I want to search for...
Permit #2014040617
Permit Details
Status: COED
| Parcel Id: 07-11-31-7009-00450-0190 |
| CONDITIONED SPACE: 2350 sqft |
| GARAGE: 494 sqft |
| OPENED PORCH (WITH ROOF) : 348 sqft |
| OPENED PORCH (WITH ROOF) : 192 sqft |
| Total Square Footage: 3384 sqft |
| Block: 00450 |
| Subdivision: 2208 - SECTION 9-FLORIDA PARK |
| Job Phone: (386)445-9055 |
| Location Address: 60 FENIMORE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/24/2014 |
| NOC: RECORDED |
| Applicant name: LUIS JORGE MEDEIROS |
| Owner: MOITOSO, EDWARD & MARIA |
|
Address 198 QUARRY ST EAST PROVIDENCE, RI 02914 |
| Lot: 0190 |
| Contracted Stated Job Value: ¤209,900.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
NEW COASTAL HOMES INC.
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
399 SW PALM COAST PKWY PALM COAST, FL 32137 |
STE5 PALM COAST, FL 32137 |
CRC1327024 (Exp: 08/31/2018) | (386)445-9055 | (386)445-9056 |
Sub Contractors
CHARLES K DAVIS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3000 E MOODY BLVD BLDG 2 BUNNELL , FL 32110 |
EC13004270 (Exp: 08/31/2026) | 386-931-6614 |
PAUL S AIELLO
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
PO BOX 351926 PALM COAST, FL 32137 |
CAC1815808 (Exp: 08/31/2016) | (386)239-0053 | (386)323-1955 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1351 HAZELNUT ST BUNNELL, FL 32110 |
CFC1427527 (Exp: 08/31/2026) | 386-445-2532 | 386-445-5575 |
BARRY D MARTIN
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1650 N STATE STREET Bunnell, FL 32110 |
CCC033728 (Exp: 08/31/2020) | (386) 437-7700 | (386)437-7701 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 08/18/2015 | FINAL APPROVED | MBACON |
| BLD - BUILDING FINAL | 08/17/2015 | FINAL APPROVED | CMINI |
| FINAL APRON (AFTER POUR/DRIVEWAY) | 07/30/2015 | APPROVED | GLALIMA |
| Note: THIS IS A REINSPECTION | |||
| ROW FINAL | 07/30/2015 | APPROVED | GLALIMA |
| FINAL SURVEY (OFFICE USE ONLY) | 07/27/2015 | APPROVED | DREWIS |
| FINAL APRON (AFTER POUR/DRIVEWAY) | 07/24/2015 | Disapproved -FEE REQUIRED | GLALIMA |
| Note: NEED FINAL SURVEY AND SWALE PLAN ON SITE FOR FINAL | |||
| ELECTRIC - EARLY POWER | 05/22/2015 | APPROVED | RMARTIN |
| Note: Inspection Resulted at 5/22/2015 3:17:25 PM CALLED FPL SPOKE TO SUSAN 3:00 | |||
| ELECTRIC-TUG | 05/22/2015 | APPROVED | RMARTIN |
| PRE-APRON (PRE-POUR/DRIVEWAY) | 05/21/2015 | APPROVED | GLALIMA |
| Note: THIS IS A REINSPECTION GARY LA LIMA REMOVED REINSPECTION FEE . UTILITY POLE WAS REMOVED AND REPLACED BY F.L.P. IF AN ISSUE CALL GARY LA LIMA 585-0287 | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 05/14/2015 | Disapproved -FEE REQUIRED | RGROSS |
| Note: per luis No proposed site plan on site to show the width of the driveway. No BM on site as shown by the swale plan. Could not check culvert pipe elevations. | |||
| LATH/BRICK/ WATER BARRIER | 01/28/2015 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 01/23/2015 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: Inspection Resulted at 1/23/2015 2:37:30 PM NEED TO INSTALL LATHE ON WOOD STRIP LOCATED AT ENTRY WAY. | |||
| INSULATION | 01/13/2015 | APPROVED | CMINI |
| ALL ROUGH | 01/06/2015 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/30/2014 | APPROVED | CMINI |
| ALL ROUGH | 12/30/2014 | Disapproved -FEE REQUIRED | CMINI |
| Note: Inspection Resulted at 12/30/2014 11:16:36 AM NEED TO PHASE NEUTRAL IN PANEL FOR AC LINE NEC 210.5(C)...NEED TO STRAP SUPPORT WIRES IN ATTIC EVERY 4-1/2 FT. DINING RM AND LAUNDRY RM AND SER CABLE, CHECK ALLSTRAPPING OF ROMEX NEC.334.30.. GROUND SCREW IN BD RM HALLWAY NEEDS TO BE SECURE..ALARM BOX RECPT NOT COMPLETE..NEED TO SEAL EXHAUST BATH DUCT AT ROOF WITH MASTIC..FBC.. M1601.4.1.7.TEST ON DWV FBC 2503.5.1..MISSING SCREWS IN MASTER BATH WINDOW | |||
| TIE BEAM / LINTEL | 07/15/2014 | APPROVED | CMINI |
| FOUND SURVEY APPROVED (OFFICE) | 07/07/2014 | APPROVED | JHINDMAN |
| GRAVITY SEWER TEST | 06/06/2014 | APPROVED | JHINDMAN |
| U - SEWER TIE IN | 06/06/2014 | APPROVED | DSPENCER |
| MONOLITHIC SLAB | 06/02/2014 | APPROVED | CMINI |
| PLUMBING 1ST ROUGH UNDERGROUND | 05/27/2014 | APPROVED | CMINI |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 07/24/2015 | 07/27/2015 |
| Note: Released By: DREWIS FINAL SURVEY | |||
| ELEC | COMPLETE | 12/22/2014 | 12/22/2014 |
| SW1 | COMPLETE | 07/03/2014 | 07/07/2014 |
| Note: Released By: JHINDMAN FOUNDATION SURVEY | |||
| BLD | COMPLETE | 05/20/2014 | 05/20/2014 |
| ELEC | COMPLETE | 05/20/2014 | 05/20/2014 |
| BLD | COMPLETE | 04/21/2014 | 04/22/2014 |
| ELEC | COMPLETE | 04/21/2014 | 04/22/2014 |
| ENGIN1 | COMPLETE | 04/21/2014 | 04/23/2014 |
| MECH | COMPLETE | 04/21/2014 | 04/22/2014 |
| PLUM | COMPLETE | 04/21/2014 | 04/22/2014 |
| SW1 | COMPLETE | 04/21/2014 | 04/22/2014 |
| UD1 | COMPLETE | 04/21/2014 | 04/22/2014 |
| Note: See comments in the general notes Keith King 386-9318009 | |||
| URB | COMPLETE | 04/21/2014 | 04/22/2014 |
| ZON | COMPLETE | 04/21/2014 | 04/22/2014 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 08/19/2015 |
| REINSPECTION FEE | ¤40.00 | 08/19/2015 |
| REINSPECTION FEE | ¤40.00 | 08/19/2015 |
| REVISION | ¤40.00 | 08/19/2015 |
| REVISION | ¤40.00 | 08/19/2015 |
| SITE PLAN 20 | ¤20.00 | 04/24/2014 |
| SURCHARGE FS 533.721 | ¤22.09 | 04/24/2014 |
| SURCHARGE - FS 468.631 | ¤22.09 | 04/24/2014 |
| STORM WATER PERMIT FEES | ¤80.00 | 04/24/2014 |
| 3% TRANS IMPACT FEE CREDIT | (¤90.51) | 04/24/2014 |
| NEW RESIDENTIAL INSPECTIONS | ¤606.00 | 04/24/2014 |
| ADMIN FEE | ¤20.00 | 04/24/2014 |
| ELECTRIC FEE | ¤241.80 | 04/24/2014 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.33) | 04/24/2014 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤211.11 | 04/24/2014 |
| IMPACT FEE PARKS | ¤894.24 | 04/24/2014 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 04/24/2014 |
| RECORDING FEE REIMBURSE DOC | ¤52.50 | 04/24/2014 |
| IMPACT FEE TRANSPORTATION | ¤3,017.05 | 04/24/2014 |
| MECHANICAL FEE | ¤241.80 | 04/24/2014 |
| 3% PARKS IMPACT FEE CREDIT | (¤26.83) | 04/24/2014 |
| PLAN CHECK FEE | ¤121.20 | 04/24/2014 |
| PLUMBING FEE | ¤241.80 | 04/24/2014 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,468.01 |