Status: COED
| Parcel Id: 15-11-31-2970-00000-1270 |
| CONDITIONED SPACE: 2532 sqft |
| GARAGE: 577 sqft |
| SCREEN PORCH (SOLID ROOF) : 491 sqft |
| OPENED PORCH (WITH ROOF) : 66 sqft |
| PATIO/DECK (NO ROOF) : 145 sqft |
| Total Square Footage: 3811 sqft |
| Block: 00000 |
| Subdivision: 2070 - Grand Haven North Phase 1 @ Grand Haven |
| Job Phone: 386-947-4481 |
| Location Address: 27 NORTH PARK CIR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/09/2013 |
| NOC: RECORDED |
| Applicant name: ERIC CHRISTOPHER OLSEN |
| Owner: CHECK, JOHN & MARGIE |
|
Address 99 LONGFELLOW DRIVE COLONIA, NJ 07067 |
| Lot: 1270 |
| Contracted Stated Job Value: ¤305,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
OLSEN CUSTOM HOMES AND CONSULTING INC
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 MAGNOLIA AVE DAYTONA BEACH, FL 32114 |
CGC1508852 (Exp: 08/31/2026) | 386-947-4481 | (386)947-4484 |
Sub Contractors
BENJAMIN EDWARD SMITH
| Status | Location Address | State License Number | Phone |
| CANCEL |
131 MAGNOLIA AVE DAYTONA BEACH, FL 32114 |
EC13004288 (Exp: 08/31/2016) | 386-265-2687 |
DANIEL P HUCKS
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
400 N. U.S. 1 Ormond Beach, FL 32174 |
CAC029376 (Exp: 08/31/2024) | 386-672-8494 | 386-673-7856 |
JOHN BRADLEY WINFREY JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1685 S. CLARA AVE Deland, FL 32720 |
CFC054901 (Exp: 08/31/2026) | 386-734-0154 | 386-734-2751 |
JACK DOUGLAS LANIER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
485 COMMERCE WAY LONGWOOD , FL 32750 |
CCC058022 (Exp: 08/31/2026) | (321)441-2300 | (321)441-2313 |
BOB BELL
| Status | Location Address | State License Number | Phone |
| CANCEL |
411 6TH STREET HOLLY HILL, FL 32117 |
01612 (Exp: 09/18/2014) | 386-252-5555 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 06/11/2014 | FINAL APPROVED | DSPENCER |
| BLD - BUILDING FINAL | 06/10/2014 | FINAL APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 06/10/2014 | APPROVED | RLEE |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB | 06/10/2014 | APPROVED | RLEE |
| Note: THIS IS A REINSPECTION | |||
| BLD - BUILDING FINAL | 06/06/2014 | Disapproved -FEE REQUIRED | CMINI |
| Note: Inspection Resulted at 6/6/2014 3:17:32 PM 1ST ROUGH PLUMBING AND MONO SLAB NEEDS VERIFICATION FROM UNIVERSAL FOR APPROVAL...VACUM BREAKER AT BACK PORCH SPICKET..WEATHER STRIPPING AT DOORS..NEED TO ADD SOD AT BACK OF PROPERTY TO STOP EROSION | |||
| U - SEWER TIE IN | 06/05/2014 | APPROVED | DSPENCER |
| Note: THIS IS A REINSPECTION | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 06/05/2014 | Disapproved -FEE REQUIRED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 6/5/2014 2:31:00 PM MISSED INSPECTION,NEED LETTER FROM UNIVERSAL | |||
| MONOLITHIC SLAB | 06/05/2014 | Disapproved -FEE REQUIRED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 6/5/2014 2:31:01 PM MISSED INSPECTION,NEED LETTER FROM UNIVERSAL | |||
| TIE BEAM / LINTEL | 06/05/2014 | APPROVED | DROCKWELL |
| Note: approved by Mike Navarra 12/30/13 | |||
| GRAVITY SEWER TEST | 06/05/2014 | APPROVED | CMINI |
| FINAL APRON (AFTER POUR/DRIVEWAY) | 06/04/2014 | APPROVED | RGROSS |
| ROW FINAL | 06/04/2014 | APPROVED | RGROSS |
| FINAL SURVEY (OFFICE USE ONLY) | 06/03/2014 | APPROVED | JHINDMAN |
| ELECTRIC - EARLY POWER | 05/14/2014 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 5/14/2014 3:35:25 PM CALLED FPL TO RELEASE POWER AT 300,SPOKE WITH SUSAN | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 04/17/2014 | APPROVED | GLALIMA |
| INSULATION | 03/31/2014 | APPROVED | CMINI |
| ALL ROUGH | 03/31/2014 | APPROVED | CMINI |
| INSULATION | 03/28/2014 | AUDIT - PRIVATE PROVIDER INSPECTION | CMINI |
| Note: Inspection Resulted at 3/28/2014 3:25:29 PM ALL ROUGH HAS NOT BEEN CALLED IN YET SHOWING OPEN ON PERMIT,NEED TO CALL IN WITH INSULATION AFTER ITEMS ARE CORRECTED..NEED TO FIRE BLOCK CHASE WALLS OPEN TO ATTIC...FBC 302.11TUB TRENCHS NEED TO BE SEALED APPENDIX F 303.3.4.2 approved by mike navarra | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/21/2014 | APPROVED - AS NOTED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 3/21/2014 3:31:50 PM ITEMS CORRECTED approved by Mike Navarra | |||
| FRAMING | 03/05/2014 | AUDIT - PRIVATE PROVIDER INSPECTION | CMINI |
| Note: Inspection Resulted at 3/5/2014 3:22:22 PM TRUSS REPAIR REVISIONS NEEDED,THREADED ROD DETAIL NEEDED.TIGHTEN THREADED RODS.ENGINEERING CALLING FOR SCAB BRACING.BEARING PONY WALL ABOVE FRONT ENTRY NEEDS TO HAVE DOUBLE TOP PLATES AND ANCHORED FOR CONTINUOUS LOAD PATH.NEED TO HAVE 5`` HEAD PRESSURE ON DWV FBC 312..NEED TO SEAL UNUSED OPENINGS NEC..110.12A..STRAPPING OF ROMEX NEEDS TO BE EVERY 4-1/2`` IN ATTIC CHECK ALL AREAS NEC.334.30..NAIL PLATES ON ELECTRIC NEED WHERE WIRE IS 1-1/4" FROM EDGE OF FRAMING MEMBERS AT DRILLED HOLES AND WHERE IT IS STRAPPED ON EDGE...NEC.300.4..FIREBLOCKING NEEDED FBC..603...WASTE ARM BROKEN AT MASTER..SUPPLY LINES KINCKED..EXHAUST FAN DUCT KINCKED IN MASTER.NOT READY | |||
| LATH/BRICK/ WATER BARRIER | 03/05/2014 | AUDIT - PRIVATE PROVIDER INSPECTION | CMINI |
| WALL SHEATHING | 02/04/2014 | APPROVED | DROCKWELL |
| Note: approved by Mike Navarra 2/4/14 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/04/2014 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Inspection Resulted at 2/4/2014 3:03:16 PM TRUSSES ON INTERIOR BEARING WALLS NOT ANCHORED/SAME WALL MISSING THREADED RODS/MANY TRUSSES NOT STRAPPED/3PLY GIRDER NOT ANCHORED AT ANY POINT/TRUSS ENGINEERING NOT DONE/ROOF METALS NOT INSTALLED-INCOMPLETE INSPECTION-NOT READY FOR INSPECTION.ROOF SHEATHING ONLY BY UNIVERSAL INSPECTOR AND APPROVED by Mike Navarra | |||
| ELECTRIC-TUG | 01/15/2014 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 1/15/2014 3:09:52 PM CALLED FPL TO RELEASE POWER AT,200,SPOKE WITH SUSAN approved by Dave Eversole | |||
| U - SEWER TIE IN | 01/10/2014 | Disapproved -FEE REQUIRED | DSPENCER |
| Note: THIS IS A REINSPECTION Inspection Resulted at 1/10/2014 12:19:04 PM NOT CONNECTED TO THE UTILITY DEPARTMENT STANDARDS | |||
| U - SEWER TIE IN | 12/31/2013 | Disapproved -FEE REQUIRED | DSPENCER |
| Note: THIS IS A REINSPECTION Inspection Resulted at 12/31/2013 2:11:56 PM COVERED CANNOT TELL IF TIED IN.GRAVITY SEWER, THE SEWER TIE-IN INSPECTION MUST BE CALLED IN THE DAY BEFORE THE TIE-IN. THE MORNING OF THE TIE-IN THE INSPECTOR MUST BE CONTACTED TO COORDINATE THE TIME OF THE TIE-IN SO HE CAN WITNESS THE TIE-IN. SEE COMMENT IN GENERAL NOTES DANNY SPENCER 386-569-9082 | |||
| U - SEWER TIE IN | 12/30/2013 | Disapproved -FEE REQUIRED | DSPENCER |
| Note: Inspection Resulted at 12/30/2013 2:06:36 PM CONNECTION BURIED AND NO CALL RECIEVED TO COORDINATE THE INSPECTION TIME. CANNOT TELL IN CONNECTED OR NOT. | |||
| FOUND SURVEY APPROVED (OFFICE) | 12/26/2013 | APPROVED | JMCGOWEN |
| PLUMBING 1ST ROUGH UNDERGROUND | 12/04/2013 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: THIS IS A REINSPECTION Inspection Resulted at 12/4/2013 3:55:40 PM PLUMBING HAS BEEN COVERED. UNABLE TO INSPECT. approved by Dave Eversole | |||
| MONOLITHIC SLAB | 12/04/2013 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: Inspection Resulted at 12/4/2013 3:55:41 PM OUTSTANDING INSPECTION. UNABLE TO INSPECT. approved by Mike Navarra | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 11/25/2013 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Inspection Resulted at 11/25/2013 3:06:58 PM RISER DIAGRAHAM DOES NOT MATCH AS-BUILT.SUMMER KITCHEN NOT ON RISER PLAN.SEWER CONNECTIONS ON OPPOSITE SIDE OF HOUSE. partial approval with no notes by Mike Navarra |
Review History
| Department | Status | Date In | Date Out |
| PLUM | COMPLETE | 06/11/2014 | 06/12/2014 |
| SW1 | COMPLETE | 06/03/2014 | 06/03/2014 |
| Note: Released By: JHINDMAN final s | |||
| BLD | COMPLETE | 03/17/2014 | 03/18/2014 |
| SW1 | COMPLETE | 12/26/2013 | 12/26/2013 |
| Note: Released By: JMCGOWEN FOUNDATION SURVEY | |||
| ZON | COMPLETE | 10/07/2013 | 10/07/2013 |
| ELEC | COMPLETE | 09/26/2013 | 09/27/2013 |
| PLUM | COMPLETE | 09/26/2013 | 09/26/2013 |
| ZON | HOLD | 09/26/2013 | 10/02/2013 |
| Note: Revise color and material sheet to show the trim meets the LRV of 30 or greater for earthtone colors. | |||
| BLD | COMPLETE | 09/18/2013 | 09/18/2013 |
| ELEC | HOLD | 09/18/2013 | 09/18/2013 |
| Note: Provide electric load calculations FBC 107.2.1 | |||
| ENGIN1 | COMPLETE | 09/18/2013 | 09/19/2013 |
| Note: No swale plan required. | |||
| MECH | COMPLETE | 09/18/2013 | 09/18/2013 |
| PLUM | HOLD | 09/18/2013 | 09/18/2013 |
| Note: Provide sanitary riser diagram either signed and sealed by FL design professional or a plumbing contractor with his name and license number indicated on plan/diagram per 2010 FBC 107.1. | |||
| SW1 | COMPLETE | 09/18/2013 | 09/18/2013 |
| UD1 | COMPLETE | 09/18/2013 | 09/18/2013 |
| Note: See comment in the general notes Keith King 386-9318009 | |||
| URB | COMPLETE | 09/18/2013 | 09/19/2013 |
| ZON | HOLD | 09/18/2013 | 09/24/2013 |
| Note: Revise color and material sheet to show the trim meets the LRV of 30 or greater for earthtone colors. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 06/09/2014 |
| REINSPECTION FEE | ¤40.00 | 06/09/2014 |
| REINSPECTION FEE | ¤40.00 | 06/09/2014 |
| REINSPECTION FEE | ¤40.00 | 06/09/2014 |
| REINSPECTION FEE | ¤40.00 | 06/09/2014 |
| REINSPECTION FEE | ¤40.00 | 06/09/2014 |
| REINSPECTION FEE | ¤40.00 | 06/09/2014 |
| REINSPECTION FEE | ¤40.00 | 06/09/2014 |
| REINSPECTION FEE | ¤40.00 | 06/09/2014 |
| REINSPECTION FEE | ¤40.00 | 06/09/2014 |
| REVISION | ¤40.00 | 06/09/2014 |
| SITE PLAN 20 | ¤20.00 | 10/09/2013 |
| SURCHARGE FS 533.721 | ¤23.16 | 10/09/2013 |
| SURCHARGE - FS 468.631 | ¤23.16 | 10/09/2013 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/09/2013 |
| 3% TRANS IMPACT FEE CREDIT | (¤90.51) | 10/09/2013 |
| NEW RESIDENTIAL INSPECTIONS | ¤640.00 | 10/09/2013 |
| ADMIN FEE | ¤20.00 | 10/09/2013 |
| ELECTRIC FEE | ¤252.00 | 10/09/2013 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.24) | 10/09/2013 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤207.99 | 10/09/2013 |
| IMPACT FEE PARKS | ¤1,343.98 | 10/09/2013 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/09/2013 |
| IMPACT FEE TRANSPORTATION | ¤3,017.05 | 10/09/2013 |
| MECHANICAL FEE | ¤252.00 | 10/09/2013 |
| 3% PARKS IMPACT FEE CREDIT | (¤40.32) | 10/09/2013 |
| PLAN CHECK FEE | ¤128.00 | 10/09/2013 |
| PLUMBING FEE | ¤252.00 | 10/09/2013 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤10,162.27 |