I want to search for...

Permit #2014030267

Permit Details

Status: COED

Parcel Id: 07-11-31-7009-00200-0310
CONDITIONED SPACE: 2585 sqft
GARAGE: 526 sqft
GARAGE: 110 sqft
OPENED PORCH (WITH ROOF) : 650 sqft
OPENED PORCH (WITH ROOF) : 65 sqft
Total Square Footage: 3936 sqft
Block: 00200
Subdivision: 2208 - SECTION 9-FLORIDA PARK
Job Phone: (386)445-9055
Location Address: 29 FAIRMONT LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/19/2014
NOC: RECORDED
Applicant name: LUIS JORGE MEDEIROS
Owner: DA SILVA, JOAO C & DIAMANTINA M

Address

1 NORTHPARK CIRCLE

PALM COAST, FL 32137

Lot: 0310
Contracted Stated Job Value: ¤259,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

NEW COASTAL HOMES INC.
Status Location Address Mailing Address State License Number Phone Fax
CANCEL

399 SW PALM COAST PKWY

PALM COAST, FL 32137

STE5

PALM COAST, FL 32137

CRC1327024 (Exp: 08/31/2018) (386)445-9055 (386)445-9056

Sub Contractors

CHARLES K DAVIS
Status Location Address State License Number Phone
ACTIVE

3000 E MOODY BLVD BLDG 2

BUNNELL , FL 32110

EC13004270 (Exp: 08/31/2026) 386-931-6614
PAUL S AIELLO
Status Location Address State License Number Phone Fax
CANCEL

PO BOX 351926

PALM COAST, FL 32137

CAC1815808 (Exp: 08/31/2016) (386)239-0053 (386)323-1955
HEATH EDWARD SANFORD
Status Location Address State License Number Phone Fax
ACTIVE

1351 HAZELNUT ST

BUNNELL, FL 32110

CFC1427527 (Exp: 08/31/2026) 386-445-2532 386-445-5575
BARRY D MARTIN
Status Location Address State License Number Phone Fax
CANCEL

1650 N STATE STREET

Bunnell, FL 32110

CCC033728 (Exp: 08/31/2020) (386) 437-7700 (386)437-7701

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 08/07/2015 FINAL APPROVED MBACON
FINAL APRON (AFTER POUR/DRIVEWAY) 08/06/2015 APPROVED GLALIMA
Note: SPOKE WIT ''' BUILDER / OWNER
BLD - BUILDING FINAL 08/06/2015 FINAL APPROVED CMINI
Note: per contractor
ROW FINAL 08/03/2015 FINAL APPROVED GLALIMA
Note: THE REPAIR IS HOT PATCH
FINAL APRON (AFTER POUR/DRIVEWAY) 07/30/2015 Disapproved -FEE REQUIRED RGROSS
Note: THIS IS A REINSPECTION Hot patch road repair will quickly deteriorate and break apart as is now placed.
FINAL SURVEY (OFFICE USE ONLY) 07/27/2015 APPROVED DREWIS
Note: THIS IS A REINSPECTION
FINAL APRON (AFTER POUR/DRIVEWAY) 07/23/2015 Disapproved -FEE REQUIRED GLALIMA
Note: AT PRE-POUR I TOLD THEM '' THE PAVERS CAN NOT COME INTO THE ROAD . WHEN IT COMES TIME TO OVERLAY THE ROAD WE CAN'T ''MILL THE PAVERS . RIGHT NOW YOU HAVE THE PAVERS BELOW THE ROAD EDGE , THAT NOT GOOD . SO YOU NEED TO '' CUT '' THE PAVERS BACK 2 " AND BRING THEM UP OR YOU WILL ALWAYS HOLD WATER . AND THE NEXT TIME YOU THINK YOU NEED TO CUT A ROAD CALL FRIST '' GARY LA LIMA 585 - 0287
FINAL SURVEY (OFFICE USE ONLY) 05/13/2015 Disapproved - NO FEE FREODICA
ELECTRIC - EARLY POWER 05/12/2015 APPROVED CMINI
Note: Inspection Resulted at 5/12/2015 2:50:57 PM RELEASED POWER SPOKE TO SUSAN 2:45
ELECTRIC-TUG 04/13/2015 APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 4/13/2015 1:53:15 PM CALLED SUSAN FROM FPL TO RELEASE POWER 130PM
ELECTRIC-TUG 04/10/2015 Disapproved -FEE REQUIRED RMARTIN
Note: Inspection Resulted at 4/10/2015 9:19:58 AM UN-USED OPENINGS IN METER DISCONNECT NEED TO BE CLOSED UP. NEC110-12 A ...ROMEX NEEDS TO BE TERMINATED OR SAFED OFF IN METER
PRE-APRON (PRE-POUR/DRIVEWAY) 04/06/2015 APPROVED - AS NOTED GLALIMA
Note: THIS WAS CALLED IN TO GARY BY BUILDER ON 3 / 19 / 2015 PASSED GARY LALIMA
GRAVITY SEWER TEST 10/15/2014 APPROVED CMINI
U - SEWER TIE IN 10/10/2014 APPROVED DSPENCER
INSULATION 10/03/2014 APPROVED CMINI
Note: THIS IS A REINSPECTION
INSULATION 10/02/2014 CANCELLED BY APPLICANT CMINI
ALL ROUGH 09/25/2014 APPROVED CMINI
Note: THIS IS A REINSPECTION
ALL ROUGH 09/24/2014 Disapproved -FEE REQUIRED CMINI
Note: Inspection Resulted at 9/24/2014 2:38:35 PM WINDOW TOPS NOT SCREWED IN,CHECK ALL..NAIL PLATE ON ELECTRIC CHECK MASTER SHOWER..JACUZZI TUB OUTLET NEEEDS TO BE SECURE..WIRES FOR IRON BOARD NOT IN BOX..CHECK FIREBLOCKING ISSUES AT ARCH AREAS..SUBMIT CHANGES FOR ELECTRIAL FOR REVISION
LATH/BRICK/ WATER BARRIER 09/17/2014 APPROVED JCOLASANTI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/04/2014 APPROVED CMINI
Note: THIS IS A REINSPECTION
MONOLITHIC SLAB 08/27/2014 APPROVED CMINI
Note: THIS IS A REINSPECTION
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/27/2014 Disapproved -FEE REQUIRED CMINI
Note: Inspection Resulted at 8/27/2014 2:08:04 PM NEED TO INSTALL STRAPS ON TRUSSES T-55..NEED TO SUBMIT REVISION FOR TRUSS REPAIRS ON TRUSSES T-20 AND T-10
TIE BEAM / LINTEL 05/22/2014 APPROVED CMINI
Note: THIS IS A REINSPECTION
TIE BEAM / LINTEL 05/12/2014 Disapproved -FEE REQUIRED RMARVEL
Note: THIS IS A REINSPECTION Inspection Resulted at 5/12/2014 3:30:31 PM PROVIDE APPROVED PLANS ON SITE FOR INSPECTION.
TIE BEAM / LINTEL 05/09/2014 Disapproved -FEE REQUIRED RMARVEL
Note: Inspection Resulted at 5/9/2014 4:13:17 PM VENT STACK AT RIGHT CORNER NEEDS TO BE INSTALLED AT TIME OF THIS INSPECTION.
FOUND SURVEY APPROVED (OFFICE) 05/08/2014 APPROVED FREODICA
MONOLITHIC SLAB 04/17/2014 Disapproved -FEE REQUIRED CMINI
Note: Inspection Resulted at 4/17/2014 3:41:42 PM FOOTING DETAIL CALLING FOR 3#5 REBAR
PLUMBING 1ST ROUGH UNDERGROUND 04/15/2014 APPROVED CMINI

Review History

Department Status Date In Date Out
SW1 COMPLETE 07/24/2015 07/27/2015
Note: Released By: DREWIS RESUMBMIT FINAL SURVEY
SW1 HOLD 05/12/2015 05/13/2015
Note: Held By: FREODICA final survey Provide continous drainage flow from rear to front as per approved lot drainage plan.
ELEC COMPLETE 09/15/2014 09/15/2014
Note: Released By: JHINDMAN
BLD COMPLETE 08/28/2014 08/28/2014
BLD COMPLETE 05/20/2014 05/20/2014
SW1 COMPLETE 05/08/2014 05/08/2014
Note: Released By: FREODICA foundation s
BLD COMPLETE 04/23/2014 04/24/2014
BLD COMPLETE 03/11/2014 03/12/2014
ELEC COMPLETE 03/11/2014 03/12/2014
ENGIN1 COMPLETE 03/11/2014 03/18/2014
MECH COMPLETE 03/11/2014 03/12/2014
PLUM COMPLETE 03/11/2014 03/12/2014
SW1 COMPLETE 03/11/2014 03/12/2014
UD1 COMPLETE 03/11/2014 03/12/2014
Note: See comments in the general notes Keith King 386-9318009
URB COMPLETE 03/11/2014 03/12/2014
Note: FYI A/C screening must be 30" at planting.
ZON COMPLETE 03/11/2014 03/12/2014

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 08/20/2015
REINSPECTION FEE ¤40.00 08/20/2015
REINSPECTION FEE ¤40.00 08/20/2015
REINSPECTION FEE ¤40.00 08/20/2015
REINSPECTION FEE ¤40.00 08/20/2015
REINSPECTION FEE ¤40.00 08/20/2015
REINSPECTION FEE ¤40.00 08/20/2015
REVISION ¤40.00 08/20/2015
REVISION ¤40.00 08/20/2015
REVISION ¤40.00 08/20/2015
REVISION ¤40.00 08/20/2015
PARKS IMPACT FEE ¤894.24 08/20/2015
PLAN CHECK FEE ¤136.80 03/19/2014
PLUMBING FEE ¤265.20 03/19/2014
SITE PLAN 20 ¤20.00 03/19/2014
SURCHARGE FS 533.721 ¤24.55 03/19/2014
SURCHARGE - FS 468.631 ¤24.55 03/19/2014
STORM WATER PERMIT FEES ¤80.00 03/19/2014
3% TRANS IMPACT FEE CREDIT (¤90.51) 03/19/2014
NEW RESIDENTIAL INSPECTIONS ¤684.00 03/19/2014
ADMIN FEE ¤20.00 03/19/2014
ELECTRIC FEE ¤265.20 03/19/2014
3% FIRE IMPACT FEE CREDIT (¤6.24) 03/19/2014
IMPACT FEE FIRE NONRESIDENTIAL ¤207.99 03/19/2014
IMPACT FEE SCHOOL ¤3,600.00 03/19/2014
RECORDING FEE REIMBURSE DOC ¤52.50 03/19/2014
IMPACT FEE TRANSPORTATION ¤3,017.05 03/19/2014
MECHANICAL FEE ¤265.20 03/19/2014
Fees Total Due: ¤0.00 Total Paid: ¤9,900.53