I want to search for...
Permit #2014070471
Permit Details
Status: COED
| Parcel Id: 48-11-31-1710-00000-1140 |
| CONDITIONED SPACE: 3920 sqft |
| GARAGE: 1110 sqft |
| OPENED PORCH (WITH ROOF) : 828 sqft |
| OPENED PORCH (WITH ROOF) : 36 sqft |
| Total Square Footage: 5894 sqft |
| Subdivision: 2087 - ESTATES AT GRAND HAVEN PHASE II |
| Job Phone: 386-236-4133 |
| Location Address: 7 BLUE OAK LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/20/2014 |
| NOC: RECORDED |
| Applicant name: KEVIN MICHAEL MAYS |
| Owner: LYNE, LANHAM & SHARLA |
|
Address 3707 MAPLEWOOD AVENUE SUITE 200 WICHITA FALLS, TX 76308 |
| Lot: 114 |
| Contracted Stated Job Value: ¤515,363.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
INTERVEST CONSTRUCTION, INC
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
2379 BEVILLE ROAD DAYTONA BEACH, FL 32119 |
CGC1517573 (Exp: 08/31/2018) | 386-236-4133 | 386-763-7833 |
Sub Contractors
STEPHEN COURTEAUX
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
85 North Yonge Street Ormond Beach, FL 32174 |
EC13001748 (Exp: 08/31/2026) | (386) 672-4900 | 386-676-7472 |
CHRIS C KOONTZ
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
651 CARSWELL AVE Holly Hill, FL 32117 |
CAC035563 (Exp: 08/31/2024) | (386) 252-1878 | (386)252-9703 |
GARY WAYNE EVERS
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 740106 ORANGE CITY, FL 32763 |
CFC050566 (Exp: 08/31/2026) | 386-775-0909 | 386-775-0918 |
BARRY D MARTIN
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1650 N STATE STREET Bunnell, FL 32110 |
CCC033728 (Exp: 08/31/2020) | (386) 437-7700 | (386)437-7701 |
DANIEL P HUCKS
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
400 N. U.S. 1 Ormond Beach, FL 32174 |
CAC029376 (Exp: 08/31/2024) | 386-672-8494 | 386-673-7856 |
Inspection History
| Type | Request Date | Result | Inspector |
| PRE-APRON (PRE-POUR/DRIVEWAY) | 03/16/2015 | FINAL APPROVED | GLALIMA |
| Note: THIS IS A REINSPECTION PASSED ON FEB 11 2015 | |||
| FINAL APRON (AFTER POUR/DRIVEWAY) | 03/13/2015 | APPROVED | RGROSS |
| ROW FINAL | 03/13/2015 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | 03/13/2015 | FINAL APPROVED | DSPENCER |
| ROW FINAL | 03/12/2015 | CANCELLED BY APPLICANT | GLALIMA |
| FINAL SURVEY (OFFICE USE ONLY) | 03/12/2015 | APPROVED | FREODICA |
| Note: THIS IS A REINSPECTION APPROVED FOR RELEASE PER BUILDING OFFICIAL. | |||
| BLD - BUILDING FINAL | 03/10/2015 | FINAL APPROVED | DROCKWELL |
| FINAL SURVEY (OFFICE USE ONLY) | 03/05/2015 | Disapproved - NO FEE | FREODICA |
| Note: 1. Provide finished floor elevation of pool deck. 2. Provide grading elevations at the back of the pool. 3. Provide surface drainage flow pattern as the survey shows no continous flow to match with approved propose drainge. 4. Provide grading elevations at at 20-foot intervaval along the property line at the right side of the house. It appears that there is a difference of elevations of 2 to 3 ft between adjacent properties. Provide information on how the drainage flow would be accomplised. | |||
| FINAL APRON (AFTER POUR/DRIVEWAY) | 02/26/2015 | APPROVED | RGROSS |
| ELECTRIC - EARLY POWER | 02/19/2015 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 2/19/2015 11:57:58 AM CALLED FPL TO RELEASE POWER AT 1130 SPOKE WITHDELL | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 02/11/2015 | APPROVED | GLALIMA |
| PRE-APRON (PRE-POUR/DRIVEWAY) | 02/10/2015 | Disapproved -FEE REQUIRED | GLALIMA |
| Note: NO FORMED RIGHT . AND CHECK TO SEE IF IN LINE SURVEY '' REINSPECTIONS NEEDED ' FEE | |||
| U - SEWER TIE IN | 02/05/2015 | APPROVED | DSPENCER |
| GRAVITY SEWER TEST | 02/05/2015 | APPROVED | CMINI |
| LATH/BRICK/ WATER BARRIER | 01/13/2015 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION system down ok to squedule per Charlie | |||
| LATH/BRICK/ WATER BARRIER | 01/12/2015 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Inspection Resulted at 1/12/2015 12:37:30 PM STUCCO BEADING NOT COMPLETED | |||
| INSULATION | 01/09/2015 | APPROVED | DROCKWELL |
| ALL ROUGH | 01/06/2015 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 12/31/2014 | Disapproved -FEE REQUIRED | CMINI |
| Note: Inspection Resulted at 12/31/2014 1:51:26 PM MUTIPLE STRAPPING AND SUPPORTING FOR ELECTRICAL NOT READY,TRACK SLIDER ANCHORING | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/26/2014 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/25/2014 | Disapproved -FEE REQUIRED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 11/25/2014 11:46:16 AM COULD NOT SEE ANCHORS AND STRAPS AT FRONT ENTRY,NEED TO REMOVE SHEATHING TO SEE ANCHORS,COULD NOT SEE ANCHORS FOR TRUSSES A OVER FRONT ENTRY..CONTINUOUS LOAD PATH ON KNEE WALLS IN GARAGE | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/20/2014 | Disapproved -FEE REQUIRED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 11/20/2014 11:23:47 AM COULD NOT SEE ANCHORS AND STRAPS AT FRONT ENTRY,NEED TO REMOVE SHEATHING TO SEE ANCHORS,COULD NOT SEE ANCHORS FOR TRUSSES A OVER FRONT ENTRY...BUCKETS MISSING OFF OF TRUSS D2.ROUND WALL SHEATHING OK....NEED TO SHOW ANCHORS AT OVER HANG AT GARAGE AND CONTINUOUS LOAD PATH.. | |||
| WALL SHEATHING | 11/20/2014 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 11/20/2014 11:23:48 AM ROUND WALL OK CHECK REST ON REINSPECT OF ROOF SHEATHING | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/13/2014 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Inspection Resulted at 11/13/2014 3:07:47 PM RE-STRAP 5 TRUSS AT MID-POINT BEARING WALL LEFT SIDE/MANY HOLD-DOWNS NOT ANCHORED/WALL TO BLOCK 2X8``S NOT ANCHORED TO WALL/NOT READY FOR INSPECTION/INCOMPLETE INSPECTION/ | |||
| WALL SHEATHING | 11/13/2014 | APPROVED - AS NOTED | DROCKWELL |
| Note: Inspection Resulted at 11/13/2014 3:07:48 PM REMOVE SHINERS WALL SHEATHING MASTER BEDROOM-CHECK ALL AREAS | |||
| TIE BEAM / LINTEL | 10/20/2014 | APPROVED | CMINI |
| ELEV CERT-FOUNDATION APPROVAL | 10/16/2014 | APPROVED | CBENTLEY |
| FOUND SURVEY APPROVED (OFFICE) | 10/15/2014 | APPROVED | JHINDMAN |
| ELECTRIC-TUG | 10/15/2014 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 10/15/2014 10:49:45 AM CALLED FPL TO RELEASE POWER AT 10:30AM,SPOKE WITH DELL | |||
| MONOLITHIC SLAB | 10/03/2014 | APPROVED | CMINI |
| PLUMBING 1ST ROUGH UNDERGROUND | 09/25/2014 | APPROVED | CMINI |
Review History
| Department | Status | Date In | Date Out |
| PLFM | COMPLETE | 03/12/2015 | 03/16/2015 |
| SW1 | COMPLETE | 03/12/2015 | 03/12/2015 |
| Note: Released By: FREODICA | |||
| SW1 | HOLD | 03/03/2015 | 03/05/2015 |
| Note: Held By: FREODICA final survey 1. Provide finished floor elevation of pool deck. 2. Provide grading elevations at the back of the pool. 3. Provide surface drainage flow pattern as the survey shows no continous flow to match with approved propose drainge. 4. Provide grading elevations at at 20-foot intervaval along the property line at the right side of the house. It appears that there is a difference of elevations of 2 to 3 ft between adjacent properties. Provide information on how the drainage flow would be accomplised. | |||
| BLD | COMPLETE | 12/09/2014 | 12/11/2014 |
| PLFM | COMPLETE | 10/15/2014 | 10/16/2014 |
| SW1 | COMPLETE | 10/15/2014 | 10/15/2014 |
| Note: Released By: JHINDMAN foundation survey | |||
| PLFM | COMPLETE | 08/13/2014 | 08/15/2014 |
| PLFM | HOLD | 08/05/2014 | 08/12/2014 |
| Note: 1. Will the below propane tank service the residence or the pool or both? 2. Provide calculation of bouoyancy forces for underground propane tank. 3. If propane tank services the residence than the elevation certificate needs to show that information. | |||
| URB | COMPLETE | 08/05/2014 | 08/06/2014 |
| PLFM | HOLD | 07/21/2014 | 07/23/2014 |
| Note: The proposed residence will be serviced with natural gas according to the plans. If service will be provided by storage tank (above or underground), please address the following. The tank shall be installed 1-foot above base flood elevation [10.02.06, LDC] and anchored to ensure that the tank will not be displaced due to buoyancy forces and result in flood hazards. Provide calculations and detail of how the tank will be anchored to minimize threat of such hazards. Please note that the final elevation of the bottom element of the tank may become the lowest servicing equipment to the residence. If this is the result, the elevation certificate will require modification as applicable. | |||
| BLD | COMPLETE | 07/18/2014 | 07/21/2014 |
| ELEC | COMPLETE | 07/18/2014 | 07/18/2014 |
| ENGIN1 | COMPLETE | 07/18/2014 | 07/18/2014 |
| Note: No swale plan required. | |||
| MECH | COMPLETE | 07/18/2014 | 07/21/2014 |
| PLUM | COMPLETE | 07/18/2014 | 07/21/2014 |
| SW1 | COMPLETE | 07/18/2014 | 07/18/2014 |
| UD1 | COMPLETE | 07/18/2014 | 07/18/2014 |
| Note: See comments in the general notes Keith King 386-9318009 | |||
| URB | HOLD | 07/18/2014 | 07/21/2014 |
| Note: 1: Irrigation plan Must indicate re-use water is the source and must use the guidelines set in the technical manual page 42, paragraph R. 2:Schefflera shrubbery can not be used as the primary foundation planting and must be replaced front and left rear. | |||
| ZON | COMPLETE | 07/18/2014 | 07/21/2014 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 03/03/2015 |
| REINSPECTION FEE | ¤40.00 | 03/03/2015 |
| REINSPECTION FEE | ¤40.00 | 03/03/2015 |
| REINSPECTION FEE | ¤40.00 | 03/03/2015 |
| REINSPECTION FEE | ¤40.00 | 03/03/2015 |
| REINSPECTION FEE | ¤40.00 | 03/03/2015 |
| NEW RESIDENTIAL INSPECTIONS | ¤1,032.00 | 08/20/2014 |
| SITE PLAN 20 | ¤20.00 | 08/20/2014 |
| SURCHARGE FS 533.721 | ¤35.51 | 08/20/2014 |
| SURCHARGE - FS 468.631 | ¤35.51 | 08/20/2014 |
| STORM WATER PERMIT FEES | ¤80.00 | 08/20/2014 |
| 3% TRANS IMPACT FEE CREDIT | (¤90.51) | 08/20/2014 |
| ADMIN FEE | ¤20.00 | 08/20/2014 |
| ELECTRIC FEE | ¤369.60 | 08/20/2014 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.33) | 08/20/2014 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤211.11 | 08/20/2014 |
| IMPACT FEE PARKS | ¤894.24 | 08/20/2014 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 08/20/2014 |
| IMPACT FEE TRANSPORTATION | ¤3,017.05 | 08/20/2014 |
| MECHANICAL FEE | ¤369.60 | 08/20/2014 |
| 3% PARKS IMPACT FEE CREDIT | (¤26.83) | 08/20/2014 |
| PLAN CHECK FEE | ¤206.40 | 08/20/2014 |
| PLUMBING FEE | ¤369.60 | 08/20/2014 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤10,376.95 |