Permit #2013120440

Permit Details

Status: COED

Parcel Id: 42-10-30-0000-01020-0000
CONDITIONED SPACE: 2535 sqft
GARAGE: 496 sqft
OPENED PORCH (WITH ROOF) : 362 sqft
PATIO/DECK (NO ROOF) : 72 sqft
Total Square Footage: 3465 sqft
Block: 01010
Subdivision: 2094 - Conservatory at Hammock Beach
Job Phone: (386)383-0376
Location Address: 627 MAHOGANY RUN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/30/2014
NOC: RECORDED
Applicant name: ANTHONY CRAIG GUCCIONE
Owner: QUINONES, JAMES & MERCEDES

Address

627 MAHOGANY RUN

PALM COAST, FL 32137

Lot: 30
Contracted Stated Job Value: ¤290,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

GOLD COAST HOME BUILDERS INC
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 354707

PALM COAST, FL 32137

CGC1507791 (Exp: 08/31/2026) 386-313-6221

Sub Contractors

BENJAMIN EDWARD SMITH
Status Location Address State License Number Phone
CANCEL

131 MAGNOLIA AVE

DAYTONA BEACH, FL 32114

EC13004288 (Exp: 08/31/2016) 386-265-2687
PAUL S AIELLO
Status Location Address State License Number Phone Fax
CANCEL

PO BOX 351926

PALM COAST, FL 32137

CAC1815808 (Exp: 08/31/2016) (386)239-0053 (386)323-1955
JACK DOUGLAS LANIER
Status Location Address State License Number Phone Fax
ACTIVE

485 COMMERCE WAY

LONGWOOD , FL 32750

CCC058022 (Exp: 08/31/2026) (321)441-2300 (321)441-2313
JOHN BRADLEY WINFREY JR
Status Location Address State License Number Phone Fax
ACTIVE

1685 S. CLARA AVE

Deland, FL 32720

CFC054901 (Exp: 08/31/2026) 386-734-0154 386-734-2751

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 12/16/2014 FINAL APPROVED MKRONENBERG
BLD - BUILDING FINAL 12/12/2014 FINAL APPROVED CMINI
Note: THIS IS A REINSPECTION
BLD - BUILDING FINAL 12/11/2014 Disapproved -FEE REQUIRED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 12/11/2014 12:51:11 PM NEED STAMPED FINAL SURVEY ON SITE AT INSPECTION.....HOUSE NUMBER NEEDS TO BE ON RESIDENCE....SOFFIT VENTS MUST BE SOLID 3`` EACH WAY WHERE VENT PASSES THROUGH...INTERSYSTEM BONDING TERMINATION NEEDED 250.94
BLD - BUILDING FINAL 12/09/2014 Disapproved -FEE REQUIRED JCOLASANTI
Note: Inspection Resulted at 12/9/2014 3:19:17 PM NEED STAMPED FINAL SURVEY ON SITE AT INSPECTION.....HOUSE NEEDS TO BE COMPLETLY PAINTED AT FINAL INSPECTION.....HOUSE NUMBER NEEDS TO BE ON RESIDENCE....SOFFIT VENTS MUST BE SOLID 3`` EACH WAY WHERE VENT PASSES THROUGH.
FINAL APRON (AFTER POUR/DRIVEWAY) 12/03/2014 APPROVED GLALIMA
Note: THIS IS A REINSPECTION
ROW FINAL 12/03/2014 APPROVED GLALIMA
U - SEWER TIE IN 11/25/2014 APPROVED DSPENCER
Note: THIS IS A REINSPECTION
U - SEWER TIE IN 11/24/2014 CANCELLED BY APPLICANT DSPENCER
FINAL SURVEY (OFFICE USE ONLY) 11/21/2014 APPROVED JHINDMAN
FINAL APRON (AFTER POUR/DRIVEWAY) 11/20/2014 CANCELLED BY APPLICANT GLALIMA
Note: CALLED BUILDING AND GARY
PRE-APRON (PRE-POUR/DRIVEWAY) 11/18/2014 APPROVED - AS NOTED GLALIMA
Note: THIS IS A REINSPECTION CALLED BUILDER . IF PERMIT PACKAGE AND SURVEY IS NOT IN PERMIT BOX IT WILL BE A FAIL WITH A FEE .
PRE-APRON (PRE-POUR/DRIVEWAY) 11/14/2014 PARTIALLY APPROVED GLALIMA
Note: THIS IS A REINSPECTION WORKING ON NEW SURVEY
PRE-APRON (PRE-POUR/DRIVEWAY) 11/13/2014 Disapproved -FEE REQUIRED GLALIMA
Note: PER CONTRACTOR SURVEY / DRIVEWAY DETAIL IS SHOWING '' CONCRETE '' NOT '' PAVERS. I CALLED ZONING FEE IS ADDED BECAUSE FRIST INSPECTION THE SURVER DID SHOW CONCRETE AND NO REVISION IN PLACE
ELECTRIC - EARLY POWER 09/17/2014 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 9/17/2014 3:10:57 PM CALLED FPL TO RELEASE POWER,SPOKE WITH SUSAN
LATH/BRICK/ WATER BARRIER 07/21/2014 APPROVED CMINI
INSULATION 07/16/2014 APPROVED CMINI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/10/2014 APPROVED CMINI
Note: THIS IS A REINSPECTION
ALL ROUGH 07/10/2014 APPROVED CMINI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/27/2014 Disapproved -FEE REQUIRED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 6/27/2014 3:08:15 PM MULTIPLE STRAPPING ISSUES ANCHOR BOLTS NEED TO BE 24" O.C... TOWER CALLING FOR H10 ,H2.5 INSTALLED,INCOMPLETE INSPECTION
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/27/2014 Disapproved -FEE REQUIRED CMINI
Note: Inspection Resulted at 5/27/2014 3:38:34 PM NOT READY FOR INSPECTION
TIE BEAM / LINTEL 04/07/2014 APPROVED RMARVEL
ELECTRIC-TUG 04/02/2014 APPROVED RMARVEL
Note: Inspection Resulted at 4/2/2014 3:48:34 PM CALLEDFPL AT 1:20
FOUND SURVEY APPROVED (OFFICE) 04/02/2014 APPROVED JMCGOWEN
MONOLITHIC SLAB 03/06/2014 APPROVED CMINI
PLUMBING 1ST ROUGH UNDERGROUND 03/04/2014 APPROVED RMARVEL
Note: THIS IS A REINSPECTION
GRAVITY SEWER TEST 03/03/2014 APPROVED RMARVEL
PLUMBING 1ST ROUGH UNDERGROUND 03/03/2014 Disapproved -FEE REQUIRED RMARVEL
Note: Inspection Resulted at 3/3/2014 2:47:21 PM PROVIDE 5FT OF HEAD PRESSURE ON DWV. TEST ON DWV AND WATER PIPPING FPC .312

Review History

Department Status Date In Date Out
BLD COMPLETE 12/04/2014 12/08/2014
SW1 COMPLETE 11/21/2014 11/21/2014
Note: Released By: JHINDMAN
BLD COMPLETE 11/13/2014 11/14/2014
ENGIN1 COMPLETE 11/13/2014 11/13/2014
Note: No swale plan required.
ZON COMPLETE 11/13/2014 11/13/2014
BLD COMPLETE 06/24/2014 06/24/2014
SW1 COMPLETE 04/01/2014 04/02/2014
Note: Released By: JMCGOWEN foundation suvey
ELEC COMPLETE 01/23/2014 01/23/2014
URB COMPLETE 01/23/2014 01/23/2014
ELEC HOLD 01/16/2014 01/17/2014
Note: Locate receptacles to meet NEC 210.52
PLUM COMPLETE 01/16/2014 01/17/2014
BLD COMPLETE 01/16/2014 01/17/2014
URB HOLD 01/16/2014 01/21/2014
Note: Type of sod not indicated.
MECH COMPLETE 01/16/2014 01/17/2014
BLD HOLD 12/18/2013 12/18/2013
Note: 1.Provide a garage/house seperation door that complies with 2010 FBC R302.5. 2. Coordinate the plans with the energy calculations. The plans call for an unvented attic but the energy calculations are for a vented attic. If the attic is unvented provide the provide the product approval with ignition barrier for the spray foam. 2010 FBC 107.2.1. 3. Provide the Florida product approval installation instructions for the windows, overhead garage door, exterior doors and roofing. 2010 FBC 107.2.1.
ELEC HOLD 12/18/2013 12/18/2013
Note: Locate receptacles to meet NEC 210.52 provide electric load calculation FBC 107.2.1
ENGIN1 COMPLETE 12/18/2013 12/18/2013
Note: No swale plan required.
MECH COMPLETE 12/18/2013 12/18/2013
PLUM HOLD 12/18/2013 12/18/2013
Note: Provide plumbing shop drawings with plumbers license number and qualifier’s name
SW1 COMPLETE 12/18/2013 12/18/2013
UD1 COMPLETE 12/18/2013 12/18/2013
Note: See comments in the general notes Keith King 386-9318009
URB HOLD 12/18/2013 12/20/2013
Note: Need the type of sod being installed.
ZON COMPLETE 12/18/2013 12/20/2013

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 12/17/2014
REINSPECTION FEE ¤40.00 12/17/2014
REINSPECTION FEE ¤40.00 12/17/2014
REINSPECTION FEE ¤40.00 12/17/2014
REINSPECTION FEE ¤40.00 12/17/2014
REINSPECTION FEE ¤40.00 12/17/2014
REVISION ¤40.00 12/17/2014
REVISION ¤40.00 12/17/2014
ADDITIONAL FEE ¤40.00 02/28/2014
ADMIN FEE ¤20.00 01/30/2014
ELECTRIC FEE ¤251.40 01/30/2014
3% FIRE IMPACT FEE CREDIT (¤6.24) 01/30/2014
IMPACT FEE FIRE NONRESIDENTIAL ¤207.99 01/30/2014
IMPACT FEE PARKS ¤1,343.98 01/30/2014
IMPACT FEE SCHOOL ¤3,600.00 01/30/2014
IMPACT FEE TRANSPORTATION ¤3,017.05 01/30/2014
MECHANICAL FEE ¤251.40 01/30/2014
3% PARKS IMPACT FEE CREDIT (¤40.32) 01/30/2014
PLAN CHECK FEE ¤127.60 01/30/2014
PLUMBING FEE ¤251.40 01/30/2014
SITE PLAN 20 ¤20.00 01/30/2014
SURCHARGE FS 533.721 ¤23.10 01/30/2014
SURCHARGE - FS 468.631 ¤23.10 01/30/2014
STORM WATER PERMIT FEES ¤80.00 01/30/2014
3% TRANS IMPACT FEE CREDIT (¤90.51) 01/30/2014
NEW RESIDENTIAL INSPECTIONS ¤638.00 01/30/2014
Fees Total Due: ¤0.00 Total Paid: ¤10,077.95