I want to search for...
Permit #2013100702
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7003-00190-0020 |
| ENCLOSE EXISTING PORCH TO LIVING : 72 sqft |
| Total Square Footage: 72 sqft |
| Block: 00190 |
| Subdivision: 2190 - SECTION 3-COUNTRY CLUB COVE |
| Job Phone: (386)547-9834 |
| Location Address: 4 CASTLE CT |
| Type: BA - BUILDING ADDITION |
| Issue Date: 11/05/2013 |
| NOC: RECORDED |
| Applicant name: RAMON MICHAEL GIACCONE |
| Owner: ZOBLER, JOHN & DONNA |
|
Address 4 CASTLE COURT PALM COAST, FL 32137 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤9,500.00 |
| Job Description: ADDITION FOR KITCHENETTE |
| Type: CN |
Contractor
VERITAS CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
13 SMITH TRAIL PALM COAST, FL 32164 |
CBC1251714 (Exp: 08/31/2026) | (386)547-9834 | (386)437-2016 |
Sub Contractors
MARK E SMITH
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 351482 PALM COAST, FL 32164 |
EC0002128 (Exp: 08/31/2026) | (386) 437-8496 | 386-586-3612 |
JOHN ROBERT BLEVINS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
17 PORWYN LANE PALM COAST, FL 32164 |
CAC1816125 (Exp: 08/31/2026) | 386-585-8283 | 386-263-2096 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1351 HAZELNUT ST BUNNELL, FL 32110 |
CFC1427527 (Exp: 08/31/2026) | 386-445-2532 | 386-445-5575 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 07/17/2014 | FINAL APPROVED | DSPENCER |
| Note: THIS IS A REINSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | 07/16/2014 | PARTIALLY APPROVED | DSPENCER |
| Note: per contractor | |||
| BLD - BUILDING FINAL | 04/22/2014 | FINAL APPROVED | CMINI |
| INSULATION | 02/21/2014 | APPROVED | CMINI |
| LATH/BRICK/ WATER BARRIER | 02/18/2014 | APPROVED | CMINI |
| Note: per contractor | |||
| ALL ROUGH | 02/18/2014 | APPROVED | CMINI |
| WALL SHEATHING | 02/12/2014 | APPROVED | CMINI |
| Note: per contractor | |||
| FOUND SURVEY APPROVED (OFFICE) | 12/12/2013 | APPROVED | JMCGOWEN |
| MONOLITHIC SLAB | 11/27/2013 | APPROVED | DROCKWELL |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/20/2013 | APPROVED | CMINI |
| Note: REQUESTED BY CONTRACTOR |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 12/12/2013 | 12/12/2013 |
| Note: Released By: JMCGOWEN foundation s | |||
| MECH | COMPLETE | 11/04/2013 | 11/04/2013 |
| BLD | COMPLETE | 10/23/2013 | 10/24/2013 |
| ELEC | COMPLETE | 10/23/2013 | 10/24/2013 |
| MECH | HOLD | 10/23/2013 | 10/24/2013 |
| Note: 1. Provide hvac plan either prepared by design professional with seal and signature or an hvac contractor with license number and signature per 2010 FBC 107.3.4.3. 2. Conditioned floor area shown on energy calculations shows 270 SF but floor plan shows 72 SF. Clarify to comply with 2010 FBC 107.2.1. | |||
| PLUM | COMPLETE | 10/23/2013 | 10/24/2013 |
| SW1 | COMPLETE | 10/23/2013 | 10/24/2013 |
| ZON | COMPLETE | 10/23/2013 | 10/30/2013 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMIN FEE | ¤20.00 | 11/05/2013 |
| ELECTRIC FEE | ¤66.00 | 11/05/2013 |
| MECHANICAL FEE | ¤66.00 | 11/05/2013 |
| PLAN CHECK FEE | ¤40.00 | 11/05/2013 |
| PLUMBING FEE | ¤66.00 | 11/05/2013 |
| REMODEL/ADDITION/ACCES INSPECT | ¤40.00 | 11/05/2013 |
| SITE PLAN 20 | ¤20.00 | 11/05/2013 |
| SURCHARGE FS 533.721 | ¤4.47 | 11/05/2013 |
| SURCHARGE - FS 468.631 | ¤4.47 | 11/05/2013 |
| STORM WATER PERMIT FEES | ¤80.00 | 11/05/2013 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤406.94 |