Permit #2014010409
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7020-00090-0280 |
| PATIO/DECK (NO ROOF) : 192 sqft |
| Total Square Footage: 192 sqft |
| Block: 00090 |
| Subdivision: 2182 - SECTION 20-WYNNFIELD |
| Job Phone: 386-446-0265 |
| Location Address: 116 WELLINGTON DR |
| Type: DR - DRIVEWAY |
| Issue Date: 01/29/2014 |
| NOC: RECORDED |
| Applicant name: CHRISTOPHER SCALCIONE |
| Owner: RAQUEPAU, ALDEN & MARY |
|
Address 30619 PEBBLESTONE COURT BEVERLY HILLS, MO 48025 |
| Lot: 0280 |
| Contracted Stated Job Value: ¤20,000.00 |
| Job Description: 2FT PAVERS ADD. ON SIDE OF DRIVEWAY & 16 X 12 FRONT PAVER PATIO, LANDSCAPE WALLS & 4000 SQ FT OF SOD |
| Type: CN |
Contractor
SERENE SETTINGS INC
| Status | Location Address | Phone | Fax |
| CANCEL |
5 LAKE PL PALM COAST, FL 32137 |
386-446-0265 | 386-446-0265 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 02/25/2014 | FINAL APPROVED | DSPENCER |
| ROW DAMAGE | 02/25/2014 | APPROVED | RGROSS |
| STORMWATER FINAL | 02/25/2014 | APPROVED | RMARVEL |
| FINAL APRON (AFTER POUR/DRIVEWAY) | 02/18/2014 | APPROVED - AS NOTED | RGROSS |
| Note: Sprinklers filled pipe ends with water. Passed as noted that the water needs to be pumped out before pouring and the shoulder cannot be square. Talked to contractor about both issue. Contractor agreed to correct both before pouring. | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 02/13/2014 | Disapproved - NO FEE | RGROSS |
| Note: THIS IS A REINSPECTION No swale sheet on site. Working outside the scope of the approved Survey. Installing pipe extentions on both sides of the driveway requires a swale sheet, an approved survey, and a permit describing work to be performed. See comments in pre pour dated 2/4/13. Per Scott B. permit specifically states that builder will not be working in the ROW. | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 02/04/2014 | Disapproved - NO FEE | RGROSS |
| Note: Pavers should have been inspected before installation. Need to pull one large square paver on each side of the driveway to verify sub-base is sufficient. Working outside the scope of the survey. Pipe extentions added to both sides of the driveway must be on the survey as approved work to be done. See Zoning Dept. for preapproval. Swale sheet must be obtained to show pipe elevations. If approved, a Pre pour inspections must be done prior to pouring the driveway shoulders. Note : Sod in the ROW must be below the road surface to allow runoff before calling in the final ROW inspection. |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 02/13/2014 | 02/14/2014 |
| ENGIN1 | COMPLETE | 01/24/2014 | 01/24/2014 |
| Note: No swale plan required for work shown. | |||
| ZON | COMPLETE | 01/24/2014 | 01/28/2014 |
| ENGIN1 | HOLD | 01/17/2014 | 01/21/2014 |
| Note: D/W widening within the right of way must extend culvert, mitered end, and flare. D/W within right of way must comform to either Section V, Drawing #300.G "City of Palm Coast Paver Right-of-way residential Cluvert Detail" or Drawing #300E "Palm Coast Residential Culvert Detail" Scott Bombardier 986-3756 | |||
| SW1 | COMPLETE | 01/17/2014 | 01/17/2014 |
| UD1 | COMPLETE | 01/17/2014 | 01/21/2014 |
| ZON | HOLD | 01/17/2014 | 01/22/2014 |
| Note: Revise site plan to show dimensions of driveway addition to both sides. Revise site plan to include walkway on left side of the house include dimensions and setbacks. Revise landscape plan to remove flagstone steppers out of the 5ft utility easement. Revise site plan to remove landscape wall from right side 5ft easement. Obtain a separate shed permit include dimensions and setbacks. Also shed must be relocated behind front building footprint of house. Obtain a separate permit for new paver patio addition on front and left side of house include dimensions and new setbacks. Revise pool plan to relocate pool equipment and door pad. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMIN FEE | ¤20.00 | 01/29/2014 |
| SITE PLAN 20 | ¤20.00 | 01/29/2014 |
| SURCHARGE FS 533.721 | ¤2.00 | 01/29/2014 |
| SURCHARGE - FS 468.631 | ¤2.00 | 01/29/2014 |
| STORM WATER PERMIT FEES | ¤40.00 | 01/29/2014 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤84.00 |