Permit #2014070540

Permit Details

Status: COED

CONDITIONED SPACE: 26460 sqft
OPENED PORCH (WITH ROOF) : 7379 sqft
Total Square Footage: 33839 sqft
Subdivision: 2148 - TOWN CENTER PHASE 8
Job Phone: 407-741-8500
Location Address: 445 LANDING BLVD BLDG 7
Type: BM - BUILDING MULTI - APARTMENT
Issue Date: 11/19/2014
NOC: RECORDED
Applicant name: SCOTT W CULP
Owner: FLORIDA LANDMARK COMMUNITIES LLC

Address

145 CITY PLACE

PALM COAST, FL 32164

Address

SUITE 300

PALM COAST, FL 32164

Contracted Stated Job Value: ¤1,922,005.00
Job Description: BUILDING 7 4-STORY APARTMENTS/OCCUPANCY R-2/24 UNITS
Type: CN

Contractor

CPG CONSTRUCTION LLP
Status Location Address State License Number Phone Fax
CANCEL

200 E CANTON AVE # 102

WINTER PARK, FL 32789

CGC1512998 (Exp: 08/31/2016) 407-741-8500 407-643-2551

Sub Contractors

RANCE F BORDERICK
Status Location Address State License Number Phone Fax
ACTIVE

430 WEST DRIVE

ALTAMONTE SPRINGS, FL 32714

EC0000981 (Exp: 08/31/2026) (407)788-3500 407-788-2007
DAVID A CROSON
Status Location Address State License Number Phone Fax
CANCEL

31550 COUNTY ROAD 437

SORRENTO, FL 32776

CFC1426109 (Exp: 08/31/2022) 352-729-7100 352-735-0623
JOSEPH RICHARD CASSIDY JR
Status Location Address State License Number Phone Fax
CANCEL

17304 PHIL C PETERS RD

WINTER GARDEN, FL 34787

CCC1327385 (Exp: 08/31/2020) 407-654-4426 (407)654-4307
JOHN MAXEN BARTKOVICH
Status Location Address State License Number Phone
ACTIVE

818 SHADOWMOSS DR

WINTERGARDEN, FL 32787

CAC1815793 (Exp: 08/31/2026) 407-886-3729

Inspection History

Type Request Date Result Inspector
FIRE FINAL 05/22/2015 APPROVED JHINDMAN
Note: THIS IS A REINSPECTION
U - UTILITY COMMERCIAL FINAL 05/22/2015 FINAL APPROVED DSPENCER
BUILDING FINAL 05/21/2015 FINAL APPROVED CMINI
FIRE FINAL 05/21/2015 Disapproved -FEE REQUIRED JHINDMAN
Note: 1. provide fire extinguishers in the units. 2 seal all penetrations in the rated assemblies. 3. controlled access doors must seal when closed.
PLUMBING FINAL 05/21/2015 APPROVED CMINI
Note: THIS IS A REINSPECTION
HVAC FINAL 05/21/2015 APPROVED CMINI
ELECTRIC FINAL 05/21/2015 APPROVED CMINI
ELECTRIC - EARLY POWER 05/01/2015 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 5/1/2015 2:40:10 PM CALLED FPL TO RELEASE POWER ON FLOORS 3 AND 4, SPOKE WITH SUSAN
ELECTRIC - EARLY POWER 04/29/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 4/29/2015 2:56:46 PM CALLED FPL TO RELEASE POWER ON UNITS 201-206, SPOKE WITH SUSAN
ELECTRIC - EARLY POWER 04/28/2015 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 4/28/2015 2:22:42 PM 1ST FLOOR UNITS 101-106, CALLED FPL TO RELEASE POWER, SPOKE WITH SUSAN
ELECTRIC TEMP POLE 04/23/2015 APPROVED RMARTIN
Note: THIS IS A REINSPECTION Inspection Resulted at 4/23/2015 9:49:31 AM SPOKE TO DELL FPL 9:45AM RELEASED POWER
ELECTRIC TEMP POLE 04/22/2015 CANCELLED BY APPLICANT RMARTIN
SHEARWALL 04/06/2015 APPROVED CMINI
SHEARWALL 04/02/2015 APPROVED - AS NOTED DROCKWELL
Note: Inspection Resulted at 4/2/2015 2:28:29 PM 3RD FLOOR DRYWALL SCREW OFF
SHEARWALL 03/31/2015 APPROVED - AS NOTED DROCKWELL
Note: Inspection Resulted at 3/31/2015 12:22:02 PM DRYWALL SCREW SPACING
SHEARWALL 03/30/2015 APPROVED - AS NOTED DROCKWELL
Note: Inspection Resulted at 3/30/2015 2:37:16 PM 1ST FLOOR SHEARWALLS OK
FIREWALL NAILING 03/27/2015 APPROVED - AS NOTED DROCKWELL
Note: THIS IS A REINSPECTION Inspection Resulted at 3/27/2015 2:23:52 PM C-CHANEL
FIREWALL NAILING 03/25/2015 CANCELLED BY APPLICANT CMINI
Note: THIS IS A REINSPECTION
FRAMING 03/25/2015 APPROVED CMINI
ELECTRIC 2ND ROUGH 03/25/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION..need to look at data room
HVAC ROUGH 03/25/2015 APPROVED CMINI
PLUMBING 2ND ROUGH 03/25/2015 APPROVED CMINI
FIREWALL NAILING 03/24/2015 CANCELLED BY APPLICANT DROCKWELL
Note: THIS IS A REINSPECTION
INSULATION 03/24/2015 APPROVED - AS NOTED DROCKWELL
Note: Inspection Resulted at 3/24/2015 2:53:54 PM BUILDING 7 3RD AND 4TH FLOORS-BATT INSULATION APPROVED
INSULATION 03/23/2015 APPROVED - AS NOTED DROCKWELL
Note: THIS IS A REINSPECTION Inspection Resulted at 3/23/2015 2:18:51 PM BLDG 7 3RD FLOOR OK TO ROCK
FIREWALL NAILING 03/23/2015 CANCELLED BY APPLICANT DROCKWELL
FRAMING 03/20/2015 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/20/2015 2:32:54 PM 4TH FLOOR UNITS
HVAC ROUGH 03/20/2015 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/20/2015 2:32:55 PM 4TH FLOOR UNITS
PLUMBING 2ND ROUGH 03/20/2015 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/20/2015 2:32:55 PM 4TH FLOOR UNITS
ELECTRIC 2ND ROUGH 03/20/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/20/2015 2:32:56 PM 4TH FLOOR UNITS
INSULATION 03/20/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/20/2015 2:32:54 PM 2ND FLOOR UNITS
INSULATION 03/19/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 3/19/2015 2:30:05 PM 1ST FLOOR INSULATION
ELECTRIC 2ND ROUGH 03/19/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/19/2015 2:30:07 PM 3RD FLOOR UNITS
HVAC ROUGH 03/19/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/19/2015 2:30:07 PM 3RD FLOOR UNITS
PLUMBING 2ND ROUGH 03/19/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/19/2015 2:30:08 PM 3RD FLOOR UNITS
FRAMING 03/19/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/19/2015 2:30:06 PM 3RD FLOOR UNITS
FRAMING 03/18/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/18/2015 2:09:03 PM 2ND FLOOR UNITS
PLUMBING 2ND ROUGH 03/18/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/18/2015 2:09:04 PM 2ND FLOOR UNITS
HVAC ROUGH 03/18/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/18/2015 2:09:03 PM 2ND FLOOR UNITS
ELECTRIC 2ND ROUGH 03/18/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/18/2015 2:09:04 PM 2ND FLOOR UNITS
ELECTRIC 2ND ROUGH 03/17/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 3/17/2015 2:30:53 PM 1ST FLOOR
HVAC ROUGH 03/17/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 3/17/2015 2:30:52 PM 1ST FLOOR
PLUMBING 2ND ROUGH 03/17/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/17/2015 2:30:53 PM 1ST FLOOR
FRAMING 03/17/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/17/2015 2:30:54 PM 1ST FLOOR
FRAMING 03/16/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 3/16/2015 2:56:37 PM ELEVATOR ROOF FRAMING
ROOF SHEATHING / BRACE / TIE DOWN 03/16/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 3/16/2015 2:56:33 PM ENGINEERING AND TIE DOWNS
PLUMBING 2ND ROUGH 03/12/2015 PARTIALLY APPROVED JHINDMAN
Note: sanitary test
PLUMBING FINAL 03/12/2015 CANCELLED BY APPLICANT JHINDMAN
SECOND FLOOR SLAB 03/06/2015 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 3/6/2015 2:27:17 PM ELAVATOR
EXTERIOR STRAP/CLIP 03/06/2015 APPROVED - AS NOTED DROCKWELL
Note: THIS IS A REINSPECTION Inspection Resulted at 3/6/2015 1:15:18 PM PORCH STRAPS AND CLIPS 4TH FLOOR BUILDING 7
ELECTRIC 1ST ROUGH 03/05/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/5/2015 3:17:19 PM FIRE CONTROL CONDUIT UNDERGROUND
TIE DOWN 03/04/2015 APPROVED - AS NOTED DROCKWELL
Note: Inspection Resulted at 3/4/2015 12:31:30 PM THEADED ROD SYSTEM APPROVED
EXTERIOR STRAP/CLIP 02/27/2015 CANCELLED BY APPLICANT CMINI
Note: THIS IS A REINSPECTION
FIREWALL 02/27/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 2/27/2015 12:41:20 PM BREEZWAYS FLOORS 1-4
EXTERIOR STRAP/CLIP 02/25/2015 Disapproved -FEE REQUIRED DROCKWELL
Note: THIS IS A REINSPECTION Inspection Resulted at 2/25/2015 2:37:54 PM STAIRWELL FRAMING DOES NOT MATCH APPROVED PLANS.PROVIDE APPROVED REVISIONS/HOLD-DOWN REQUIREMENTS
WINDOW NAILING 02/25/2015 APPROVED DROCKWELL
GRAVITY SEWER 02/24/2015 APPROVED CMINI
U - SEWER TIE IN 02/24/2015 APPROVED DSPENCER
ROOF SHEATHING / BRACE / TIE DOWN 02/20/2015 APPROVED - AS NOTED DROCKWELL
Note: Inspection Resulted at 2/20/2015 10:51:17 AM BUILDING 7 SHEATHING ONLY-APPROVED
EXTERIOR WALL SHEATHING / SHEARWALL 02/19/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 2/19/2015 12:27:59 PM 4TH FLOOR EXTERIOR NAILING
EXTERIOR STRAP/CLIP 02/19/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 2/19/2015 12:28:00 PM COLUMN STRAPING 4TH FL
EXTERIOR WALL SHEATHING / SHEARWALL 02/16/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 2/16/2015 2:46:37 PM 2ND AND 3RD FL SHEATHING NAIL PATTERN
EXTERIOR STRAP/CLIP 02/16/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 2/16/2015 2:46:38 PM 2ND AND 3RD FLOOR COLUMN STRAPS
RAKE BEAM 02/16/2015 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 2/16/2015 2:46:37 PM TOP OF SEPERATION WALL
EXTERIOR STRAP/CLIP 02/12/2015 APPROVED - AS NOTED DROCKWELL
Note: Inspection Resulted at 2/12/2015 10:53:03 AM BALCONY 6X6 POST STRAPPING 1ST FLOOR
EXTERIOR WALL SHEATHING / SHEARWALL 02/12/2015 APPROVED - AS NOTED DROCKWELL
Note: Inspection Resulted at 2/12/2015 10:53:03 AM 1ST FLOOR WALL SHEATHING OK-SHINERS REMOVED-UNIVERSAL REPORT ON FILE
ELECTRIC 1ST ROUGH 02/03/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 2/3/2015 1:54:27 PM UNDERGROUND FOR PRIMARY FROM TRANSFORMER TO BUILDING
DOWN CELL 01/30/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 1/30/2015 10:21:09 AM BUILDING WALL BLOCK
LINTEL 01/30/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 1/30/2015 10:21:09 AM 4TH FLOOR AND ELEVATOR SHAFT
ELECTRIC TEMP POLE 01/28/2015 APPROVED CMINI
SHEARWALL 01/21/2015 APPROVED - AS NOTED DROCKWELL
Note: Inspection Resulted at 1/21/2015 3:12:35 PM 3RD FLOOR PARTIAL SHEERWALL.APPROVED.
SHEARWALL 01/08/2015 APPROVED - AS NOTED DROCKWELL
Note: Inspection Resulted at 1/9/2015 7:23:17 AM THRESHOLD INSPECTION REPORT ON FILE
MONOLITHIC SLAB 12/23/2014 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 12/23/2014 12:16:19 PM OK PER REVISION
ELECTRIC OTHER 12/22/2014 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 12/22/2014 3:21:57 PM UNDER SLAB
MONOLITHIC SLAB 12/22/2014 Disapproved -FEE REQUIRED CMINI
Note: Inspection Resulted at 12/22/2014 3:21:59 PM NEED REVISION FOR FOOTER CHANGE DETAIL
PLUMBING 1ST ROUGH 12/19/2014 APPROVED JHINDMAN
Note: THIS IS A REINSPECTION
PLUMBING 1ST ROUGH 12/18/2014 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 12/18/2014 2:14:08 PM PARTIAL ONLY
FOOTER 11/21/2014 APPROVED - AS NOTED DROCKWELL
Note: Inspection Resulted at 11/21/2014 2:36:49 PM ELEVATOR PIT FOUNDATION WALLS PER PLAN-UNIVERSALS REPORT FILED
FOOTER 11/20/2014 APPROVED - AS NOTED DROCKWELL
Note: PER JEFF Inspection Resulted at 11/20/2014 11:13:12 AM ELEVATOR PIT FOUNDATION BOTH BUILDINGS.FOOTER ONLY.TO PLAN AND CODE.

Review History

Department Status Date In Date Out
ELEC COMPLETE 05/20/2015 05/21/2015
ELEC COMPLETE 03/18/2015 03/19/2015
BLD COMPLETE 03/11/2015 03/16/2015
ELEC HOLD 03/11/2015 03/16/2015
Note: 1. Page E 3.1 was not included with the current correction pages.
BLD HOLD 02/20/2015 03/04/2015
Note: 1. On page 5.2 (4) c the dryer vent cannot take up more than 40 percent of the plate. 2010 FBC 2308.9.10.
ELEC HOLD 02/20/2015 03/05/2015
Note: 1. Dwelling units must have 20 amp circuits for small appliance circuits, laundry circuits, dining circuits and bathroom circuits per 2008 NEC 210.11 C.and 210.52 B. 2. Page E4.2 is for building 8 This permit is only for building 7.
MECH COMPLETE 02/20/2015 03/04/2015
Note: Revision 5 - owner revision dated 2-16-15
PLUM COMPLETE 02/20/2015 03/04/2015
Note: Revision 5 - owner revision dated 2-16-15. Sheet P2.1a - revised condensate drain piping to drain indirectly to storm drain.
BLD COMPLETE 02/11/2015 02/13/2015
BLD COMPLETE 02/10/2015 02/11/2015
MECH COMPLETE 02/05/2015 02/06/2015
PLUM COMPLETE 02/05/2015 02/06/2015
BLD HOLD 02/05/2015 02/05/2015
Note: 1. The detail for U341 was not submitted with the corrections.
BLD HOLD 01/22/2015 01/29/2015
Note: 1. Provide U. L. system detail that allows for the alternate intersection for the single/double wall on page S6.1.
ELEC COMPLETE 01/22/2015 01/28/2015
MECH HOLD 01/22/2015 01/27/2015
Note: Revision 4 dated 1-14-15 shows deletion of natural ventilation but on sheet M3.4 ventilation calculation still shows. Clarify and submit correction per 2010 FBC 107.2.1.
PLUM HOLD 01/22/2015 01/27/2015
Note: Revision 4 dated 1-14-15, sheet P5.1. Drywell detail still shows but summary of changes show deletion. Coordinate and submit correction per 2010 FBC 107.2.1.
BLD COMPLETE 12/22/2014 12/22/2014
ZON COMPLETE 11/18/2014 11/18/2014
MECH COMPLETE 11/06/2014 11/07/2014
Note: Rev - changed energy calculations.
PLUM COMPLETE 11/06/2014 11/07/2014
Note: Revision 1b dated 11-03-14 - relocated floor drains at breezeway
ZON HOLD 11/06/2014 11/13/2014
Note: 1. Please revise sheets A6.2a and A6.2b to include a note that the contractor should refer to the approved color elevations attached to the Site Plan Development Order plans for color manufacturer, color name and color locations on the building.
BLD COMPLETE 11/06/2014 11/12/2014
FI1 COMPLETE 11/06/2014 11/07/2014
ELEC COMPLETE 10/23/2014 10/24/2014
MECH HOLD 10/23/2014 10/24/2014
Note: Provide revised energy calculations to affected units due to changes for clarification per 2010 FBC 107.2.1.
PLUM HOLD 10/23/2014 10/24/2014
Note: 1. Provide penetration details of hallway floor drains through floors and wall assembly per 2010 FBC 107.2.1.
ZON HOLD 10/22/2014 10/22/2014
Note: Development Order for this permit is under a modification review. The Development Order modification consist of building footprint changes and revised elevations that will affect the building permit plans.
UD1 COMPLETE 10/22/2014 10/28/2014
BLD HOLD 10/22/2014 10/23/2014
Note: 1. Provide details for the penetration of the hallway floor/ceiling assembly by the floor drain. 2. Provide a detail for the 3 inch floor drain penetrations thru the tenent walls including how the notching or boring into the top plates is to be achieved. J. Hindman 986-3784.
FI1 HOLD 10/22/2014 10/23/2014
Note: 1. Provide details for the penetration of the hallway floor/ceiling assembly by the floor drain. 2. Provide a detail for the 3 inch floor drain penetrations thru the tenent walls including how the notching or boring into the top plates is to be achieved. J. Hindman 986-3784.
ZON HOLD 09/02/2014 09/03/2014
Note: 1. Provide executed Development Order. 2. Provide an executed access agreement. 3. Provide an updated site plan. 4. Correct the permit application to reflect the correct number of floors for this building.
BLD HOLD 09/02/2014 09/30/2014
Note: 1. Provide floor and roof truss layouts from the roof truss engineering company. J. Hindman 986-3784.
FI1 COMPLETE 09/02/2014 09/25/2014
UD1 HOLD 09/02/2014 09/11/2014
Note: 26.7 PSI is not a reasonable level of service. The system pressure varies from 60 psi to 65psi. Booster pumps will likely be required for 3rd and 4th floors
BLD HOLD 07/22/2014 07/24/2014
Note: 1. The set of plans submitted has 3 and 4 story details. The permit application is for a 3 story building. Provide a set of plans that corresponds to the building type and permit. 2. Provide a design with an NFPA 13 sprinkler system due to the area and height modification increase per 2010 FBC 506.3 and 903.3.1.1. 3. Provide an exterior wall design that complies with 2010 FBC table 601. A 3x4 wall can only support two floors and a roof/ceiling per2010 FBC table 2308.9.1. 4. Provide an exterior rated wall design that matches the U.L. rated system. U.L. 356 does not show 3x4 studs per U.L. and 2010 FBC 107.2.1. Additional comments may be required after the above comments are addressed. J. Hindman 986-3784.
ELEC COMPLETE 07/22/2014 07/22/2014
ENGIN1 COMPLETE 07/22/2014 07/23/2014
FI1 HOLD 07/22/2014 07/24/2014
Note: 1. The set of plans submitted has 3 and 4 story details. The permit application is for a 3 story building. Provide a set of plans that corresponds to the building type and permit. 2. Provide a design with an NFPA 13 sprinkler system due to the area and height modification increase per 2010 FBC 506.3 and 903.3.1.1. 3. Provide an exterior wall design that complies with 2010 FBC table 601. A 3x4 wall can only support two floors and a roof/ceiling per2010 FBC table 2308.9.1. 4. Provide an exterior rated wall design that matches the U.L. rated system. U.L. 356 does not show 3x4 studs per U.L. and 2010 FBC 107.2.1. Additional comments may be required after the above comments are addressed. J. Hindman 986-3784.
MECH COMPLETE 07/22/2014 07/22/2014
PLUM COMPLETE 07/22/2014 07/22/2014
UD1 HOLD 07/22/2014 08/01/2014
Note: Provide data showing the 3rd and 4th floors water service will function at a reasonable level of service
ZON HOLD 07/22/2014 07/22/2014
Note: 1. Provide executed Development Order. 2. Provide an executed access agreement. 3. Provide an updated site plan. 4. Provide an updated address map. 5. Correct the permit application to reflect the correct number of floors for this building.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 05/27/2015
REINSPECTION FEE ¤40.00 05/27/2015
REINSPECTION FEE ¤40.00 05/27/2015
REVISION ¤40.00 05/27/2015
REVISION ¤40.00 05/27/2015
REVISION ¤40.00 05/27/2015
REVISION ¤40.00 05/27/2015
REVISION ¤40.00 05/27/2015
REVISION ¤40.00 05/27/2015
REVISION ¤40.00 05/27/2015
REVISION ¤40.00 05/27/2015
REVISION ¤40.00 05/27/2015
SURCHARGE FS 533.721 ¤412.88 11/19/2014
SURCHARGE - FS 468.631 ¤412.88 11/19/2014
3% TRANS IMPACT FEE CREDIT (¤2,027.57) 11/19/2014
ADMIN COMMERCIAL ¤60.00 11/19/2014
ELECTRIC FEE ¤1,997.40 11/19/2014
3% FIRE IMPACT FEE CREDIT (¤152.00) 11/19/2014
IMPACT FEE FIRE NONRESIDENTIAL ¤5,066.64 11/19/2014
IMPACT FEE PARKS ¤20,381.76 11/19/2014
FIRE PLANS REVIEW ¤338.39 11/19/2014
IMPACT FEE TRANSPORTATION ¤67,585.68 11/19/2014
MECHANICAL FEE ¤1,997.40 11/19/2014
PERMIT FEE ¤17,759.50 11/19/2014
3% PARKS IMPACT FEE CREDIT (¤611.45) 11/19/2014
PLAN CHECK FEE ¤3,713.35 11/19/2014
PLUMBING FEE ¤1,997.40 11/19/2014
Fees Total Due: ¤0.00 Total Paid: ¤119,412.26