Permit #2014050839

Permit Details

Status: COED

Parcel Id: 07-11-31-7009-00170-0290
CONDITIONED SPACE: 2676 sqft
GARAGE: 478 sqft
OPENED PORCH (WITH ROOF) : 296 sqft
OPENED PORCH (WITH ROOF) : 66 sqft
Total Square Footage: 3516 sqft
Block: 00170
Subdivision: 2208 - SECTION 9-FLORIDA PARK
Job Phone: (386)446-5161
Location Address: 13 FAIRBANK LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/09/2014
NOC: RECORDED
Applicant name: HUGO A CAMACHO
Owner: IDEAL HOMES AT PALM COAST

Address

PO BOX 353639

PALM COAST, FL 32135

Lot: 0290
Contracted Stated Job Value: ¤300,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

IDEAL HOMES AT PALM COAST, INC.
Status Location Address State License Number Phone Fax
INACTIVE

PO BOX 353639

PALM COAST, FL 32137

CBC1250774 (Exp: 08/31/2026) (386)446-5161 (386)447-0238

Sub Contractors

WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
PAUL S AIELLO
Status Location Address State License Number Phone Fax
CANCEL

PO BOX 351926

PALM COAST, FL 32137

CAC1815808 (Exp: 08/31/2016) (386)239-0053 (386)323-1955
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
RYSZARD ALOJZY SKLADZIEN
Status Location Address State License Number Phone Fax
CANCEL

2 MARKET PLACE UNIT D

PALM COAST, FL 32137

CCC057546 (Exp: 08/31/2016) (386)445-7945 (386)446-3871

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 05/22/2015 FINAL APPROVED MBACON
BLD - BUILDING FINAL 05/21/2015 FINAL APPROVED JCOLASANTI
ROW FINAL 05/05/2015 APPROVED GLALIMA
FINAL APRON (AFTER POUR/DRIVEWAY) 04/17/2015 APPROVED GLALIMA
Note: THIS IS A REINSPECTION YOU WILL ALWAYS HAVE TO HAVE FINAL SURVEY ON SITE FOR R.O.W or FINAL DRIVEWAY . SURVERY WAS APPROVE ON 4 / 16 / 2015
FINAL APRON (AFTER POUR/DRIVEWAY) 04/16/2015 Disapproved -FEE REQUIRED GLALIMA
Note: NEED FINAL SURVEY
FINAL SURVEY (OFFICE USE ONLY) 04/14/2015 APPROVED JHINDMAN
PRE-APRON (PRE-POUR/DRIVEWAY) 03/17/2015 APPROVED GLALIMA
Note: THIS IS A REINSPECTION
PRE-APRON (PRE-POUR/DRIVEWAY) 03/04/2015 Disapproved -FEE REQUIRED RGROSS
Note: Apron Flares must be a minimum of 36 inches. Circular Driveway not formed correctly. Does not match the proposed survey widths on either side. On site with contractor.
ELECTRIC - EARLY POWER 02/25/2015 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 2/25/2015 11:13:06 AM CALLED FPL TO RELEASE POWER AT 11 AM, SPOKE WITH SUSAN
U - SEWER TIE IN 02/17/2015 APPROVED DSPENCER
Note: THIS IS A REINSPECTION
U - SEWER TIE IN 02/13/2015 Disapproved -FEE REQUIRED DSPENCER
Note: Inspection Resulted at 2/13/2015 3:56:17 PM CONNECTION NOT VISABLE FOR INSPECTION
GRAVITY SEWER TEST 02/13/2015 APPROVED CMINI
INSULATION 12/16/2014 APPROVED CMINI
ALL ROUGH 11/19/2014 APPROVED CMINI
Note: THIS IS A REINSPECTION
ALL ROUGH 11/17/2014 Disapproved -FEE REQUIRED JCOLASANTI
Note: Inspection Resulted at 11/17/2014 2:37:37 PM TEST ON DWV AND WATER PIPPING NEED 5`` OF HEAD PREASURD FPC .312 FBC 2503.5.1, NEED GROUNDING AT FAN OUTLETS. GARAGE PANCAKES HAVE STUCCO INSIDE COULD NOT VARIFY GROUNDING. ANCHORS MISSING DOUBLE DOOR AT REAR PORCH. SMOKE DETECTOR NEEDS TO BE WITHIN 10`` OF BD.RM AT HALLWAY ...FBC 315.1, NM WIRE ABOVE PANTRY NEEDS TO BE MOVED AWAY FROM TRUSS PLATE. NAIL PLATES NEEDED AT LOW VOLTAGE WIRING CHECK ALL WINDOWS AND FRONT DOOR. NEED NAIL PLATE AT WATER LINES BETWEEN KITCHEN AND LIVING ROOM..
LATH/BRICK/ WATER BARRIER 10/07/2014 APPROVED JCOLASANTI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/18/2014 APPROVED CMINI
ELECTRIC-TUG 09/05/2014 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 9/5/2014 2:51:46 PM CALLED FPL TO RELEASE POWER AT 3:00,SPOKE WITH SUSAN
TIE BEAM / LINTEL 08/28/2014 APPROVED JCOLASANTI
FOUND SURVEY APPROVED (OFFICE) 08/25/2014 APPROVED JHINDMAN
MONOLITHIC SLAB 08/06/2014 APPROVED - AS NOTED JCOLASANTI
Note: Inspection Resulted at 8/6/2014 2:17:11 PM NEED (2) VERTICAL DOWELS AT GARAGE PARTITION COLUMN TIED TO FOOTING STEEL
PLUMBING 1ST ROUGH UNDERGROUND 08/04/2014 FINAL APPROVED CMINI

Review History

Department Status Date In Date Out
SW1 COMPLETE 04/13/2015 04/14/2015
Note: Released By: JHINDMAN final s
BLD COMPLETE 03/09/2015 03/09/2015
ENGIN1 COMPLETE 03/09/2015 03/16/2015
SW1 COMPLETE 03/09/2015 03/09/2015
ZON COMPLETE 03/09/2015 03/10/2015
ELEC COMPLETE 10/27/2014 10/28/2014
SW1 COMPLETE 08/25/2014 08/25/2014
Note: Released By: JHINDMAN foundation s
BLD COMPLETE 07/29/2014 07/29/2014
ENGIN1 COMPLETE 07/01/2014 07/02/2014
BLD COMPLETE 06/02/2014 06/02/2014
ELEC COMPLETE 06/02/2014 06/02/2014
ENGIN1 HOLD 06/02/2014 06/11/2014
Note: Update Driveway Detail Plan. Current code requires 3,000 psi concrete, 3' apron flare, and 5" of concrete cover over the culvert. Scott Bombardier 986-3756
MECH COMPLETE 06/02/2014 06/02/2014
PLUM COMPLETE 06/02/2014 06/02/2014
SW1 COMPLETE 06/02/2014 06/02/2014
UD1 COMPLETE 06/02/2014 06/03/2014
Note: See comments in the general notes Keith King 386-9318009
URB COMPLETE 06/02/2014 06/03/2014
ZON COMPLETE 06/02/2014 06/02/2014

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 05/26/2015
REINSPECTION FEE ¤40.00 05/26/2015
REINSPECTION FEE ¤40.00 05/26/2015
REINSPECTION FEE ¤40.00 05/26/2015
REVISION ¤40.00 05/26/2015
REVISION ¤4.00 05/26/2015
SITE PLAN 20 ¤20.00 07/09/2014
SURCHARGE FS 533.721 ¤23.85 07/09/2014
SURCHARGE - FS 468.631 ¤23.85 07/09/2014
STORM WATER PERMIT FEES ¤80.00 07/09/2014
3% TRANS IMPACT FEE CREDIT (¤90.51) 07/09/2014
NEW RESIDENTIAL INSPECTIONS ¤662.00 07/09/2014
ADMIN FEE ¤20.00 07/09/2014
ELECTRIC FEE ¤258.60 07/09/2014
3% FIRE IMPACT FEE CREDIT (¤6.33) 07/09/2014
IMPACT FEE FIRE NONRESIDENTIAL ¤211.11 07/09/2014
IMPACT FEE PARKS ¤894.24 07/09/2014
IMPACT FEE SCHOOL ¤3,600.00 07/09/2014
IMPACT FEE TRANSPORTATION ¤3,017.05 07/09/2014
MECHANICAL FEE ¤258.60 07/09/2014
3% PARKS IMPACT FEE CREDIT (¤26.83) 07/09/2014
PLAN CHECK FEE ¤132.40 07/09/2014
PLUMBING FEE ¤258.60 07/09/2014
Fees Total Due: ¤0.00 Total Paid: ¤9,540.63