Permit #2013110222
Permit Details
Status: COED
| Parcel Id: 16-11-31-1260-00000-0320 |
| CONDITIONED SPACE: 2040 sqft |
| GARAGE: 426 sqft |
| OPENED PORCH (WITH ROOF) : 191 sqft |
| PATIO/DECK (NO ROOF) : 70 sqft |
| Total Square Footage: 2727 sqft |
| Block: 00000 |
| Subdivision: 2081 - Creekside Village at Grand Haven |
| Job Phone: 386-947-4481 |
| Location Address: 45 CREEKSIDE DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/26/2013 |
| NOC: RECORDED |
| Applicant name: ERIC CHRISTOPHER OLSEN |
| Owner: MIKITA JOSEPH E & VICTORIA H&W |
|
Address 14 PINE HARBOR DR PALM COAST, FL 32137 |
| Lot: 0320 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
OLSEN CUSTOM HOMES AND CONSULTING INC
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 MAGNOLIA AVE DAYTONA BEACH, FL 32114 |
CGC1508852 (Exp: 08/31/2026) | 386-947-4481 | (386)947-4484 |
Sub Contractors
BENJAMIN EDWARD SMITH
| Status | Location Address | State License Number | Phone |
| CANCEL |
131 MAGNOLIA AVE DAYTONA BEACH, FL 32114 |
EC13004288 (Exp: 08/31/2016) | 386-265-2687 |
DANIEL P HUCKS
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
400 N. U.S. 1 Ormond Beach, FL 32174 |
CAC029376 (Exp: 08/31/2024) | 386-672-8494 | 386-673-7856 |
JOHN BRADLEY WINFREY JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1685 S. CLARA AVE Deland, FL 32720 |
CFC054901 (Exp: 08/31/2026) | 386-734-0154 | 386-734-2751 |
JACK DOUGLAS LANIER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
485 COMMERCE WAY LONGWOOD , FL 32750 |
CCC058022 (Exp: 08/31/2026) | (321)441-2300 | (321)441-2313 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 06/06/2014 | FINAL APPROVED | DSPENCER |
| U - SEWER TIE IN | 06/05/2014 | APPROVED | DSPENCER |
| Note: THIS IS A REINSPECTION | |||
| BLD - BUILDING FINAL | 06/05/2014 | FINAL APPROVED | CMINI |
| Note: aproved by Mike Navarra | |||
| BLD - BUILDING FINAL | 06/04/2014 | Disapproved -FEE REQUIRED | CMINI |
| Note: Inspection Resulted at 6/4/2014 3:21:37 PM DISCONNECTING MEANS WITH IN SIGHT OF AND READILY ACCESSIBLE ..NEC 440.14....ALL OPEN ROOF VENTS WHICH EXTEND THROUGH A ROOF SHALL BE TERMINATED AT 6" ABOVE THE ROOF..FBC P3103.1 | |||
| FINAL APRON (AFTER POUR/DRIVEWAY) | 06/04/2014 | APPROVED | RGROSS |
| ROW FINAL | 06/04/2014 | APPROVED | RGROSS |
| U - SEWER TIE IN | 06/04/2014 | Disapproved -FEE REQUIRED | DSPENCER |
| Note: THIS IS A REINSPECTION Inspection Resulted at 6/4/2014 11:40:18 AM CONNECTED BURIED MUST BE UNCOVERED AND INSPEDCTED FROM 6" X4" REDUCER TO TOP 45 BEND CALL FOR VISUAL INSPECTION | |||
| FINAL SURVEY (OFFICE USE ONLY) | 06/03/2014 | APPROVED | FREODICA |
| PRE-APRON (PRE-POUR/DRIVEWAY) | 05/12/2014 | APPROVED | GLALIMA |
| Note: 2 PART POUR READY FOR PAVERS | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 04/25/2014 | PARTIALLY APPROVED | GLALIMA |
| ELECTRIC - EARLY POWER | 04/25/2014 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 4/25/2014 3:56:37 PM ALLREADY APPROVED YESTURDAY | |||
| ELECTRIC - EARLY POWER | 04/24/2014 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 4/24/2014 3:03:37 PM CALLED FPL TO RELEASE POWER AT 2:00,SPOKE WITH SUSAN | |||
| GRAVITY SEWER TEST | 04/16/2014 | AUDIT - PRIVATE PROVIDER INSPECTION | CMINI |
| Note: Inspection Resulted at 4/16/2014 3:17:08 PM OK | |||
| LATH/BRICK/ WATER BARRIER | 03/25/2014 | AUDIT - PRIVATE PROVIDER INSPECTION | CMINI |
| Note: Inspection Resulted at 3/25/2014 3:20:22 PM OK approved by Robert Waldrop | |||
| INSULATION | 03/19/2014 | APPROVED | CMINI |
| Note: approved by Mike Navarra | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/18/2014 | APPROVED - AS NOTED | CMINI |
| Note: THIS IS A REINSPECTION..corrections made approved by Mike Navarra | |||
| ALL ROUGH | 03/18/2014 | APPROVED - AS NOTED | CMINI |
| Note: 5' head needed pressure..strap dryer vent every 4'..add required recptacle in hall way ..ground metal enclosure .. approved by Mike Navarra | |||
| FRAMING | 03/18/2014 | AUDIT - PRIVATE PROVIDER INSPECTION | CMINI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/18/2014 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Inspection Resulted at 2/18/2014 2:56:49 PM ROOF METALS NOT INSTALLED AS REQUIRED/PROVIDE SOLID BLOCKING AT HIP-PLYWOOD CANNOT EXCEED 24IN W/GRAIN/REMOVE SHINNERS SAME AREA/MISSING STRAP ON GIRDER G1G/TRUSS H5C NOT STRAPPED AT BEARING POINT/GABLE END NOT BRACED-PROVIDE APPROVED DETAIL NOT IN PLAN/INTERIOR BEARING WALL SHOWS 2X10 HEADERS-NOT 2X8/SAME HEADERS NOT STRAPPED PER PLAN DETAIL/TRUSS ENGINEERING NOT ON SITE/INCOMPLETE INSPECTION. roof sheathing approved by Mike Navarra | |||
| ELECTRIC-TUG | 02/12/2014 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 2/12/2014 3:06:10 PM CALLED FPL TO RELEASE POWER AT 1:15 PM,SPOKE WITH KAREN | |||
| TIE BEAM / LINTEL | 02/04/2014 | AUDIT - PRIVATE PROVIDER INSPECTION | DROCKWELL |
| Note: Inspection Resulted at 2/4/2014 3:03:14 PM APPROVED LINTEL INSPECTION approved by Mike Navarra | |||
| FOUND SURVEY APPROVED (OFFICE) | 01/29/2014 | APPROVED | FREODICA |
| MONOLITHIC SLAB | 01/23/2014 | APPROVED - AS NOTED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 1/23/2014 3:01:45 PM CORRECTIONS MADE | |||
| MONOLITHIC SLAB | 01/21/2014 | Disapproved -FEE REQUIRED | CMINI |
| Note: Inspection Resulted at 1/21/2014 1:30:02 PM PLAN SHOWS BELL FOOTERS ON DETAIL (B) AND (H). NEEDS CORRECTION..MISSING UFER..NEC..250.52(3)...RELIEVING ARCH IN FOOTING NEEDED OVER PIPES. P2603.5 approved by Robert Waldrop BN 4320 on 1/20/14 | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 01/15/2014 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 01/14/2014 | Disapproved -FEE REQUIRED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 1/14/2014 2:47:22 PM PROVIDE 5FT HEAD PRESSURE ON SANITARY.FBC 312 | |||
| U - SEWER TIE IN | 01/10/2014 | PARTIALLY APPROVED | DSPENCER |
| Note: THIS IS A REINSPECTION Inspection Resulted at 1/10/2014 10:49:03 AM BOTTOM IS CONNECTED CORRECTLY TOP IS NOT COMPLETED RECALL INSPECTION WHEN COMPLETED FOR APPROVAL OF TIE IN INSPECTION | |||
| U - SEWER TIE IN | 12/31/2013 | Disapproved -FEE REQUIRED | DSPENCER |
| Note: THIS IS A REINSPECTION Inspection Resulted at 12/31/2013 2:11:55 PM NOT TIED IN.GRAVITY SEWER, THE SEWER TIE-IN INSPECTION MUST BE CALLED IN THE DAY BEFORE THE TIE-IN. THE MORNING OF THE TIE-IN THE INSPECTOR MUST BE CONTACTED TO COORDINATE THE TIME OF THE TIE-IN SO HE CAN WITNESS THE TIE-IN. SEE COMMENT IN GENERAL NOTES DANNY SPENCER 386-569-9082 | |||
| U - SEWER TIE IN | 12/30/2013 | Disapproved -FEE REQUIRED | DSPENCER |
| Note: Inspection Resulted at 12/30/2013 2:06:37 PM CONNECTION HAS NOT BEEN MADE. CALL IN PERMIT CODE FOR INSPECTION THE DAY BEFORE WORK IS SCHEDULED TO BE DONE AND ON THE DAY WORK IS BEING DONE COORDINATE IN THE AM.WITH THE UTILITIES FOR A TIME TO BE INSPECTED AT 386-569-9082 | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 12/27/2013 | Disapproved - NO FEE | RMARVEL |
| Note: Inspection Resulted at 12/27/2013 2:28:02 PM PLUMBING RISER DOES NOT MATCH CITY STAMPED APPROVED PLANS. PROVIDE 5FT HEAD PRESSURE ON SANITARY. approved by Mike Navarra report on file |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 06/06/2014 | 06/06/2014 |
| Note: Engineer's letter from Universal Engineering Sciences dated 6-5-2014 re. final inspection of the project. | |||
| SW1 | COMPLETE | 06/03/2014 | 06/03/2014 |
| Note: Released By: FREODICA final s | |||
| SW1 | COMPLETE | 01/29/2014 | 01/29/2014 |
| Note: Released By: FREODICA foundation survey | |||
| ZON | COMPLETE | 01/08/2014 | 01/09/2014 |
| PLUM | COMPLETE | 01/08/2014 | 01/08/2014 |
| Note: NA | |||
| BLD | COMPLETE | 12/26/2013 | 12/27/2013 |
| SW1 | COMPLETE | 12/26/2013 | 12/27/2013 |
| ZON | HOLD | 12/26/2013 | 12/27/2013 |
| Note: revise site plan to show patio addition and correct house floor plan | |||
| MECH | COMPLETE | 11/25/2013 | 11/26/2013 |
| ZON | COMPLETE | 11/25/2013 | 11/26/2013 |
| BLD | COMPLETE | 11/12/2013 | 11/14/2013 |
| ELEC | COMPLETE | 11/12/2013 | 11/12/2013 |
| ENGIN1 | COMPLETE | 11/12/2013 | 11/13/2013 |
| Note: No swale plan required. | |||
| MECH | HOLD | 11/12/2013 | 11/12/2013 |
| Note: 1. Directional orientation of the building shown on energy calculation does not match with the orientation shown on site plan. Coordinate and revise to complty with 2010 FBC 107.2.1. 2. Florida room is classified as habitable space and requires heating and/or cooling per 2010 FBC R 301.2.1.1.2. Revise hvac plan to include that space to be ventilated. | |||
| PLUM | COMPLETE | 11/12/2013 | 11/12/2013 |
| SW1 | COMPLETE | 11/12/2013 | 11/12/2013 |
| UD1 | COMPLETE | 11/12/2013 | 11/12/2013 |
| Note: See comments in the general notes Keith King 386-9318009 | |||
| URB | COMPLETE | 11/12/2013 | 11/13/2013 |
| ZON | COMPLETE | 11/12/2013 | 11/15/2013 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 06/06/2014 |
| REINSPECTION FEE | ¤40.00 | 06/06/2014 |
| REINSPECTION FEE | ¤40.00 | 06/06/2014 |
| REINSPECTION FEE | ¤40.00 | 06/06/2014 |
| REINSPECTION FEE | ¤40.00 | 06/06/2014 |
| REINSPECTION FEE | ¤40.00 | 06/06/2014 |
| REINSPECTION FEE | ¤40.00 | 06/06/2014 |
| NEW RESIDENTIAL INSPECTIONS | ¤508.00 | 11/26/2013 |
| SITE PLAN 20 | ¤20.00 | 11/26/2013 |
| SURCHARGE FS 533.721 | ¤19.00 | 11/26/2013 |
| SURCHARGE - FS 468.631 | ¤19.00 | 11/26/2013 |
| STORM WATER PERMIT FEES | ¤80.00 | 11/26/2013 |
| 3% TRANS IMPACT FEE CREDIT | (¤90.51) | 11/26/2013 |
| ADMIN FEE | ¤20.00 | 11/26/2013 |
| ELECTRIC FEE | ¤212.40 | 11/26/2013 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.24) | 11/26/2013 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤207.99 | 11/26/2013 |
| IMPACT FEE PARKS | ¤1,343.98 | 11/26/2013 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 11/26/2013 |
| IMPACT FEE TRANSPORTATION | ¤3,017.05 | 11/26/2013 |
| MECHANICAL FEE | ¤212.40 | 11/26/2013 |
| 3% PARKS IMPACT FEE CREDIT | (¤40.32) | 11/26/2013 |
| PLAN CHECK FEE | ¤101.60 | 11/26/2013 |
| PLUMBING FEE | ¤212.40 | 11/26/2013 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,716.75 |