Permit #2013090115

Permit Details

Status: COED

Parcel Id: 33-11-31-3060-00040-0020
CONDITIONED SPACE: 1643 sqft
GARAGE: 578 sqft
SCREEN PORCH (SOLID ROOF) : 377 sqft
PATIO/DECK (NO ROOF) : 64 sqft
Total Square Footage: 2662 sqft
Block: 00040
Subdivision: 2106 - HIDDEN LAKES, PHASE 1
Job Phone: (386)445-9055
Location Address: 4 DIAMOND LEAF WAY
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/11/2013
NOC: RECORDED
Applicant name: LUIS JORGE MEDEIROS
Owner: DOS SANTOS, JOAQUIM A & PATRICIA

Address

181 SEABREEZE AVE

MILFORD, CT 06460

Lot: 0020
Contracted Stated Job Value: ¤169,900.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

NEW COASTAL HOMES INC.
Status Location Address Mailing Address State License Number Phone Fax
CANCEL

399 SW PALM COAST PKWY

PALM COAST, FL 32137

STE5

PALM COAST, FL 32137

CRC1327024 (Exp: 08/31/2018) (386)445-9055 (386)445-9056

Sub Contractors

CHARLES K DAVIS
Status Location Address State License Number Phone
ACTIVE

3000 E MOODY BLVD BLDG 2

BUNNELL , FL 32110

EC13004270 (Exp: 08/31/2026) 386-931-6614
PAUL S AIELLO
Status Location Address State License Number Phone Fax
CANCEL

PO BOX 351926

PALM COAST, FL 32137

CAC1815808 (Exp: 08/31/2016) (386)239-0053 (386)323-1955
BARRY D MARTIN
Status Location Address State License Number Phone Fax
CANCEL

1650 N STATE STREET

Bunnell, FL 32110

CCC033728 (Exp: 08/31/2020) (386) 437-7700 (386)437-7701
HEATH EDWARD SANFORD
Status Location Address State License Number Phone Fax
ACTIVE

1351 HAZELNUT ST

BUNNELL, FL 32110

CFC1427527 (Exp: 08/31/2026) 386-445-2532 386-445-5575

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 07/17/2014 FINAL APPROVED DSPENCER
Note: THIS IS A REINSPECTION
U -UTILITY RESIDENTIAL FINAL 07/16/2014 Disapproved -FEE REQUIRED DSPENCER
Note: Inspection Resulted at 7/16/2014 2:38:55 PM SEWER CLEANOUT AT STREET TIE IN HAS WRONG CAP MUST BE FLUSH SLOTTED CAP AND AT GRADE
BLD - BUILDING FINAL 07/15/2014 FINAL APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
BLD - BUILDING FINAL 07/14/2014 Disapproved -FEE REQUIRED DROCKWELL
Note: Inspection Resulted at 7/14/2014 2:22:47 PM NO POWER TO OUTLET RIGHT SIDE WALL/SECURE OUTLET BEHIND SINK IN KITCHEN/ATTIC PULL CHAIN LIGHT NOT WORKING/DISCONNECT CANNOT BE LOCATED DIRECTLY BEHIND A/C COMPRESSOR
FINAL SURVEY (OFFICE USE ONLY) 07/10/2014 APPROVED JHINDMAN
FINAL APRON (AFTER POUR/DRIVEWAY) 07/01/2014 APPROVED GLALIMA
Note: THIS IS A REINSPECTION
ROW FINAL 07/01/2014 APPROVED GLALIMA
ELECTRIC - EARLY POWER 06/27/2014 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 6/27/2014 3:08:11 PM CALLED FPL TO RELEASE POWER,SPOKE WITH SUSAN
FINAL APRON (AFTER POUR/DRIVEWAY) 06/05/2014 Disapproved - NO FEE RGROSS
Note: Pavers need to be placed before final apron can be called in. Photo on file. Inspector had discussion with super who apparently wasn't clear on the after pour timing.
PRE-APRON (PRE-POUR/DRIVEWAY) 06/04/2014 CANCELLED BY APPLICANT AIRS WEB
PRE-APRON (PRE-POUR/DRIVEWAY) 06/04/2014 APPROVED RGROSS
LATH/BRICK/ WATER BARRIER 05/19/2014 APPROVED CMINI
ELECTRIC-TUG 05/06/2014 APPROVED DROCKWELL
GRAVITY SEWER TEST 04/30/2014 APPROVED DROCKWELL
INSULATION 04/07/2014 APPROVED CMINI
ALL ROUGH 04/03/2014 APPROVED DROCKWELL
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/20/2014 APPROVED DROCKWELL
U - SEWER TIE IN 12/11/2013 APPROVED DSPENCER
TIE BEAM / LINTEL 12/05/2013 APPROVED RMARVEL
FOUND SURVEY APPROVED (OFFICE) 12/04/2013 APPROVED JMCGOWEN
MONOLITHIC SLAB 11/18/2013 APPROVED CMINI
PLUMBING 1ST ROUGH UNDERGROUND 11/13/2013 APPROVED CMINI

Review History

Department Status Date In Date Out
SW1 COMPLETE 07/10/2014 07/10/2014
Note: Released By: JHINDMAN final survey
BLD COMPLETE 06/16/2014 06/16/2014
SW1 COMPLETE 06/16/2014 06/16/2014
ZON COMPLETE 06/16/2014 06/16/2014
ELEC COMPLETE 04/02/2014 04/02/2014
SW1 COMPLETE 12/04/2013 12/04/2013
Note: Released By: JMCGOWEN foundation survey
ZON COMPLETE 12/04/2013 12/04/2013
Note: Released By: JMCGOWEN foundation
ZON COMPLETE 09/27/2013 10/04/2013
ZON HOLD 09/17/2013 09/18/2013
Note: Provide correct flood panel information on boundary survey and site plan.
BLD COMPLETE 09/09/2013 09/09/2013
ELEC COMPLETE 09/09/2013 09/09/2013
ENGIN1 COMPLETE 09/09/2013 09/09/2013
Note: No swale plan required.
MECH COMPLETE 09/09/2013 09/09/2013
PLUM COMPLETE 09/09/2013 09/09/2013
SW1 COMPLETE 09/09/2013 09/09/2013
UD1 COMPLETE 09/09/2013 09/09/2013
Note: see comment in general notes Keith King 386-9318009
URB COMPLETE 09/09/2013 09/10/2013
ZON HOLD 09/09/2013 09/12/2013
Note: Revise color sheet to show wall, trim, and quoins to meet the LRV of 80 or greater for pastels. Provide correct flood panel information.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 07/17/2014
REVISION ¤40.00 07/17/2014
REVISION ¤40.00 07/17/2014
REINSPECTION FEE ¤40.00 07/17/2014
REINSPECTION FEE ¤40.00 07/17/2014
NEW RESIDENTIAL INSPECTIONS ¤430.00 10/11/2013
ADMIN FEE ¤20.00 10/11/2013
SITE PLAN 20 ¤20.00 10/11/2013
SURCHARGE FS 533.721 ¤16.55 10/11/2013
SURCHARGE - FS 468.631 ¤16.55 10/11/2013
STORM WATER PERMIT FEES ¤80.00 10/11/2013
3% TRANS IMPACT FEE CREDIT (¤90.51) 10/11/2013
ELECTRIC FEE ¤189.00 10/11/2013
3% FIRE IMPACT FEE CREDIT (¤6.24) 10/11/2013
IMPACT FEE FIRE NONRESIDENTIAL ¤207.99 10/11/2013
IMPACT FEE PARKS ¤1,343.98 10/11/2013
IMPACT FEE SCHOOL ¤3,600.00 10/11/2013
IMPACT FEE TRANSPORTATION ¤3,017.05 10/11/2013
MECHANICAL FEE ¤189.00 10/11/2013
3% PARKS IMPACT FEE CREDIT (¤40.32) 10/11/2013
PLAN CHECK FEE ¤86.00 10/11/2013
PLUMBING FEE ¤189.00 10/11/2013
Fees Total Due: ¤0.00 Total Paid: ¤9,468.05