I want to search for...
Permit #2014070307
Permit Details
Status: COED
| Parcel Id: 16-11-31-1260-00000-0280 |
| CONDITIONED SPACE: 2201 sqft |
| GARAGE: 505 sqft |
| OPENED PORCH (WITH ROOF) : 598 sqft |
| OPENED PORCH (WITH ROOF) : 46 sqft |
| Total Square Footage: 3350 sqft |
| Block: 00000 |
| Subdivision: 2081 - Creekside Village at Grand Haven |
| Job Phone: 386-236-4133 |
| Location Address: 6 SWEETWATER CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/07/2014 |
| NOC: RECORDED |
| Applicant name: KEVIN MICHAEL MAYS |
| Owner: KNICKERBOCKER, ROBERT H & KAREN A |
|
Address 26 LAKESIDE DRIVE PALM COAST, FL 32137 |
| Lot: 0280 |
| Contracted Stated Job Value: ¤291,558.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
INTERVEST CONSTRUCTION, INC
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
2379 BEVILLE ROAD DAYTONA BEACH, FL 32119 |
CGC1517573 (Exp: 08/31/2018) | 386-236-4133 | 386-763-7833 |
Sub Contractors
STEPHEN COURTEAUX
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
85 North Yonge Street Ormond Beach, FL 32174 |
EC13001748 (Exp: 08/31/2026) | (386) 672-4900 | 386-676-7472 |
CHRIS C KOONTZ
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
651 CARSWELL AVE Holly Hill, FL 32117 |
CAC035563 (Exp: 08/31/2024) | (386) 252-1878 | (386)252-9703 |
GARY WAYNE EVERS
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 740106 ORANGE CITY, FL 32763 |
CFC050566 (Exp: 08/31/2026) | 386-775-0909 | 386-775-0918 |
BARRY D MARTIN
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1650 N STATE STREET Bunnell, FL 32110 |
CCC033728 (Exp: 08/31/2020) | (386) 437-7700 | (386)437-7701 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 12/18/2014 | APPROVED | MKRONENBERG |
| Note: per contractor | |||
| FINAL APRON (AFTER POUR/DRIVEWAY) | 12/17/2014 | APPROVED | GLALIMA |
| Note: THIS IS A REINSPECTION | |||
| ROW FINAL | 12/17/2014 | APPROVED | GLALIMA |
| Note: THIS IS A REINSPECTION | |||
| BLD - BUILDING FINAL | 12/17/2014 | FINAL APPROVED | CMINI |
| FINAL SURVEY (OFFICE USE ONLY) | 12/16/2014 | APPROVED | JHINDMAN |
| ROW FINAL | 12/10/2014 | CANCELLED BY APPLICANT | GLALIMA |
| FINAL APRON (AFTER POUR/DRIVEWAY) | 12/10/2014 | CANCELLED BY APPLICANT | GLALIMA |
| ELECTRIC - EARLY POWER | 12/09/2014 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| ELECTRIC - EARLY POWER | 12/08/2014 | CANCELLED BY APPLICANT | CMINI |
| PRE-APRON (PRE-POUR/DRIVEWAY) | 12/02/2014 | APPROVED | GLALIMA |
| Note: READY TO POUR CONCRETE DRIVEWAY | |||
| LATH/BRICK/ WATER BARRIER | 11/06/2014 | APPROVED | CMINI |
| INSULATION | 11/03/2014 | APPROVED | DROCKWELL |
| ALL ROUGH | 10/29/2014 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 10/29/2014 12:33:13 PM IN DINING ROOM NEED RECEPT 6`` OFF DOOR OPENING..NAIL PLATE OVER DRYER VENT.. WIRE SHEATHING NEEDS TO BE INSIDE BOX.. HALLWAY | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/28/2014 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/27/2014 | Disapproved -FEE REQUIRED | CMINI |
| Note: Inspection Resulted at 10/27/2014 10:45:50 AM LEDGER BOARD IN GARAGE NEEDS TO BE TAPCONED...FINISH STRAPPING OF FRONT ENTRY | |||
| GRAVITY SEWER TEST | 10/27/2014 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| U - SEWER TIE IN | 10/27/2014 | APPROVED | DSPENCER |
| Note: THIS IS A REINSPECTION | |||
| U - SEWER TIE IN | 10/16/2014 | CANCELLED BY APPLICANT | DSPENCER |
| Note: THIS IS A REINSPECTION | |||
| GRAVITY SEWER TEST | 10/16/2014 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: Inspection Resulted at 10/16/2014 9:15:09 AM 1 PIPING IS COVERED CANNOT INSPECT. 2010 FBC 110.5 | |||
| U - SEWER TIE IN | 10/15/2014 | CANCELLED BY APPLICANT | DSPENCER |
| ELECTRIC-TUG | 09/25/2014 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 9/25/2014 2:22:26 PM CALLED FPL TO RELEASE POWER AT 1:55,SPOKE WITH JILL | |||
| TIE BEAM / LINTEL | 09/25/2014 | APPROVED | CMINI |
| FOUND SURVEY APPROVED (OFFICE) | 09/24/2014 | APPROVED | RLEE |
| MONOLITHIC SLAB | 09/09/2014 | APPROVED | DROCKWELL |
| PLUMBING 1ST ROUGH UNDERGROUND | 09/04/2014 | APPROVED | DROCKWELL |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 12/16/2014 | 12/16/2014 |
| Note: Released By: JHINDMAN final s | |||
| SW1 | COMPLETE | 09/19/2014 | 09/22/2014 |
| Note: Released By: JMONTARULI foundation survey Released per RLee | |||
| PLUM | COMPLETE | 08/05/2014 | 08/05/2014 |
| ELEC | COMPLETE | 08/05/2014 | 08/06/2014 |
| SW1 | COMPLETE | 07/22/2014 | 07/22/2014 |
| Note: Released By: JMCGOWEN | |||
| BLD | COMPLETE | 07/15/2014 | 07/15/2014 |
| ELEC | HOLD | 07/15/2014 | 07/15/2014 |
| Note: Provide electric load calculations NEC 220 | |||
| ENGIN1 | COMPLETE | 07/15/2014 | 07/15/2014 |
| Note: No swale plan required. | |||
| MECH | COMPLETE | 07/15/2014 | 07/15/2014 |
| PLUM | HOLD | 07/15/2014 | 07/15/2014 |
| Note: provide plumbing riser detail FBC 107.2.1 | |||
| SW1 | HOLD | 07/15/2014 | 07/15/2014 |
| Note: revise plot plan to show lot drainage from rear to front per storm water technical manual | |||
| UD1 | COMPLETE | 07/15/2014 | 07/15/2014 |
| Note: See comment in general notes Danny Spencer 386-569-9082 | |||
| URB | COMPLETE | 07/15/2014 | 07/15/2014 |
| ZON | COMPLETE | 07/15/2014 | 07/16/2014 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 11/25/2014 |
| REINSPECTION FEE | ¤40.00 | 11/25/2014 |
| NEW RESIDENTIAL INSPECTIONS | ¤584.00 | 08/07/2014 |
| SITE PLAN 20 | ¤20.00 | 08/07/2014 |
| SURCHARGE FS 533.721 | ¤21.40 | 08/07/2014 |
| SURCHARGE - FS 468.631 | ¤21.40 | 08/07/2014 |
| STORM WATER PERMIT FEES | ¤80.00 | 08/07/2014 |
| 3% TRANS IMPACT FEE CREDIT | (¤90.51) | 08/07/2014 |
| ADMIN FEE | ¤20.00 | 08/07/2014 |
| ELECTRIC FEE | ¤235.20 | 08/07/2014 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.33) | 08/07/2014 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤211.11 | 08/07/2014 |
| IMPACT FEE PARKS | ¤894.24 | 08/07/2014 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 08/07/2014 |
| IMPACT FEE TRANSPORTATION | ¤3,017.05 | 08/07/2014 |
| MECHANICAL FEE | ¤235.20 | 08/07/2014 |
| 3% PARKS IMPACT FEE CREDIT | (¤26.83) | 08/07/2014 |
| PLAN CHECK FEE | ¤116.80 | 08/07/2014 |
| PLUMBING FEE | ¤235.20 | 08/07/2014 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,247.93 |