I want to search for...
Permit #2013090120
Permit Details
Status: COED
| Parcel Id: 07-11-31-1090-000C0-0000 |
| Block: 000C0 |
| Subdivision: 1228 - SOUTHWEST QUADRANT |
| Job Phone: (386) 446-3615 |
| Location Address: 160 CYPRESS POINT PKWY |
| Type: CIA - COMMERCIAL INTERIOR EXTERIOR ALTERATION |
| Issue Date: 09/30/2013 |
| NOC: RECORDED |
| Applicant name: RICHARD W HAUSEN |
| Owner: BETHEA PROPERTIES LLC |
|
Address 4662 RIVER POINT RD W JACKSONVILLE, FL 32207 |
| Lot: 0000 |
| Contracted Stated Job Value: ¤185,000.00 |
| Job Description: C 113-117 -- CUE NOTE BILLIARD ROOM INTERIOR ALTERATIONS |
| Type: CN |
Contractor
HAUSEN PROPERTIES INC
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P. O. BOX 351868 Palm Coast, FL 32135 |
RG0029505 (Exp: 08/31/2025) | (386) 446-3615 | 386-446-3615 |
Sub Contractors
JOHN EDWARD GAMBONE
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
55 BARRISTER LN PALM COAST, FL 32137 |
ER13013466 (Exp: 08/31/2014) | 386-586-9144 | (386)246-6305 |
DEREK ALLEN MCLEAN
| Status | Location Address | State License Number | Phone |
| CANCEL |
2485 DOBBS RD SAINT AUGUSTINE, FL 32086 |
CAC1816010 (Exp: 08/31/2022) | 904-540-8199 |
THOMAS WALTER ALBANO
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P. O. BOX 352075 Palm Coast, FL 32135 |
CFC045991 (Exp: 08/31/2024) | 386-437-2795 | (386)437-2781 |
BOB BELL
| Status | Location Address | State License Number | Phone |
| CANCEL |
411 6TH STREET HOLLY HILL, FL 32117 |
01612 (Exp: 09/18/2014) | 386-252-5555 |
Inspection History
| Type | Request Date | Result | Inspector |
| ELECTRIC FINAL | 09/18/2015 | FINAL APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION | |||
| BUILDING FINAL | 09/18/2015 | FINAL APPROVED | CMINI |
| Note: THIS IS A REINSPECTION per contractor | |||
| BUILDING FINAL | 09/10/2015 | Disapproved -FEE REQUIRED | CMINI |
| Note: Inspection Resulted at 9/10/2015 10:22:00 AM HANDICAP ACCESSIBLE BATH ROOM STALLS NOT TO PLAN.. ALSO NEED REVISION FOR DELETED HANDSINK IN KITCHEN | |||
| FIRE FINAL | 09/08/2015 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION per contractor | |||
| ELECTRIC FINAL | 09/04/2015 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 9/4/2015 8:36:37 AM STILL LABELING IN PANELS NOT MATCHING APPROVED PANEL SCHEDULE, STILL NEED ARC SHIELDS OR PROTECTION IN OUTLET BOXES ON WALLS IN POOL TABEL AREA, COVER STILL NOT ON MAIN PANEL IN POOL TABLE AREA ......NEC 3OO | |||
| FIRE FINAL | 09/03/2015 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: Provide panic hardware on the rear pool room door. | |||
| U - UTILITY COMMERCIAL FINAL | 09/03/2015 | FINAL APPROVED | MBACON |
| U-GREASE INTERCEPTOR FLOW/DYE TESTED | 08/31/2015 | APPROVED | MBACON |
| Note: THIS IS A REINSPECTION | |||
| ABOVE CEILING | 08/26/2015 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| HVAC FINAL | 08/26/2015 | APPROVED | CMINI |
| PLUMBING FINAL | 08/24/2015 | APPROVED | CMINI |
| ELECTRIC FINAL | 08/24/2015 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: Inspection Resulted at 8/24/2015 9:59:08 AM NEED TO HAVE CORRECT LABELING ON PANELS AND NEED TO MATCH APPROVED PLAN PANEL SCHEDULES, ALSO MANY OUTLETS NEED ARC SHEILDS OR FIRE CAULK......NEC.314 | |||
| ELECTRIC 1ST ROUGH | 08/24/2015 | APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION | |||
| GAS FINAL | 08/24/2015 | APPROVED | CMINI |
| U-GREASE INTERCEPTOR FLOW/DYE TESTED | 08/24/2015 | APPROVED | MBACON |
| Note: Inspection Resulted at 8/24/2015 3:12:47 PM NEED TO DYE TEST | |||
| PROJECT STATUS (OFFICE USE) | 05/05/2015 | APPROVED - AS NOTED | JHINDMAN |
| Note: fire protection of steel beam inspected by affidavit. | |||
| INSULATION | 08/12/2014 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION per contractor | |||
| INSULATION | 08/08/2014 | Disapproved -FEE REQUIRED | CMINI |
| Note: Inspection Resulted at 8/8/2014 3:06:40 PM NO ACCESS TO UNIT,DOORS LOCKED,TRIED IN MORNING ON WAY OUT OF OFFICE AND ALSO IN AFTERNOON ON WAY IN TO OFFICE | |||
| FRAMING | 07/31/2014 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| ABOVE CEILING | 07/31/2014 | CANCELLED BY APPLICANT | CMINI |
| HVAC ROUGH | 07/31/2014 | APPROVED - AS NOTED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 7/31/2014 2:26:17 PM NEED TO ADD EXHAUST FAN IN BATH THAT WAS DELETED OR SUBMIT REVISION TO DELETE IT FROM PLANS,HAVE BY HVAC FINAL | |||
| ELECTRIC 2ND ROUGH | 07/31/2014 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 7/31/2014 3:11:32 PM SHOW REVISION FOR ADDED LIGHTS | |||
| GAS ROUGH | 07/16/2014 | APPROVED | RMARVEL |
| ELECTRIC 1ST ROUGH | 07/16/2014 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: Inspection Resulted at 7/16/2014 10:34:53 AM PROVIDE CITY STAMPED APPROVED PLANS GFOR INSPECTION. | |||
| HVAC ROUGH | 07/16/2014 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: Inspection Resulted at 7/16/2014 10:34:53 AM MATERIAL AND DUCT LO9CATIONS DO NO MATCH APPROVED PLANS. | |||
| FRAMING | 07/16/2014 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: THIS IS A REINSPECTION Inspection Resulted at 7/16/2014 10:34:54 AM MISSING ATTACHMENT SCREWS. MULTIPLE LOCATIONS. INSTALL BRACING AND END WALL/CORNER WALL CONNECTIONS TO APPROVED PLANS DETAILS. | |||
| LATH/BRICK/WATER BARRIER | 06/16/2014 | APPROVED - AS NOTED | CMINI |
| Note: PER CONTRACTOR Inspection Resulted at 6/16/2014 8:52:06 AM PER REVISION | |||
| PLUMBING 2ND ROUGH | 06/16/2014 | APPROVED - AS NOTED | CMINI |
| Note: per contractor/BATH ROOM PLUMBING Inspection Resulted at 6/16/2014 8:52:06 AM PER REVISION | |||
| FRAMING | 06/05/2014 | PARTIALLY APPROVED | CMINI |
| Note: doors /windows Inspection Resulted at 6/5/2014 2:30:56 PM EXTERIOR FRAMING | |||
| MONOLITHIC SLAB | 01/21/2014 | APPROVED | RMARVEL |
| PLUMBING 1ST ROUGH | 01/13/2014 | APPROVED - AS NOTED | RMARVEL |
| Note: Inspection Resulted at 1/13/2014 3:42:39 PM DWV HAS BEEN TESTED FOR 5FT OF HEAD PRESSURE AT 1ST ROUGH TO ABOVE FIXTURE PLACEMENT. |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 09/16/2015 | 09/17/2015 |
| BLD | HOLD | 09/14/2015 | 09/15/2015 |
| Note: 1. The revised elevation details for the grab bars does not match the toilet accessories chart for TA-4. J. Hindman 986-3784. | |||
| ELEC | COMPLETE | 09/01/2015 | 09/02/2015 |
| ELEC | HOLD | 08/26/2015 | 08/31/2015 |
| Note: 1. Provide electrical contractors name and license number on the drawings with the panel and wire sizes listed on the correction form. 5th. ed FBC 107.1 J. Hindman 986-3784. | |||
| BLD | COMPLETE | 01/12/2015 | 01/13/2015 |
| FI1 | COMPLETE | 01/12/2015 | 01/13/2015 |
| MECH | COMPLETE | 09/24/2014 | 09/30/2014 |
| MECH | HOLD | 08/13/2014 | 08/14/2014 |
| Note: provide revised floor plan removing dryer if exhaust vent is not being installed. Dryer on location must have exhaust vent. | |||
| ELEC | COMPLETE | 08/07/2014 | 08/07/2014 |
| MECH | HOLD | 08/07/2014 | 08/07/2014 |
| Note: Identify dryer exhaust system to comply with FMC504.1 | |||
| BLD | COMPLETE | 07/30/2014 | 07/30/2014 |
| ELEC | COMPLETE | 07/30/2014 | 07/30/2014 |
| BLD | HOLD | 07/25/2014 | 07/25/2014 |
| Note: Provide locations of changes by clouds or dated diamonds FBC 107.2.1 | |||
| ELEC | HOLD | 07/25/2014 | 07/25/2014 |
| Note: Provide locations of changes by clouds or dated diamonds FBC 107.2.1 | |||
| MECH | COMPLETE | 07/25/2014 | 07/25/2014 |
| PLUM | COMPLETE | 06/03/2014 | 06/03/2014 |
| Note: Revision- duplication-same revision on bathroom. | |||
| FI1 | COMPLETE | 05/28/2014 | 06/02/2014 |
| PLUM | COMPLETE | 05/28/2014 | 05/28/2014 |
| Note: Revision - changed bathroom facilities | |||
| DSD | COMPLETE | 05/28/2014 | 06/02/2014 |
| BLD | COMPLETE | 05/28/2014 | 05/29/2014 |
| DSD | HOLD | 05/13/2014 | 05/14/2014 |
| Note: 1. Please provide documents from the Condo Association, showing that the condo unit owner has been legally authorized to make the proposed changes to the exterior of the building. Typically, the Condo Association is the owner of the exterior of a condo building, thus they must approve of and authorize others to perform such work. | |||
| FI1 | HOLD | 05/13/2014 | 05/13/2014 |
| Note: 1. Provide a new floorplan that shows the reconfigured space. J. Hindman 986-3784. | |||
| PLUM | HOLD | 05/13/2014 | 05/13/2014 |
| Note: Revision calls for the removal of shower at office bathroom as the plan shows but the sanitary riser diagram still shows the shower. Coordinate and submit correction per 2010 FBC 107.2.1. Also, any the revision of sanitary riser diagram shall be signed by the engineer who originally designed the plumbing system for this job per FS 489. | |||
| BLD | HOLD | 05/12/2014 | 05/13/2014 |
| Note: 1. Revise floorplan to show the reconfigured bathroom changes. 2010 FBC 107.2.1. | |||
| FI1 | COMPLETE | 03/27/2014 | 03/28/2014 |
| ZON | COMPLETE | 03/27/2014 | 06/02/2014 |
| BLD | HOLD | 03/26/2014 | 03/27/2014 |
| Note: Show all door and window modifications and all elevations that are affected to include details of modified store fronts. FBC 107.2.1 | |||
| PLUM | COMPLETE | 01/10/2014 | 01/10/2014 |
| Note: Revision - changed sanitary/grease layout. | |||
| MECH | COMPLETE | 09/24/2013 | 09/24/2013 |
| FI1 | COMPLETE | 09/24/2013 | 09/24/2013 |
| BLD | COMPLETE | 09/24/2013 | 09/24/2013 |
| UD1 | COMPLETE | 09/24/2013 | 09/25/2013 |
| ELEC | COMPLETE | 09/24/2013 | 09/24/2013 |
| BLD | HOLD | 09/09/2013 | 09/09/2013 |
| Note: 1. provide panic hardware on the egress doors. 2010 FBC 1008.1.10. 2. Provide Florida product approval for the new exterior doors 2010 FBC 107.2.1. 3. Provide typical wall and soffit framing details that show how the walls and soffits are to be braced or attached to the structure. 2010 FBC 107.2.1. | |||
| ELEC | COMPLETE | 09/09/2013 | 09/09/2013 |
| FI1 | HOLD | 09/09/2013 | 09/09/2013 |
| Note: 1. Provide panic hardware on the egress doors.. 2. Provide a type K extinguisher in the kitchen. 3. (Note seperate permits will be required for the hood, fire sprinkler and fire alarm.) | |||
| MECH | HOLD | 09/09/2013 | 09/09/2013 |
| Note: 1. Kitchen exhaust hood shall be applied under separate permit per 2010 FBC 107.2.1. 2. Provide energy calculations per 2010 FBC 107.3.5. 3. Provide gas riser diagram and gas subcontractor per 2010 FBC 107.2.1. | |||
| PLUM | COMPLETE | 09/09/2013 | 09/09/2013 |
| SW1 | COMPLETE | 09/09/2013 | 09/09/2013 |
| UD1 | HOLD | 09/09/2013 | 09/10/2013 |
| Note: Provide completed DBPR form. Contact Utility Department to answer any questions (986-2355) | |||
| ZON | COMPLETE | 09/09/2013 | 09/12/2013 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 09/18/2015 |
| REVISION | ¤40.00 | 09/18/2015 |
| REINSPECTION FEE | ¤40.00 | 09/08/2015 |
| REINSPECTION FEE | ¤40.00 | 09/08/2015 |
| REINSPECTION FEE | ¤40.00 | 09/08/2015 |
| REVISION | ¤40.00 | 08/20/2015 |
| REVISION | ¤40.00 | 08/20/2015 |
| REVISION | ¤40.00 | 08/20/2015 |
| REVISION | ¤40.00 | 08/20/2015 |
| REVISION | ¤40.00 | 08/20/2015 |
| EXTENSION | ¤40.00 | 08/20/2015 |
| REINSPECTION FEE | ¤40.00 | 08/20/2015 |
| REINSPECTION FEE | ¤40.00 | 08/20/2015 |
| REINSPECTION FEE | ¤40.00 | 08/20/2015 |
| REINSPECTION FEE | ¤40.00 | 08/20/2015 |
| FIRE PLANS REVIEW | ¤25.00 | 09/30/2013 |
| MECHANICAL FEE | ¤171.00 | 09/30/2013 |
| PLAN CHECK FEE | ¤212.75 | 09/30/2013 |
| PLUMBING FEE | ¤171.00 | 09/30/2013 |
| SITE PLAN 20 | ¤20.00 | 09/30/2013 |
| SURCHARGE FS 533.721 | ¤31.21 | 09/30/2013 |
| SURCHARGE - FS 468.631 | ¤31.21 | 09/30/2013 |
| ADMIN COMMERCIAL | ¤60.00 | 09/30/2013 |
| INSPECTION - COMMERCIAL ADD | ¤1,295.00 | 09/30/2013 |
| ELECTRIC FEE | ¤171.00 | 09/30/2013 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤2,788.17 |