/2013 3:19:39 PM CALLED FPL TO RELEASE POWER AT 130,SPOKE WITH SUSAN

Review History

Department Status Date In Date Out
SW1 COMPLETE 04/29/2014 04/29/2014
Note: Released By: JMCGOWEN final s
BLD COMPLETE 04/21/2014 04/21/2014
Note: n/a
SW1 COMPLETE 04/21/2014 04/21/2014
ZON COMPLETE 04/21/2014 04/21/2014
BLD COMPLETE 02/14/2014 02/14/2014
PLFM COMPLETE 12/31/2013 01/07/2014
Note: A "Final" construction stage elevation certificate will not be required.
SW1 COMPLETE 12/31/2013 12/31/2013
Note: Released By: JHINDMAN foundation
PLUM COMPLETE 12/05/2013 12/05/2013
Note: Released By: FREODICA Revision - changed sanitary riser diagram.
ZON COMPLETE 10/24/2013 10/30/2013
ENGIN1 COMPLETE 10/24/2013 10/24/2013
ZON HOLD 10/18/2013 10/23/2013
Note: Revise plans to show proposed finish and color of the stemwall. Revise site plan to show location and dimesions of proposed steps.
BLD COMPLETE 10/17/2013 10/17/2013
SW1 COMPLETE 10/17/2013 10/17/2013
PLFM COMPLETE 09/19/2013 09/20/2013
Note: Released By: DBEVAN
PLFM HOLD 09/18/2013 09/18/2013
Note: Held By: DBEVAN Pursuant to a conversation with Mr. Steven Kruger, please modify Section Dand check applicable boxes of the elevation certificate which is applicable to the the certifying professional. Resubmit a modified elevation certificate.
ELEC COMPLETE 09/17/2013 09/17/2013
BLD COMPLETE 09/17/2013 09/17/2013
ZON COMPLETE 09/17/2013 09/18/2013
ELEC HOLD 09/11/2013 09/11/2013
Note: Revise electric load calculation and panel schedule to include electrician’s license number and qualifier’s name FBC 107.1
PLUM COMPLETE 09/11/2013 09/11/2013
SW1 COMPLETE 09/11/2013 09/11/2013
MECH COMPLETE 09/11/2013 09/11/2013
BLD HOLD 09/11/2013 09/11/2013
Note: 1. Remove the code references from the shop drawings per 2010 FBC 107.1
ZON HOLD 09/11/2013 09/13/2013
Note: Provide elevation certificate.
BLD HOLD 09/04/2013 09/05/2013
Note: 1. Remove code references from the shop drawings per 2010 FBC 107.1.
ELEC HOLD 09/04/2013 09/04/2013
Note: Provide electric load calculations per NEC 220
ENGIN1 COMPLETE 09/04/2013 09/05/2013
Note: No swale plan required.
MECH HOLD 09/04/2013 09/04/2013
Note: Provide supply air at bath 2 per 2010 FBC 107.2.1.
PLUM HOLD 09/04/2013 09/04/2013
Note: Revise plumbing riser detail to include utility tub FBC 107.2.1
SW1 HOLD 09/04/2013 09/04/2013
Note: Revise finish floor elevation to 10.30 as per grand haven storm water engineering
UD1 COMPLETE 09/04/2013 09/05/2013
Note: see comment in general notes Keith King 386-9318009
URB COMPLETE 09/04/2013 09/04/2013
ZON HOLD 09/04/2013 09/09/2013
Note: Provide a elevation certificate Revise site and landscape plan to remove proposed pool.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REVISION ¤40.00 05/16/2014
REVISION ¤40.00 05/16/2014
REVISION ¤40.00 05/16/2014
REINSPECTION FEE ¤40.00 05/16/2014
REINSPECTION FEE ¤40.00 05/16/2014
REINSPECTION FEE ¤40.00 05/16/2014
NEW RESIDENTIAL INSPECTIONS ¤566.00 09/20/2013
SITE PLAN 20 ¤20.00 09/20/2013
SURCHARGE FS 533.721 ¤20.83 09/20/2013
SURCHARGE - FS 468.631 ¤20.83 09/20/2013
STORM WATER PERMIT FEES ¤80.00 09/20/2013
3% TRANS IMPACT FEE CREDIT (¤90.51) 09/20/2013
ADMIN FEE ¤20.00 09/20/2013
ELECTRIC FEE ¤229.80 09/20/2013
3% FIRE IMPACT FEE CREDIT (¤6.24) 09/20/2013
IMPACT FEE FIRE NONRESIDENTIAL ¤207.99 09/20/2013
IMPACT FEE PARKS ¤1,343.98 09/20/2013
IMPACT FEE SCHOOL ¤3,600.00 09/20/2013
IMPACT FEE TRANSPORTATION ¤3,017.05 09/20/2013
MECHANICAL FEE ¤229.80 09/20/2013
3% PARKS IMPACT FEE CREDIT (¤40.32) 09/20/2013
PLAN CHECK FEE ¤113.20 09/20/2013
PLUMBING FEE ¤229.80 09/20/2013
Fees Total Due: ¤0.00 Total Paid: ¤9,802.21