Permit #2014080215

Permit Details

Status: COED

Parcel Id: 15-11-31-2970-00000-0940
CONDITIONED SPACE: 2924 sqft
GARAGE: 763 sqft
OPENED PORCH (WITH ROOF) : 442 sqft
OPENED PORCH (WITH ROOF) : 81 sqft
Total Square Footage: 4210 sqft
Block: 00000
Subdivision: 2070 - Grand Haven North Phase 1 @ Grand Haven
Job Phone: 386-947-4481
Location Address: 55 NORTH PARK CIR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/09/2014
NOC: RECORDED
Applicant name: ERIC CHRISTOPHER OLSEN
Owner: DECARLO, PAUL A

Address

59 NORTH PARK CIRCLE

PALM COAST, FL 32137

Lot: 0940
Contracted Stated Job Value: ¤350,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

OLSEN CUSTOM HOMES AND CONSULTING INC
Status Location Address State License Number Phone Fax
ACTIVE

131 MAGNOLIA AVE

DAYTONA BEACH, FL 32114

CGC1508852 (Exp: 08/31/2026) 386-947-4481 (386)947-4484

Sub Contractors

BENJAMIN EDWARD SMITH
Status Location Address State License Number Phone
CANCEL

131 MAGNOLIA AVE

DAYTONA BEACH, FL 32114

EC13004288 (Exp: 08/31/2016) 386-265-2687
DANIEL P HUCKS
Status Location Address State License Number Phone Fax
CANCEL

400 N. U.S. 1

Ormond Beach, FL 32174

CAC029376 (Exp: 08/31/2024) 386-672-8494 386-673-7856
JOHN BRADLEY WINFREY JR
Status Location Address State License Number Phone Fax
ACTIVE

1685 S. CLARA AVE

Deland, FL 32720

CFC054901 (Exp: 08/31/2026) 386-734-0154 386-734-2751
ALFRED N FYOCK JR
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

387 SAULS

ORMOND BEACH, FL 32174

ST

ORMOND BEACH, FL 32174

CCC1329075 (Exp: 08/31/2026) 386-566-6112 386-673-4299

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 02/25/2015 FINAL APPROVED DSPENCER
BLD - BUILDING FINAL 02/24/2015 FINAL APPROVED CMINI
FINAL SURVEY (OFFICE USE ONLY) 02/23/2015 APPROVED JHINDMAN
ROW FINAL 02/23/2015 FINAL APPROVED GLALIMA
Note: THIS IS A REINSPECTION
FINAL APRON (AFTER POUR/DRIVEWAY) 02/20/2015 APPROVED GLALIMA
ROW FINAL 02/20/2015 Disapproved - NO FEE GLALIMA
Note: NEED TO GET WITH CONTRACTOR ABOUT CLEANING UP AT BASIN '' O AND IN BASIN
PRE-APRON (PRE-POUR/DRIVEWAY) 01/27/2015 APPROVED GLALIMA
Note: THIS IS A REINSPECTION
ELECTRIC - EARLY POWER 01/22/2015 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 1/22/2015 1:52:52 PM CALLED FPL TO RELEASE POWER AT 2PM,SPOKE WITH DELL
PRE-APRON (PRE-POUR/DRIVEWAY) 01/22/2015 PARTIALLY APPROVED GLALIMA
U - SEWER TIE IN 12/08/2014 APPROVED DSPENCER
Note: THIS IS A REINSPECTION
U - SEWER TIE IN 12/05/2014 APPROVED DSPENCER
Note: Inspection Resulted at 12/5/2014 3:00:05 PM FOUND CONNECTION BURIED NO CALL WAS RECIEVED TO SCHEDULE A TIME FOR THE VISUAL INSPECTION
INSULATION 12/05/2014 APPROVED CMINI
LATH/BRICK/ WATER BARRIER 12/05/2014 APPROVED CMINI
GRAVITY SEWER TEST 12/05/2014 APPROVED CMINI
Note: THIS IS A REINSPECTION
GRAVITY SEWER TEST 12/04/2014 Disapproved -FEE REQUIRED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 12/4/2014 11:32:56 AM NO WATER PRESSURE ON GRAVITY SEWER PIPE
GRAVITY SEWER TEST 12/02/2014 CANCELLED BY APPLICANT CMINI
ALL ROUGH 12/02/2014 APPROVED CMINI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/02/2014 APPROVED CMINI
Note: THIS IS A REINSPECTION
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/07/2014 Disapproved -FEE REQUIRED JCOLASANTI
Note: Inspection Resulted at 11/7/2014 3:12:59 PM NOT READY, CONTINUES LOAD PATH NEEDS TO BE ACHIEVED AT VARIOUS LOCATIONS. STRAPS NEED TO BE NAILED VARIOUS LOCATIONS. STRAPS NEED TO BE PLACED AT LOAD HEADERS. SHEETING NEEDS TO BE REMOVED AT ENTRY FOR INSPECTION. BOLT DOWN ALL LOAD BEARING KNEEWALLS.
ELECTRIC-TUG 11/04/2014 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 11/4/2014 2:54:00 PM CALLED FPL TO RELEASE POWER AT 3:00 SPOKE WITH SUSAN
TIE BEAM / LINTEL 10/14/2014 APPROVED CMINI
FOUND SURVEY APPROVED (OFFICE) 10/13/2014 APPROVED JHINDMAN
MONOLITHIC SLAB 09/22/2014 APPROVED CMINI
PLUMBING 1ST ROUGH UNDERGROUND 09/16/2014 APPROVED CMINI
U - SEWER TIE IN 09/16/2014 APPROVED DSPENCER

Review History

Department Status Date In Date Out
SW1 COMPLETE 02/23/2015 02/23/2015
Note: Released By: JHINDMAN final s
SW1 COMPLETE 10/13/2014 10/13/2014
Note: Released By: JHINDMAN FOUNDATION S
ELEC COMPLETE 08/27/2014 08/28/2014
ELEC HOLD 08/21/2014 08/21/2014
Note: 1. Provide a riser that meets 2008 NEC art 250 for the connection to the foundation steel before the first means of disconnect. J. Hindman 986-3784. The new riser must have all of the grounding conducters connected together before the first means of disconnect.
URB COMPLETE 08/21/2014 08/22/2014
ZON COMPLETE 08/21/2014 08/22/2014
BLD COMPLETE 08/11/2014 08/11/2014
ELEC HOLD 08/11/2014 08/11/2014
Note: 1. Provide a riser that meets 2008 NEC art 250 for the connection to the foundation steel before the first means of disconnect. J. Hindman 986-3784.
ENGIN1 COMPLETE 08/11/2014 08/11/2014
Note: No swale plan required.
MECH COMPLETE 08/11/2014 08/11/2014
PLUM COMPLETE 08/11/2014 08/11/2014
SW1 COMPLETE 08/11/2014 08/11/2014
UD1 COMPLETE 08/11/2014 08/11/2014
Note: See comments in the general notes Keith King 386-9318009
URB HOLD 08/11/2014 08/11/2014
Note: Need to add 1-8' understory tree this lot requires 4 trees. Need the type of sod being installed.
ZON HOLD 08/11/2014 08/12/2014
Note: Landscape Plan must depict sod type.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 02/26/2015
REINSPECTION FEE ¤40.00 02/26/2015
REINSPECTION FEE ¤40.00 02/26/2015
NEW RESIDENTIAL INSPECTIONS ¤754.00 09/09/2014
SITE PLAN 20 ¤20.00 09/09/2014
SURCHARGE FS 533.721 ¤26.75 09/09/2014
SURCHARGE - FS 468.631 ¤26.75 09/09/2014
STORM WATER PERMIT FEES ¤80.00 09/09/2014
3% TRANS IMPACT FEE CREDIT (¤90.51) 09/09/2014
ADMIN FEE ¤20.00 09/09/2014
ELECTRIC FEE ¤286.20 09/09/2014
3% FIRE IMPACT FEE CREDIT (¤6.33) 09/09/2014
IMPACT FEE FIRE NONRESIDENTIAL ¤211.11 09/09/2014
IMPACT FEE PARKS ¤894.24 09/09/2014
IMPACT FEE SCHOOL ¤3,600.00 09/09/2014
IMPACT FEE TRANSPORTATION ¤3,017.05 09/09/2014
MECHANICAL FEE ¤286.20 09/09/2014
3% PARKS IMPACT FEE CREDIT (¤26.83) 09/09/2014
PLAN CHECK FEE ¤150.80 09/09/2014
PLUMBING FEE ¤286.20 09/09/2014
Fees Total Due: ¤0.00 Total Paid: ¤9,655.63