Permit #2014040566
Permit Details
Status: COED
| Parcel Id: 48-11-31-1700-00000-0380 |
| CONDITIONED SPACE: 2628 sqft |
| GARAGE: 798 sqft |
| OPENED PORCH (WITH ROOF) : 626 sqft |
| OPENED PORCH (WITH ROOF) : 146 sqft |
| Total Square Footage: 4198 sqft |
| Block: 00000 |
| Subdivision: 2086 - ESTATES AT GRAND HAVEN PHASE I |
| Job Phone: (386) 445-4408 |
| Location Address: 167 WILLOW OAK WAY |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/05/2014 |
| NOC: RECORDED |
| Applicant name: PATRICK E KOLLAR |
| Owner: RED CARPET CONSTRUCTION INC |
|
Address 8A MARKET PLACE COURT PALM COAST, FL 32137 |
| Lot: 0380 |
| Contracted Stated Job Value: ¤350,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
RED CARPET CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
8A Market Place Court Palm Coast, FL 32137 |
CRC017457 (Exp: 08/31/2026) | (386) 445-4408 | (386)446-2232 |
Sub Contractors
BEN K REIHL
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
605 MCINTOSH ROAD Ormond Beach, 32174 |
EC0002867 (Exp: 08/31/2026) | (386) 677-4464 | 386-673-4199 |
SHAWN MICHAEL HISS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1315 LPGA BLVD HOLLY HILL, FL 32117 |
CAC1813585 (Exp: 08/31/2026) | (386)672-8688 |
THOMAS WALTER ALBANO
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P. O. BOX 352075 Palm Coast, FL 32135 |
CFC045991 (Exp: 08/31/2024) | 386-437-2795 | (386)437-2781 |
STEPHEN M RENDE
| Status | Location Address | State License Number | Phone |
| CANCEL |
22 ALAMANDA DRIVE ORMOND, FL 32176 |
CCC058058 (Exp: 08/31/2020) | 386-439-7156 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 09/14/2015 | FINAL APPROVED | MBACON |
| BLD - BUILDING FINAL | 09/10/2015 | FINAL APPROVED | DROCKWELL |
| FINAL APRON (AFTER POUR/DRIVEWAY) | 09/09/2015 | APPROVED - AS NOTED | CTROHA |
| Note: THIS IS A REINSPECTION LOWER PAVERS ALONG MIAMI GUTTER THEY ARE TOO HIGH CREATING A TRIPPING HAZARD | |||
| ROW FINAL | 09/09/2015 | APPROVED - AS NOTED | CTROHA |
| Note: PICK UP TRASH IN ADJACENT PROPERTY ALSO SEED BARE SPOTS | |||
| SEWER SERVICE | 09/09/2015 | CANCELLED BY INSPECTOR | BBEMBRY |
| Note: PER CONTRACTOR | |||
| FINAL SURVEY (OFFICE USE ONLY) | 09/08/2015 | APPROVED | DREWIS |
| FINAL APRON (AFTER POUR/DRIVEWAY) | 07/13/2015 | Disapproved -FEE REQUIRED | GLALIMA |
| Note: TOLD BUILDER ABOUT PAVER RESTRAINTS / EDGING . FAILED . ALSO HAS TO SHOW FINAL SURVEY WITH APPROVED DRIVEWAY. NEED TO CUT OUT DAMAGED STREET GUTTER AND REPLACE . NO PATCH JOB. RE-INSPECTION NEEDED + FEE | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 07/06/2015 | APPROVED - AS NOTED | GLALIMA |
| Note: ON SITE WITH G.M / BUILDER . NEED TO MOVE FORMS ON LEFT SIDE '' OUT '' 21/2" OR 3 " RADY TO POUR . WILL CHECK UPPER DRIVEWAY ROADBASE / SHELLBASE WHEN OWNER , BUILDER CALLS . | |||
| ELECTRIC - EARLY POWER | 06/17/2015 | APPROVED | DROCKWELL |
| GRAVITY SEWER TEST | 01/29/2015 | APPROVED | JCOLASANTI |
| SEWER SERVICE | 01/29/2015 | CANCELLED BY APPLICANT | AIRS WEB |
| U - SEWER TIE IN | 01/29/2015 | APPROVED | DSPENCER |
| INSULATION | 12/05/2014 | APPROVED | CMINI |
| ALL ROUGH | 11/19/2014 | APPROVED | CMINI |
| LATH/BRICK/ WATER BARRIER | 11/14/2014 | APPROVED | CMINI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/14/2014 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/10/2014 | CANCELLED BY APPLICANT | CMINI |
| Note: THIS IS A REINSPECTION | |||
| WALL SHEATHING | 10/06/2014 | APPROVED | CMINI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/06/2014 | Disapproved -FEE REQUIRED | CMINI |
| Note: Inspection Resulted at 10/6/2014 3:20:52 PM NEED APPROVED REPAIR REVISION FOR REPAIRED TRUSSES..MISSING FGR ATTACHMENT AND HGT2 ATTACHMENT PER PLAN..MISSING ENGINEERING CIRCLED ON SHEETS | |||
| ROOF SHEATHING | 10/06/2014 | CANCELLED BY APPLICANT | AIRS WEB |
| ROOF SHEATHING | 10/06/2014 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 10/6/2014 3:20:52 PM OK TO DRY IN | |||
| ELECTRIC-TUG | 09/19/2014 | APPROVED - AS NOTED | CMINI |
| Note: Called fpl to release power at 3:00 spoke to Jill | |||
| TIE BEAM / LINTEL | 09/09/2014 | APPROVED | CMINI |
| ELEV CERT-FOUNDATION APPROVAL | 09/08/2014 | APPROVED | CBENTLEY |
| FOUND SURVEY APPROVED (OFFICE) | 09/08/2014 | APPROVED | JHINDMAN |
| MONOLITHIC SLAB | 08/11/2014 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB | 08/07/2014 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: Inspection Resulted at 8/7/2014 3:10:05 PM COLUMN FOOTINGS NEED TO BE 12" MIM DEPTH PER PLAN, CHECK ALL. STEEL IN FOOTING CALLED OUT @6" OC. NEED TO ADD BARS EACH WAY TO ACHIEVE 6" OC PER PLAN, MIN. DEPTH OF EXTERIOR FOOTINGS NEED TO BE 12" FROM UNDISTURBED SOIL (CHECK IN BACK) FBC 403.1.4. •RELIEVING ARCH IN FOOTING AT AC CHASE P2603.5. ADD FORM BOARDS AT EXTERIOR FOOTINGS TO NOT ALLOW CEMENT OVERFLOW FBC 4041.2.3.6 | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 08/01/2014 | APPROVED | DROCKWELL |
Review History
| Department | Status | Date In | Date Out |
| PLFM | COMPLETE | 09/30/2015 | 10/02/2015 |
| SW1 | COMPLETE | 09/08/2015 | 09/08/2015 |
| Note: Released By: DREWIS FINAL SURVEY | |||
| BLD | COMPLETE | 11/10/2014 | 11/13/2014 |
| ELEC | COMPLETE | 11/10/2014 | 11/13/2014 |
| BLD | COMPLETE | 10/07/2014 | 10/07/2014 |
| SW1 | COMPLETE | 09/05/2014 | 09/08/2014 |
| Note: Released By: JHINDMAN foundation survey | |||
| PLFM | COMPLETE | 09/04/2014 | 09/08/2014 |
| PLFM | COMPLETE | 06/25/2014 | 06/26/2014 |
| SW1 | COMPLETE | 06/25/2014 | 06/25/2014 |
| ENGIN1 | COMPLETE | 06/25/2014 | 06/25/2014 |
| Note: Final surveys are the responsibility of the Building Department. | |||
| SW1 | HOLD | 06/25/2014 | 06/25/2014 |
| Note: 1. Provide the revised survey that shows the drainage along with the new elevation. J. Hindman 986-3784. | |||
| SW1 | HOLD | 06/18/2014 | 06/24/2014 |
| Note: Engineering hold will need to be completed before release | |||
| ENGIN1 | HOLD | 06/18/2014 | 06/18/2014 |
| Note: Review Lot grading plan LGP1-2 for roadway & finished floor elevation. BOC elevation 9.99 closest proposed survey elevation 9.05, revise elevations. Scott Bombardier 986-3756 | |||
| SW1 | HOLD | 06/11/2014 | 06/16/2014 |
| Note: 1. The proposed lot elevation is lower than the approved plat that is on file with the city. | |||
| ENGIN1 | HOLD | 06/11/2014 | 06/17/2014 |
| Note: Review Lot grading plan LGP1-2 for roadway & finished floor elevation. BOC elevation 9.99 closest proposed survey elevation 9.05, revise elevations. Scott Bombardier 986-3756 | |||
| ENGIN1 | HOLD | 06/03/2014 | 06/03/2014 |
| Note: Held By: SBOMBARDIER Refer to Estates at Grand Haven Phase 1 Lot grading plan for proper grading of this lot. This is a B graded lot which should be split at the house to drain to both the front and the rear of the property. Scott Bombardier 986-3756 | |||
| SW1 | HOLD | 06/03/2014 | 06/03/2014 |
| Note: Held By: JMCGOWEN Revised site plan finish floor elevation will need to comply with the minimum set by the drainage plans for this sub division. also this is a B lot and needs to be front and rear drainage to start at the middle of lot | |||
| ENGIN1 | HOLD | 05/29/2014 | 05/29/2014 |
| Note: Held By: SBOMBARDIER Refer to Estates at Grand Haven Phase 1 Lot grading plan for proper grading of this lot. This is a B graded lot which should be split at the house to drain to both the front and the rear of the property. Scott Bombardier 986-3756 | |||
| SW1 | HOLD | 05/29/2014 | 05/29/2014 |
| Note: Held By: JMCGOWEN Changed proposed drainage to reflect existing conditions finish floor elevation will need to comply with the minimum set by the drainage plans for this sub division. also this is a B lot and needs to be front and rear drainage to start at the middle of lot | |||
| URB | COMPLETE | 05/02/2014 | 05/02/2014 |
| URB | HOLD | 04/25/2014 | 04/29/2014 |
| Note: Need to indicate reclaimed water will be used. All piping,valve box covers,risers and irrigation heads shall be colored purple and a sign posted stating RE -USE WATER- do not drink | |||
| BLD | COMPLETE | 04/25/2014 | 04/28/2014 |
| ZON | COMPLETE | 04/25/2014 | 04/28/2014 |
| MECH | COMPLETE | 04/25/2014 | 04/28/2014 |
| PLUM | COMPLETE | 04/25/2014 | 04/28/2014 |
| BLD | HOLD | 04/17/2014 | 04/21/2014 |
| Note: 1. Provide a wall framing detail for the great room at the sliding glass doors with transom. 2010 FBC 107.2.1. 2. Provide Florida product approval for the windows, exterior doors, and overhead garage door. 2010 FBC 107.2.1. J. Hindman 986-3784. | |||
| ELEC | COMPLETE | 04/17/2014 | 04/22/2014 |
| ENGIN1 | COMPLETE | 04/17/2014 | 04/21/2014 |
| MECH | HOLD | 04/17/2014 | 04/22/2014 |
| Note: Provide duct layout plan and provide HVAC make and model to be used FBC 107.2.1 J McGowen | |||
| PLUM | HOLD | 04/17/2014 | 04/22/2014 |
| Note: provide plumbing riser detail FBC 107.2.1 J McGowen | |||
| SW1 | COMPLETE | 04/17/2014 | 04/21/2014 |
| UD1 | COMPLETE | 04/17/2014 | 04/22/2014 |
| Note: See comments in the general notes Keith King 386-9318009 | |||
| URB | HOLD | 04/17/2014 | 04/21/2014 |
| Note: Need to submit a irrigation plan using the guidelines on pages 42--43 of the technical manual as the lot is over 1/2 acre. | |||
| ZON | HOLD | 04/17/2014 | 04/21/2014 |
| Note: 1. Re-label "Office" to room type that does not have residential use. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 09/08/2015 |
| REINSPECTION FEE | ¤40.00 | 09/08/2015 |
| REINSPECTION FEE | ¤40.00 | 09/08/2015 |
| REVISION | ¤40.00 | 09/08/2015 |
| REVISION | ¤40.00 | 09/08/2015 |
| SITE PLAN 20 | ¤20.00 | 05/05/2014 |
| SURCHARGE FS 533.721 | ¤25.43 | 05/05/2014 |
| SURCHARGE - FS 468.631 | ¤25.43 | 05/05/2014 |
| STORM WATER PERMIT FEES | ¤80.00 | 05/05/2014 |
| 3% TRANS IMPACT FEE CREDIT | (¤90.51) | 05/05/2014 |
| NEW RESIDENTIAL INSPECTIONS | ¤712.00 | 05/05/2014 |
| ADMIN FEE | ¤20.00 | 05/05/2014 |
| ELECTRIC FEE | ¤273.60 | 05/05/2014 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.33) | 05/05/2014 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤211.11 | 05/05/2014 |
| IMPACT FEE PARKS | ¤894.24 | 05/05/2014 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 05/05/2014 |
| IMPACT FEE TRANSPORTATION | ¤3,017.05 | 05/05/2014 |
| MECHANICAL FEE | ¤273.60 | 05/05/2014 |
| 3% PARKS IMPACT FEE CREDIT | (¤26.83) | 05/05/2014 |
| PLAN CHECK FEE | ¤142.40 | 05/05/2014 |
| PLUMBING FEE | ¤273.60 | 05/05/2014 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,644.79 |