Permit #2014050060
Permit Details
Status: COED
| Parcel Id: 07-11-31-7059-00340-0020 |
| CONDITIONED SPACE: 1435 sqft |
| GARAGE: 413 sqft |
| OPENED PORCH (WITH ROOF) : 300 sqft |
| OPENED PORCH (WITH ROOF) : 200 sqft |
| Total Square Footage: 2348 sqft |
| Block: 00340 |
| Subdivision: 2211 - SECTION 59-SEMINOLE PARK |
| Job Phone: (904)296-1490 |
| Location Address: 17 SEA FLOWER PATH |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/28/2014 |
| NOC: RECORDED |
| Applicant name: KENNETH WAYNE CAMPBELL JR |
| Owner: MARONDA HOMES INC |
|
Address 9700 PHILIPS HIGHWAY JACKSONVILLE, FL 32256 |
|
Address SUITE 102 JACKSONVILLE, FL 32256 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤82,669.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
MARONDA HOMES INC. OF FLORIDA
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
6800 SOUTHPOINT PKWAY SUITE 300 JACKSONVILLE, FL 32216 |
CBC058803 (Exp: 08/31/2018) | 904-268-7730 | 904-268-7740 |
Sub Contractors
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
RONALD KEVIN HAUPT
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
PO BOX 140006 OVIEDO , FL 32765 |
CAC058534 (Exp: 08/31/2016) | 407-880-1539 | 407-880-2172 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
JACK DOUGLAS LANIER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
485 COMMERCE WAY LONGWOOD , FL 32750 |
CCC058022 (Exp: 08/31/2026) | (321)441-2300 | (321)441-2313 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 10/22/2014 | Disapproved -FEE REQUIRED | DSPENCER |
| Note: Inspection Resulted at 10/22/2014 1:06:57 PM THE POWER TO THE PEP PANEL IS OFF I CANNOT TEST THE PUMP OPERATIONAND THE CLEANOUT NEAR THE PEP TANK IS TO HIGH AND HAS THE WRONG TYPE CLEANOUT CAP.THE POWER MUST BE AVAILABE AND THE CLEANOUT MUST BE THE FLAT SLOTTED TYPE FLUSH WITH THE GROUND TO PREVENT BEING HIT BY MOWING. THE FINAL GRADE AROUND THE PEP TANK CHAMBER AND SHUTOFF VALVE BOX SHOULD BE ADJUSTED TO MEET THEM AND SOD RESET BECAUSE THEY CANNOT BE ADJUSTED. | |||
| U -UTILITY RESIDENTIAL FINAL | 10/22/2014 | FINAL APPROVED | DSPENCER |
| Note: THIS IS A REINSPECTION | |||
| ROW FINAL | 10/21/2014 | APPROVED | GLALIMA |
| Note: THIS IS A REINSPECTION | |||
| BLD - BUILDING FINAL | 10/21/2014 | FINAL APPROVED | DROCKWELL |
| ROW FINAL | 10/20/2014 | Disapproved -FEE REQUIRED | GLALIMA |
| Note: 3rd PARTY LIABILITY ON ELEVATIONS OF INVERT AND OUTLET OF CULVERT PIPE NEED TO BE ON SURVEY '' NUMBERS ON THE FINAL SURVEY ARE THE ELEVATIONS OF THE SOD '' NOT CULVERT | |||
| FINAL SURVEY (OFFICE USE ONLY) | 10/20/2014 | APPROVED | JHINDMAN |
| FINAL APRON (AFTER POUR/DRIVEWAY) | 10/16/2014 | APPROVED | RGROSS |
| U - SEWER TIE IN | 09/24/2014 | APPROVED | DSPENCER |
| PRE-APRON (PRE-POUR/DRIVEWAY) | 09/18/2014 | APPROVED | RGROSS |
| ELECTRIC - EARLY POWER | 09/11/2014 | APPROVED | DROCKWELL |
| LATH/BRICK/ WATER BARRIER | 08/28/2014 | APPROVED | CMINI |
| INSULATION | 08/20/2014 | APPROVED | DROCKWELL |
| ALL ROUGH | 08/15/2014 | APPROVED - AS NOTED | DROCKWELL |
| Note: THIS IS A REINSPECTION Inspection Resulted at 8/15/2014 11:36:45 AM MISSING 2 OUTLETS ON PLAN/REVISE ELEC TO SHOW RE-LOCATED SERVICE PANEL-WILL CHECK AT INSULATION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/12/2014 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 08/12/2014 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Inspection Resulted at 8/12/2014 11:30:57 AM APPROVED STAMPED PLANS NOT ON SITE/NAIL PLATE AT BOTH SIDES AT SERVICE PANEL TOP PLATE/SUPPORT GUEST BATH EXHAUST AT MID-POINT USE TRUSS WEB/NM CABLE HANGING BELOW TRUSSES IN GARAGE/SEAL DRYER DUCT AT BOTTOM ROOF DECK ALSO SUPPORT AT MID-POINT. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/08/2014 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Inspection Resulted at 8/8/2014 12:29:06 PM RE-NAIL FLAT TOP TRUSSES AT SHEATHING JOINT THE ENTIRE LENGTH-SHEETS LOOSE-SEE ORANGE SPRAY/ 2X8 RAFTER SUPPORTING ROOF SHEATHING IS STRUCTURAL-NOT A NAILER ADJUST RAFTER TO SUPPORT ROOF-IN FRONT ENTRY AREA/NOT READY FOR INSPECTION-INCOMPLETE INSPECTION/REMOVE MANY SHINERS | |||
| TIE BEAM / LINTEL | 07/11/2014 | APPROVED | DROCKWELL |
| GRAVITY SEWER TEST | 07/02/2014 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB | 07/02/2014 | APPROVED | DROCKWELL |
| FOUND SURVEY APPROVED (OFFICE) | 07/02/2014 | APPROVED | JMCGOWEN |
| GRAVITY SEWER TEST | 06/30/2014 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: THIS IS A REINSPECTION Inspection Resulted at 6/30/2014 2:32:06 PM PIPE JOINT COVERED UP CAN NOT WIEW CONNECTION- REMOVE CAP ALSO MAKE SURE WATER FLUSH WITH TOP PIPE | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 06/30/2014 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| GRAVITY SEWER TEST | 06/27/2014 | CANCELLED BY APPLICANT | DROCKWELL |
| PLUMBING 1ST ROUGH UNDERGROUND | 06/27/2014 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Inspection Resulted at 6/27/2014 2:31:02 PM WORK HAS YET TO BEGIN-DID NOT HEAR FROM TONY TO CANCEL INSPECTION | |||
| FOOTER | 06/17/2014 | APPROVED | DROCKWELL |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 10/17/2014 | 10/20/2014 |
| Note: Released By: JHINDMAN final survey | |||
| ELEC | COMPLETE | 08/18/2014 | 08/18/2014 |
| SW1 | HOLD | 07/02/2014 | 07/02/2014 |
| Note: Held By: JMCGOWEN provide finish floor elevation | |||
| SW1 | COMPLETE | 07/02/2014 | 07/02/2014 |
| Note: Released By: JMCGOWEN | |||
| ENGIN1 | COMPLETE | 05/12/2014 | 05/19/2014 |
| BLD | COMPLETE | 05/09/2014 | 05/09/2014 |
| ENGIN1 | HOLD | 05/09/2014 | 05/09/2014 |
| Note: Surveyor's unable to locate benchmark as depicted on plans. Scott Bombardier 986-3756 | |||
| UD1 | COMPLETE | 05/09/2014 | 05/09/2014 |
| Note: See comments in the general notes Keith King 386-9318009 | |||
| ELEC | COMPLETE | 05/09/2014 | 05/09/2014 |
| Note: Released By: JHINDMAN | |||
| BLD | HOLD | 05/02/2014 | 05/05/2014 |
| Note: 1. Sheet TR1 does not state which connectors to use from the anchor tables. 2010 FBC 107.2.1.J. Hindman 986-3784. | |||
| ELEC | HOLD | 05/02/2014 | 05/02/2014 |
| Note: Relocate receptacles to meet NEC 210.52 J McGowen | |||
| ENGIN1 | HOLD | 05/02/2014 | 05/08/2014 |
| Note: Surveyor's unable to locate benchmark as depicted on plans. | |||
| MECH | COMPLETE | 05/02/2014 | 05/02/2014 |
| PLUM | COMPLETE | 05/02/2014 | 05/02/2014 |
| SW1 | COMPLETE | 05/02/2014 | 05/02/2014 |
| UD1 | COMPLETE | 05/02/2014 | 05/02/2014 |
| Note: See comments in the general notes Keith King 386-9318009 | |||
| URB | COMPLETE | 05/02/2014 | 05/05/2014 |
| ZON | COMPLETE | 05/02/2014 | 05/05/2014 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 10/24/2014 |
| REINSPECTION FEE | ¤40.00 | 10/24/2014 |
| REINSPECTION FEE | ¤40.00 | 10/24/2014 |
| REINSPECTION FEE | ¤40.00 | 10/24/2014 |
| REINSPECTION FEE | ¤40.00 | 10/24/2014 |
| REVISION | ¤40.00 | 10/24/2014 |
| SITE PLAN 20 | ¤20.00 | 05/28/2014 |
| SURCHARGE FS 533.721 | ¤15.41 | 05/28/2014 |
| SURCHARGE - FS 468.631 | ¤15.41 | 05/28/2014 |
| STORM WATER PERMIT FEES | ¤80.00 | 05/28/2014 |
| 3% TRANS IMPACT FEE CREDIT | (¤90.51) | 05/28/2014 |
| NEW RESIDENTIAL INSPECTIONS | ¤394.00 | 05/28/2014 |
| ADMIN FEE | ¤20.00 | 05/28/2014 |
| ELECTRIC FEE | ¤178.20 | 05/28/2014 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.33) | 05/28/2014 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤211.11 | 05/28/2014 |
| IMPACT FEE PARKS | ¤894.24 | 05/28/2014 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 05/28/2014 |
| IMPACT FEE TRANSPORTATION | ¤3,017.05 | 05/28/2014 |
| MECHANICAL FEE | ¤178.20 | 05/28/2014 |
| 3% PARKS IMPACT FEE CREDIT | (¤26.83) | 05/28/2014 |
| PLAN CHECK FEE | ¤78.80 | 05/28/2014 |
| PLUMBING FEE | ¤178.20 | 05/28/2014 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤8,996.95 |