Permit #2014070586

Permit Details

Status: COED

CONDITIONED SPACE: 29516 sqft
CONDITIONED SPACE: 2804 sqft
OPENED PORCH (WITH ROOF) : 12566 sqft
Total Square Footage: 44886 sqft
Subdivision: 2148 - TOWN CENTER PHASE 8
Job Phone: 407-741-8500
Location Address: 465 LANDING BLVD BLDG 8
Type: BM - BUILDING MULTI - APARTMENT
Issue Date: 11/19/2014
NOC: RECORDED
Applicant name: SCOTT W CULP
Owner: FLORIDA LANDMARK COMMUNITIES LLC

Address

145 CITY PLACE

PALM COAST, FL 32164

Address

SUITE 300

PALM COAST, FL 32164

Contracted Stated Job Value: ¤2,161,304.00
Job Description: BUILDING 8- 4 STORY APTS/OCCUPANCY R-2/ 37 UNITS & CLUB SPACE
Type: CN

Contractor

CPG CONSTRUCTION LLP
Status Location Address State License Number Phone Fax
CANCEL

200 E CANTON AVE # 102

WINTER PARK, FL 32789

CGC1512998 (Exp: 08/31/2016) 407-741-8500 407-643-2551

Sub Contractors

RANCE F BORDERICK
Status Location Address State License Number Phone Fax
ACTIVE

430 WEST DRIVE

ALTAMONTE SPRINGS, FL 32714

EC0000981 (Exp: 08/31/2026) (407)788-3500 407-788-2007
DAVID A CROSON
Status Location Address State License Number Phone
CANCEL

31550 COUNTY ROAD 437

SORRENTO, FL 32776

CFC1426109 (Exp: 08/31/2022) 352-729-7100
JOSEPH RICHARD CASSIDY JR
Status Location Address State License Number Phone Fax
CANCEL

17304 PHIL C PETERS RD

WINTER GARDEN, FL 34787

CCC1327385 (Exp: 08/31/2020) 407-654-4426 (407)654-4307

Inspection History

Type Request Date Result Inspector
PLUMBING FINAL 05/01/2015 APPROVED CMINI
Note: THIS IS A REINSPECTION
HVAC FINAL 05/01/2015 APPROVED CMINI
Note: THIS IS A REINSPECTION
ELECTRIC FINAL 05/01/2015 APPROVED CMINI
Note: THIS IS A REINSPECTION
BUILDING FINAL 05/01/2015 FINAL APPROVED CMINI
Note: THIS IS A REINSPECTION
FIRE FINAL 05/01/2015 APPROVED JHINDMAN
U - UTILITY COMMERCIAL FINAL 04/30/2015 APPROVED DSPENCER
Note: THIS IS A REINSPECTION
FIRE FINAL 04/30/2015 CANCELLED BY APPLICANT JHINDMAN
BUILDING FINAL 04/30/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 4/30/2015 3:45:44 PM NO CLUB HOUSE JUST UNITS ALL FLOORS OK,
ELECTRIC FINAL 04/30/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 4/30/2015 3:45:44 PM NO CLUB HOUSE JUST UNITS ALL FLOORS OK,
HVAC FINAL 04/30/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 4/30/2015 3:45:43 PM NO CLUB HOUSE JUST UNITS ALL FLOORS OK,
PLUMBING FINAL 04/30/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 4/30/2015 3:45:43 PM NO CLUB HOUSE JUST UNITS ALL FLOORS OK,
PLUMBING FINAL 04/29/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 4/29/2015 2:48:51 PM 2ND FLOOR AND PARTIAL 1ST FLOOR
HVAC FINAL 04/29/2015 Disapproved -FEE REQUIRED CMINI
Note: Inspection Resulted at 4/29/2015 2:48:52 PM MOCP RATING ON C.U. CALLING FOR 20 AMP BREAKER, 25 AMP IS INSTALLED..FBC.R. M1303
ELECTRIC FINAL 04/29/2015 Disapproved -FEE REQUIRED CMINI
Note: Inspection Resulted at 4/29/2015 2:48:52 PM ARCH FAULT BREAKERS MISSING .NEC 210.12B ALL OUTLETS IN KITCHENS SHALL BE GFCI PROTECTED NEC210.52.. GFCI IDENTIFICATION ON OUTLETS NEEDED NEC 406.D SMOKE DETECTOR NOT WORKING UNIT 210..
BUILDING FINAL 04/29/2015 Disapproved -FEE REQUIRED CMINI
Note: Inspection Resulted at 4/29/2015 2:48:53 PM OPENINGS AND PENETRATIONS THROUGH WALLS OR CEILINGS SHALL NOT BE PERMITTED FBC. R302.5, GAURD RAILS NOT COMPLETE. SHOWERS NOT COMPLETE.
FIRE FINAL 04/29/2015 CANCELLED BY APPLICANT JHINDMAN
LDSC- LANDSCAPE FINAL 04/29/2015 APPROVED - AS NOTED WBUTLER
Note: Stage 1 of Project-Building 8 Permit 2014070586 4/29/15 1. Along the northern portion of the development, there was some erosion into the wetland. Need to dig out and remove. Also, not related to this particular stage of the inspection but very important, need to get silt fence back up at the toe of the slopes behind all of the unfinished buildings and remove all silt that has washed into the wetland, particularly behind stages 2, 3 and 4. 2. General note to remove mulch from the base of the shrubs and off the trunks of the trees. 3. Need to add a fence screen to hide the HVAC units at the northwest corner of building 8. 4. Need to mulch and finish any planting in the front of the building where the backflow preventer was previously shown on the plans. 5. In the courtyard area, need to raise the magnolia tree as it is planted too deep. 6. Need to mulch the small rectangular area at the southwest corner of the maintenance building. 7. Finish planting, sodding and irrigating the landscape island behind building 8. 8. Not all trees are staked. Need to finish staking. 9. Landscape and irrigation around the dumpster, compactor and the small island in front has not been done. Need to finish this area up. 10. Make sure all the straps on the rootballs of the trees have been cut and the burlap pulled off the top of the rootballs. 11. Bike rack not installed behind building 8. 12. Need flush plugs at the end of all drip line zones. Install in a 6" valve box and show measurements from two fixed points on the as-built for future location reference. 13. Zone numbering on the as-built plan needs to match the zone numbering in the field. These punch list items will be reinspected at the next requested stage inspection. Stage 2 will not be approved if these items have not been addressed.
U - UTILITY COMMERCIAL FINAL 04/29/2015 Disapproved - NO FEE DSPENCER
Note: Inspection Resulted at 4/29/2015 10:41:17 AM THIS BUILDING UTILITY FFINAL INSPECTION CANNOT BE APPROVED UNTIL THE LANDINGS BLVD UTILITY FINAL IS COMPLETED AND THE WATER SYSTEM IS OWNED BY THE CITY DISTRABUTION SYSTEM SO WE CAN PROVIDE WATER.OTHERWISE THIS BUILDING UTILITY FINAL INSPECTION WOULD BE APPROVED. RESUBMIT FOR INSPECTION WHEN WATER IS AVAILABLE.
ELECTRIC - EARLY POWER 04/17/2015 APPROVED RMARTIN
Note: THIS IS A REINSPECTION Inspection Resulted at 4/20/2015 9:19:59 AM CALLED FPL SPOKE TO DELL 9:00 AM POWER RELEASE
ELECTRIC - EARLY POWER 04/17/2015 APPROVED RMARTIN
Note: THIS IS A REINSPECTION Inspection Resulted at 4/20/2015 9:20:00 AM CALLED FPL SPOKE TO DELL 9:OO AM POWER RELEASED
ELECTRIC - EARLY POWER 04/16/2015 Disapproved -FEE REQUIRED CMINI
Note: Inspection Resulted at 4/16/2015 2:04:15 PM NOT READY
ELECTRIC - EARLY POWER 04/15/2015 Disapproved -FEE REQUIRED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 4/15/2015 12:28:08 PM NOT READY, NEED TO SAFE OFF ALL ELECTRICAL
ELECTRIC - EARLY POWER 04/15/2015 PARTIALLY APPROVED RMARTIN
Note: THIS IS A REINSPECTION/ TRICITY ELECTRIC COMP REQUESTED AFTER HOUR INSPECTION FOR TODAY. Inspection Resulted at 4/17/2015 7:37:41 AM SPOKE TO SUSAN AT FPL 2:38 RELEASED 2ND AND 3RD FLOOR
ELECTRIC - EARLY POWER 04/14/2015 Disapproved -FEE REQUIRED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 4/14/2015 10:12:40 AM NOT READY, STILL OPEN PANELS AND OPEN CONDUCTERS
ELECTRIC - EARLY POWER 04/13/2015 Disapproved -FEE REQUIRED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 4/13/2015 1:53:15 PM NOT READY
ELECTRIC - EARLY POWER 04/10/2015 PARTIALLY APPROVED RMARTIN
Note: Inspection Resulted at 4/10/2015 1:58:18 PM INSPECTED UNITS 101-106 AND 110
ELECTRIC 2ND ROUGH 04/08/2015 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 4/8/2015 2:00:51 PM WIRES FIRECAULKED THRU WALL
EXTERIOR WALL SHEATHING / SHEARWALL 03/25/2015 APPROVED CMINI
SHEARWALL 03/23/2015 APPROVED DROCKWELL
Note: THIS IS A REINSPECTION
FRAMING 03/18/2015 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 3/18/2015 2:09:01 PM FRAMING COMPLETE ON BUILDING 8
INSULATION 03/18/2015 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/18/2015 2:09:00 PM INSULATION COMPLETE ON BUILDING 8
ELECTRIC 2ND ROUGH 03/18/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 3/18/2015 2:09:02 PM NEED TO LOOK AT COMMUNICATION ROOM
HVAC ROUGH 03/18/2015 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 3/18/2015 2:09:02 PM HVAC COMPLETE ON BUILDING 8
PLUMBING 2ND ROUGH 03/18/2015 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 3/18/2015 2:09:01 PM PLUMBING COMPLETE ON BUILDING 8
SHEARWALL 03/17/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/17/2015 2:30:52 PM 3RD FLOOR
ROOF SHEATHING / BRACE / TIE DOWN 03/16/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/16/2015 2:56:33 PM ELEVATOR ROOF
FIREWALL NAILING 03/16/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/16/2015 2:56:36 PM 2ND LAYER SHEAR WALL DRYWALL
FRAMING 03/16/2015 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/16/2015 2:56:35 PM CLUB HOUSE
FIREWALL 03/16/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/16/2015 2:56:36 PM 2ND LAYER SHEAR WALL DRYWALL
PLUMBING 2ND ROUGH 03/16/2015 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/16/2015 2:56:34 PM CLUB HOUSE
HVAC ROUGH 03/16/2015 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/16/2015 2:56:34 PM CLUB HOUSE
ELECTRIC 2ND ROUGH 03/16/2015 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/16/2015 2:56:35 PM CLUB HOUSE
INSULATION 03/13/2015 PARTIALLY APPROVED JHINDMAN
Note: THIS IS A REINSPECTION Inspection Resulted at 3/13/2015 3:09:23 PM 4TH FLOOR WALLS
INSULATION 03/12/2015 CANCELLED BY APPLICANT JHINDMAN
Note: THIS IS A REINSPECTION
INSULATION 03/11/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/11/2015 2:51:08 PM 3RD FLOOR
FIREWALL 03/11/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/11/2015 2:51:06 PM 1ST FLOOR SEPERATION WALLS
FRAMING 03/11/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/11/2015 2:51:06 PM 4TH FL M,E,PS
ELECTRIC 2ND ROUGH 03/11/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/11/2015 2:51:07 PM 4TH FL M,E,PS
HVAC ROUGH 03/11/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/11/2015 2:51:07 PM 4TH FL M,E,PS
PLUMBING 2ND ROUGH 03/11/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/11/2015 2:51:08 PM 4TH FL M,E,PS
PLUMBING 2ND ROUGH 03/10/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/10/2015 3:16:59 PM 3RD FLOOR MEPS
HVAC ROUGH 03/10/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/10/2015 3:16:59 PM 3RD FLOOR MEPS
ELECTRIC 2ND ROUGH 03/10/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/10/2015 3:16:58 PM 3RD FLOOR MEPS
INSULATION 03/10/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/10/2015 3:16:57 PM 2ND FLOOR INSULATION
INSULATION 03/09/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 3/9/2015 10:58:33 AM 1ST FL INSULATION
FRAMING 03/09/2015 PARTIALLY APPROVED CMINI
FIREWALL NAILING 03/09/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/9/2015 10:58:34 AM C-CHANNEL 1ST FLOOR CEILING
ELECTRIC 2ND ROUGH 03/09/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION
HVAC ROUGH 03/09/2015 CANCELLED BY APPLICANT CMINI
Note: THIS IS A REINSPECTION
PLUMBING 2ND ROUGH 03/09/2015 CANCELLED BY APPLICANT CMINI
Note: THIS IS A REINSPECTION
PLUMBING 2ND ROUGH 03/06/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/6/2015 2:27:18 PM 2ND FLOOR UNITS
HVAC ROUGH 03/06/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/6/2015 2:27:18 PM 2ND FLOOR UNITS
ELECTRIC 2ND ROUGH 03/06/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/6/2015 2:27:19 PM 2ND FLOOR UNITS
SECOND FLOOR SLAB 03/06/2015 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 3/6/2015 2:27:17 PM ELAVATOR
ELECTRIC 2ND ROUGH 03/05/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 3/5/2015 3:17:20 PM 1STFLOOR OK , NEED REPAIR REVISION ON OVER BORING OF STRUCTURAL STUDS IN UNIT 103
HVAC ROUGH 03/05/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/5/2015 3:17:19 PM 1ST FLOOR
PLUMBING 2ND ROUGH 03/05/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/5/2015 3:17:18 PM 1ST FLOOR
FRAMING 03/05/2015 APPROVED - AS NOTED DROCKWELL
Note: Inspection Resulted at 3/5/2015 10:31:30 AM TRUSS REPAIR APPROVED
ALL ROUGH 03/05/2015 CANCELLED BY INSPECTOR CMINI
Note: Inspection Resulted at 3/5/2015 3:17:18 PM N/A
PLUMBING 2ND ROUGH 03/04/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/4/2015 1:45:18 PM DWV PRESSURE TEST FLOORS 1-4
PLUMBING 2ND ROUGH 02/27/2015 CANCELLED BY APPLICANT CMINI
HVAC ROUGH 02/26/2015 CANCELLED BY APPLICANT CMINI
ROOF SHEATHING / BRACE / TIE DOWN 02/26/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 2/26/2015 2:32:21 PM ENGINEERING ONLY, WAITING ON REPAIR REVISIONS FOR CUT TRUSSES
U - SEWER TIE IN 02/24/2015 APPROVED DSPENCER
GRAVITY SEWER 02/24/2015 APPROVED CMINI
HVAC OTHER 02/23/2015 CANCELLED BY APPLICANT CMINI
FIREWALL 02/23/2015 CANCELLED BY APPLICANT AIRS WEB
Note: THIS IS A REINSPECTION
FIREWALL NAILING 02/23/2015 CANCELLED BY APPLICANT AIRS WEB
FIREWALL NAILING 02/23/2015 CANCELLED BY APPLICANT CMINI
WINDOW NAILING 02/20/2015 APPROVED - AS NOTED DROCKWELL
Note: Inspection Resulted at 2/20/2015 10:51:18 AM BUILDING 8 ALL WINDOWS EXEPT CLUBHOUSE 1ST FLOOR
TIE DOWN 02/19/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 2/19/2015 12:27:59 PM THREADED ROD PLACEMENT TO 4TH FL
TIE DOWN 02/17/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 2/17/2015 2:28:08 PM 1ST FLOOR THREADED RODS AND ANCHORS
FIREWALL 02/17/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 2/17/2015 12:58:07 PM RATED WALLS EXTERIOR
EXTERIOR STRAP/CLIP 02/17/2015 CANCELLED BY APPLICANT CMINI
COLUMN-POST/BEAM/TIE DOWN CONNECTOR 02/17/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 2/17/2015 2:28:09 PM 1ST FLOOR TIES
ELECTRIC 1ST ROUGH 02/17/2015 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 2/17/2015 2:28:08 PM UNDERGROUND FROM TRANSFORMER CLUB HOUSE
ELECTRIC OTHER 02/17/2015 CANCELLED BY APPLICANT AIRS WEB
Note: THIS IS A REINSPECTION
EXTERIOR STRAP/CLIP 02/12/2015 APPROVED - AS NOTED DROCKWELL
Note: Inspection Resulted at 2/12/2015 10:53:02 AM CUPOLA STRAPPING AND TRUSS ANCHORS OK....UNIVERSAL REPORT ON FILE
EXTERIOR STRAP/CLIP 02/10/2015 APPROVED - AS NOTED DROCKWELL
Note: THIS IS A REINSPECTION Inspection Resulted at 2/10/2015 11:53:39 AM FOURTH FLOOR PORCH POSTS ONLY
EXTERIOR WALL SHEATHING / SHEARWALL 02/10/2015 APPROVED - AS NOTED DROCKWELL
Note: THIS IS A REINSPECTION Inspection Resulted at 2/10/2015 11:53:39 AM FOURTH FLOOR WALLS OK...APPROVED
ROOF SHEATHING / BRACE / TIE DOWN 02/10/2015 APPROVED - AS NOTED DROCKWELL
Note: Inspection Resulted at 2/10/2015 11:53:38 AM ROOF DECKING ONLY-APPROVED MUST REMOVE SHINERS BEFORE DRY-IN
EXTERIOR WALL SHEATHING / SHEARWALL 02/05/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 2/5/2015 2:30:07 PM PARTIAL 3RD FL WALL NAILING
EXTERIOR STRAP/CLIP 02/05/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 2/5/2015 2:30:08 PM PARTIAL 3RD FL COLUMN STRAPS
EXTERIOR STRAP/CLIP 02/03/2015 APPROVED - AS NOTED DROCKWELL
Note: THIS IS A REINSPECTION Inspection Resulted at 2/3/2015 11:07:40 AM EXTERIOR BALCONY 6X6 STRAPPING OK
EXTERIOR WALL SHEATHING / SHEARWALL 02/03/2015 APPROVED - AS NOTED DROCKWELL
Note: THIS IS A REINSPECTION Inspection Resulted at 2/3/2015 11:07:40 AM 2ND FLOOR WALL SHEATHING OK....UNIVERSAL REPORT ON FILE
EXTERIOR WALL SHEATHING / SHEARWALL 01/30/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 1/30/2015 10:21:07 AM WALL SHEATHING ON SHEARWALLS BETWEEN UNITS 4TH FL
ELECTRIC 1ST ROUGH 01/30/2015 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 1/30/2015 10:21:10 AM SERVICE PRIMARY FROM TRANSFORMER
ELECTRIC TEMP POLE 01/28/2015 APPROVED CMINI
EXTERIOR STRAP/CLIP 01/28/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 1/28/2015 2:14:33 PM 1ST FLOOR COLUMN STRAPPING ONLY
EXTERIOR WALL SHEATHING / SHEARWALL 01/28/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 1/28/2015 2:14:33 PM 1ST FLOOR NAILING PATTERN ON EXTERIOR WALL SHEATHING
MONOLITHIC SLAB 01/21/2015 APPROVED - AS NOTED DROCKWELL
Note: THIS IS A REINSPECTION Inspection Resulted at 1/21/2015 3:12:34 PM CLUB HOUSE SLAB AND ENTRY SLABS.APPROVED/UNIVERSAL REPORT ON FILE
EXTERIOR STRAP/CLIP 01/20/2015 PARTIALLY APPROVED JHINDMAN
Note: Inspection Resulted at 1/20/2015 2:51:57 PM PARTIAL MUDSILL ANCHORS ABOVE THE CLUBHOUSE
DOWN CELL 01/14/2015 APPROVED - AS NOTED DROCKWELL
Note: THIS IS A REINSPECTION Inspection Resulted at 1/14/2015 2:04:31 PM ELEVATOR TOP FLOOR LINTEL APPROVED.UNIVERSALL REPORT ON FILE
PLUMBING 1ST ROUGH 01/14/2015 APPROVED JHINDMAN
Note: THIS IS A REINSPECTION
SHEARWALL 12/31/2014 PARTIALLY APPROVED JHINDMAN
Note: Inspection Resulted at 12/31/2014 12:42:42 PM WALL SHEATHING ON SHEARWALLS BETWEEN UNITS
DOWN CELL 12/30/2014 PARTIALLY APPROVED JHINDMAN
Note: THIS IS A REINSPECTION Inspection Resulted at 12/30/2014 3:28:28 PM 3RD FLOOR ELEVATOR
MONOLITHIC SLAB 12/30/2014 PARTIALLY APPROVED JHINDMAN
Note: THIS IS A REINSPECTION Inspection Resulted at 12/30/2014 3:28:28 PM SLAB BETWEEN BUILDINGS
MONOLITHIC SLAB 12/29/2014 CANCELLED BY APPLICANT JHINDMAN
ELECTRIC OTHER 12/22/2014 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 12/22/2014 3:21:58 PM UNDER SLAB
MONOLITHIC SLAB 12/19/2014 APPROVED - AS NOTED DROCKWELL
Note: Inspection Resulted at 12/19/2014 2:16:05 PM BUILDING 8 SLAB ON GRADE APPROVED-POST TENTION CABLES IN PLACE.DEPTH IS TO PLAN.SOIL TREATED
SECOND FLOOR SLAB 12/18/2014 APPROVED - AS NOTED DROCKWELL
Note: Inspection Resulted at 12/18/2014 3:20:34 PM BUILDING 8 FLOOR SLAB.APPROVED PER PLAN.AWAITING REPORT FROM TRESHOLD INSPECTOR.WILL REVIEW ASAP,
DOWN CELL 12/17/2014 PARTIALLY APPROVED DROCKWELL
Note: Inspection Resulted at 12/17/2014 10:33:34 AM 2ND FLOOR ELEVATOR SHAFT DOWN CELLS OK-UNIVERSAL REPORT VEIWED ON SITE.WATER HEATER MECH ROOM DOWN CELLS OK-UNIVERSAL REPORT ON SITE-REPAIR WAS OBSERVED BY UNIVERSAL INSPECTOR.
PLUMBING 1ST ROUGH 12/12/2014 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 12/12/2014 12:13:46 PM PARTIAL HIGHLIGHTED OIN PLAN
ELECTRIC 1ST ROUGH 12/12/2014 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 12/12/2014 12:13:47 PM UNDERGROUNG SLEEVES FROM FROM BUILDING TO CLUB HOUSE FOR MECHANICAL RM
PLUMBING 1ST ROUGH 12/11/2014 CANCELLED BY APPLICANT CMINI
Note: THIS IS A REINSPECTION
DOWN CELL 12/11/2014 APPROVED - AS NOTED DROCKWELL
Note: Inspection Resulted at 12/11/2014 2:54:45 PM 10 FT BLOCK AT ELEVATOR SHAFT TO 2ND FLOOR FILL CELL STEEL PLACEMENT OK
COLUMN-POST/BEAM/TIE DOWN CONNECTOR 12/11/2014 APPROVED - AS NOTED DROCKWELL
Note: Inspection Resulted at 12/11/2014 2:54:44 PM STEEL PLACEMENT CORRECT IN ALL 6 COLUMNS.UNIVERSAL FILED REPORT
LINTEL 12/09/2014 PARTIALLY APPROVED DROCKWELL
Note: THIS IS A REINSPECTION Inspection Resulted at 12/9/2014 11:30:25 AM PERIMETER WALLS OF CLUBHOUSE.HORIZONTAL AND VERTICAL PLACEMENT OF STEEL APPROVED. UNIVERSAL REPORT ON FILE.
LINTEL 12/08/2014 CANCELLED BY APPLICANT CMINI
PLUMBING 1ST ROUGH 12/08/2014 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 12/8/2014 2:29:42 PM LOOKED AT WATER LINES ONLY
FOOTER 11/24/2014 APPROVED DROCKWELL
Note: THIS IS A REINSPECTION Inspection Resulted at 11/24/2014 2:38:29 PM ELEVATOR FOUNDATION WALLS MEET APPROVED PLANS AND SPEC``S.
FOOTER 11/21/2014 Disapproved -FEE REQUIRED DROCKWELL
Note: Inspection Resulted at 11/21/2014 2:36:49 PM CLEARANCE FOR CONCRETE/ STEEL NOT MET. UNIVERSALS REPORT FILED
FOOTER 11/20/2014 APPROVED - AS NOTED DROCKWELL
Note: per JEFF Inspection Resulted at 11/20/2014 11:13:13 AM ELEVATOR PIT FOUNDATION BOTH BUILDINGS.FOOTER TO PLAN AND CODE.

Review History

Department Status Date In Date Out
BLD COMPLETE 03/16/2015 03/16/2015
MECH COMPLETE 03/11/2015 03/11/2015
Note: Revision - Added sheet M2.4b, revised note 6 for proper elevator louver size.
ELEC COMPLETE 03/11/2015 03/16/2015
BLD COMPLETE 02/20/2015 02/24/2015
ELEC HOLD 02/20/2015 02/24/2015
Note: The revised 14 gauge wire sizes on pages E3, E3.1, E3.2, E3.3, and E4.2, do not meet the minimum wire size for a 20 amp circuit per 2008 NEC 240.4 D 3.
MECH HOLD 02/20/2015 02/20/2015
Note: Revision - Provide Sheet M2.4B revision 5 dated 2-16-15 for clarification per 2010 FBC 107.2.1. It was listed on Executive Summary of Changes but missing in the submittal package.
PLUM COMPLETE 02/20/2015 02/20/2015
Note: Revision 5 dated 2-3-15. See revision list for detail.
BLD COMPLETE 02/11/2015 02/13/2015
ELEC COMPLETE 02/10/2015 02/11/2015
BLD COMPLETE 02/10/2015 02/11/2015
ELEC HOLD 02/05/2015 02/05/2015
Note: 1. Panel HP-8 cannot have a separate ground as it is part of the same grounding system as panel CH. The plan page E4.2 drawing still shows a ground at panel HP8 2008 NEC 250.50.
BLD HOLD 02/05/2015 02/05/2015
Note: 1. Provide the U341 system detail. the detail was not submitted as per the response letter.
MECH COMPLETE 02/05/2015 02/06/2015
PLUM COMPLETE 02/05/2015 02/06/2015
BLD HOLD 01/22/2015 01/29/2015
Note: 1. Provide U. L. system detail that allows for the alternate intersection for the single/double wall on page S6.1.
ELEC HOLD 01/22/2015 01/28/2015
Note: 1. Panel HP-8 cannot have a separate ground as it is part of the same grounding system as panel CH. 2008 NEC 250.50
MECH COMPLETE 01/22/2015 01/27/2015
Note: Revision- Rev.4 dated 1-14-15. Changed natural ventilation to mech. ventilation
PLUM COMPLETE 01/22/2015 01/27/2015
Note: Revision- Rev. 4 dated 1-14-15. See details on summary of changes.
BLD COMPLETE 12/16/2014 12/17/2014
ZON COMPLETE 11/13/2014 11/14/2014
BLD COMPLETE 11/13/2014 11/18/2014
FI1 COMPLETE 11/06/2014 11/06/2014
ZON HOLD 11/06/2014 11/12/2014
Note: Held by Angie Piltaver 1. Sheet A0.2 is for bldg. 7. Please resubmit correct sheet A0-2 for bldg. 8 2. Sheet A2.1b, A2.1c, S2.1b and S2.1c shows a total dimension for the “C” elevation of 153’-5 ½”. The color elevations sheet A2.0a, sheet A2.1 all consistently shows 147’.5”. Please revise plans, as needed, to be consistent. 3. A2.2b, A2.2c, S2.2b and S2.2c show 153’-5 ½” total dimensions for “C” elevation, while sheet A2.2 shows 147’-5”. Please revise the plans, as needed, to be consistent. Please also revise match line references on all sheets to the correct sheet #’s A2.2b and A2.2C. 4. A2.3b, A2.3c, S2.3b and S2.3c show 153’.5 ½” total dimensions for “C” elevation, while sheet A2.3 shows 147’.5”. Please revise as needed to be consistent. Please also revise the match line reference on all sheets to show the correct sheet #’s A2.3b and A2.3c. 5. A2.4b, A2.4c, S2.4b and S2.4c shows 153’.5 ½” total “C” elevation dimension, while sheet A2.4 shows 147’.5”. Please revise plans as needed to be consistent. Please also revise the match line reference on all sheets to show correct sheet #s A2.4b and A2.4c. 6. Revise sheets A6.2c and A6.2d to include color references (color names/manufacturer).
BLD COMPLETE 11/06/2014 11/07/2014
ELEC COMPLETE 10/24/2014 10/29/2014
FI1 HOLD 10/24/2014 10/29/2014
Note: 1. Provide details for the penetration of the hallway floor/ceiling assembly by the floor drain. 2. Provide a detail for the 3 inch floor drain penetrations thru the tenent walls including how the notching or boring into the top plates is to be achieved. J. Hindman 986-3784.
MECH COMPLETE 10/24/2014 10/31/2014
Note: Correction - Rev.2 dated 10-3-14
PLUM COMPLETE 10/24/2014 10/31/2014
Note: Correction - Rev.2 dated 10-3-14
UD1 COMPLETE 10/22/2014 10/28/2014
ZON HOLD 10/22/2014 10/22/2014
Note: Development Order for this permit is under a modification review. The Development Order modification consist of building footprint changes and revised elevation that will affect the building permit plans.
BLD HOLD 10/22/2014 10/24/2014
Note: 1. Provide details for the penetration of the hallway floor/ceiling assembly by the floor drain. 2. Provide a detail for the 3 inch floor drain penetrations thru the tenent walls including how the notching or boring into the top plates is to be achieved. J. Hindman 986-3784
MECH COMPLETE 09/02/2014 10/01/2014
PLUM COMPLETE 09/02/2014 10/03/2014
ELEC COMPLETE 09/02/2014 10/01/2014
ZON HOLD 09/02/2014 09/03/2014
Note: 1. Provide executed Development Order. 2. Provide an executed access agreement.
BLD HOLD 09/02/2014 10/03/2014
Note: 1. Provide floor and roof truss engineering layouts from the truss manufacturer. J. Hindman 986-3784.
FI1 COMPLETE 09/02/2014 10/03/2014
BLD HOLD 07/23/2014 07/24/2014
Note: 1. The set of plans submitted has 3 and 4 story details. The permit application is for a 3 story building. Provide a set of plans that corresponds to the building type and permit. 2. Provide a design with an NFPA 13 sprinkler system due to the area and height modification increase per 2010 FBC 506.3 and 903.3.1.1. 3. Provide an exterior wall design that complies with 2010 FBC table 601. A 3x4 wall can only support two floors and a roof/ceiling per2010 FBC table 2308.9.1. 4. Provide an exterior rated wall design that matches the U.L. rated system. U.L. 356 does not show 3x4 studs per U.L. and 2010 FBC 107.2.1. Additional comments may be required after the above comments are addressed. J. Hindman 986-3784.
ELEC HOLD 07/23/2014 07/24/2014
Note: Your building application states three story and plans are for a four story building please clarify and make proper revisions FBC 107.2.1
ENGIN1 COMPLETE 07/23/2014 07/25/2014
FI1 HOLD 07/23/2014 07/24/2014
Note: 1. The set of plans submitted has 3 and 4 story details. The permit application is for a 3 story building. Provide a set of plans that corresponds to the building type and permit. 2. Provide a design with an NFPA 13 sprinkler system due to the area and height modification increase per 2010 FBC 506.3 and 903.3.1.1. 3. Provide an exterior wall design that complies with 2010 FBC table 601. A 3x4 wall can only support two floors and a roof/ceiling per2010 FBC table 2308.9.1. 4. Provide an exterior rated wall design that matches the U.L. rated system. U.L. 356 does not show 3x4 studs per U.L. and 2010 FBC 107.2.1. Additional comments may be required after the above comments are addressed. J. Hindman 986-3784.
MECH HOLD 07/23/2014 07/24/2014
Note: Your building application states three story and plans are for a four story building please clarify and make proper revisions FBC 107.2.1
PLUM HOLD 07/23/2014 07/24/2014
Note: Your building application states three story and plans are for a four story building please clarify and make proper revisions FBC 107.2.1
UD1 HOLD 07/23/2014 08/01/2014
Note: Provide data showing the 3rd and 4th floors water service will function at a reasonable level of service
ZON HOLD 07/23/2014 07/24/2014
Note: 1. Provide executed Development Order. 2. Provide an executed access agreement. 3. Provide an updated site plan. 4. Provide an updated address map. 5. Correct the permit application to reflect the correct number of floors for this building.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 05/01/2015
REINSPECTION FEE ¤40.00 05/01/2015
REINSPECTION FEE ¤40.00 05/01/2015
REINSPECTION FEE ¤40.00 05/01/2015
REINSPECTION FEE ¤40.00 05/01/2015
REINSPECTION FEE ¤40.00 05/01/2015
REINSPECTION FEE ¤40.00 05/01/2015
REINSPECTION FEE ¤40.00 05/01/2015
REVISION ¤40.00 05/01/2015
REVISION ¤40.00 05/01/2015
REVISION ¤40.00 05/01/2015
REVISION ¤40.00 05/01/2015
REVISION ¤40.00 05/01/2015
REVISION ¤40.00 05/01/2015
REVISION ¤40.00 05/01/2015
REVISION ¤40.00 05/01/2015
REVISION ¤40.00 05/01/2015
REVISION ¤40.00 05/01/2015
ADDITIONAL FEE ¤200.00 05/01/2015
ADDITIONAL FEE ¤200.00 05/01/2015
ADMIN COMMERCIAL ¤60.00 11/19/2014
ELECTRIC FEE ¤2,516.40 11/19/2014
3% FIRE IMPACT FEE CREDIT (¤234.33) 11/19/2014
IMPACT FEE FIRE NONRESIDENTIAL ¤7,811.07 11/19/2014
IMPACT FEE PARKS ¤31,421.88 11/19/2014
FIRE PLANS REVIEW ¤448.86 11/19/2014
IMPACT FEE TRANSPORTATION ¤104,194.59 11/19/2014
MECHANICAL FEE ¤2,516.40 11/19/2014
PERMIT FEE ¤22,517.00 11/19/2014
3% PARKS IMPACT FEE CREDIT (¤942.66) 11/19/2014
PLAN CHECK FEE ¤4,708.10 11/19/2014
PLUMBING FEE ¤2,516.40 11/19/2014
SURCHARGE FS 533.721 ¤522.51 11/19/2014
SURCHARGE - FS 468.631 ¤522.51 11/19/2014
3% TRANS IMPACT FEE CREDIT (¤3,125.84) 11/19/2014
Fees Total Due: ¤0.00 Total Paid: ¤176,572.89