Permit #2014090420
Permit Details
Status: COED
| Parcel Id: 07-11-31-7011-00010-0020 |
| CONDITIONED SPACE: 2437 sqft |
| GARAGE: 575 sqft |
| OPENED PORCH (WITH ROOF) : 180 sqft |
| OPENED PORCH (WITH ROOF) : 130 sqft |
| Total Square Footage: 3322 sqft |
| Block: 00010 |
| Subdivision: 2193 - SECTION 11-BELLE TERRE |
| Job Phone: (904)296-1490 |
| Location Address: 8 BEECHWOOD LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/02/2014 |
| NOC: RECORDED |
| Applicant name: KENNETH WAYNE CAMPBELL JR |
| Owner: MARONDA HOMES, INC |
|
Address 9700 PHILIPS HIGHWAY JACKSONVILLE, FL 32256 |
|
Address SUITE 102 JACKSONVILLE, FL 32256 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤106,266.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
MARONDA HOMES INC. OF FLORIDA
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
6800 SOUTHPOINT PKWAY SUITE 300 JACKSONVILLE, FL 32216 |
CBC058803 (Exp: 08/31/2018) | 904-268-7730 | 904-268-7740 |
Sub Contractors
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
ROBERT G DELLO RUSSO
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
531 CODISCO WAY SANFORD, FL 32771 |
CAC032448 (Exp: 08/31/2022) | (407)831-2665 | (407)333-3853 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
DEBORAH MAXINE JACKSON
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
9474 OLD PLANK RD JACKSONVILLE , FL 32220 |
CCC1328530 (Exp: 08/31/2016) | 904-435-7663 | 904-404-8406 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 02/13/2015 | FINAL APPROVED | DSPENCER |
| FINAL APRON (AFTER POUR/DRIVEWAY) | 02/11/2015 | APPROVED | RGROSS |
| ROW FINAL | 02/11/2015 | APPROVED | RGROSS |
| BLD - BUILDING FINAL | 02/11/2015 | FINAL APPROVED | JCOLASANTI |
| FINAL SURVEY (OFFICE USE ONLY) | 02/09/2015 | APPROVED | JHINDMAN |
| ELECTRIC - EARLY POWER | 01/23/2015 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 1/23/2015 12:07:31 PM SPOKE WTH SUSAN @ 11 | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 01/23/2015 | APPROVED - AS NOTED | GLALIMA |
| Note: SEE PHOTOS PUSHED PIPE BACK AND GOT 5''1/2 '' OVER CULVERT WITH 8 . 5 SLOPE . | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 01/22/2015 | Disapproved -FEE REQUIRED | RGROSS |
| Note: Apron slope too steep. Over 12% on the right and over 9% on the left. | |||
| ELECTRIC - EARLY POWER | 01/21/2015 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 1/21/2015 9:22:22 AM UFER CONNECTION NEEDS TO BE ACCESSABLE NEC 250.68(A).....COVER PLATE IN REAR BEDROOM HAS BEEN REMOVED. | |||
| ELECTRIC - EARLY POWER | 01/20/2015 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: Inspection Resulted at 1/20/2015 3:38:04 PM 1. ATTIC LIGHT IS NOT INSTALLED. 2. PROVIDE CEILING BLANK IN LAUNDRY. 3. KITCHEN RECEPTACLES ARE NOT SAFED OFF. | |||
| U - SEWER TIE IN | 01/15/2015 | APPROVED | DSPENCER |
| LATH/BRICK/ WATER BARRIER | 12/17/2014 | APPROVED | JCOLASANTI |
| INSULATION | 12/12/2014 | APPROVED | JCOLASANTI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/10/2014 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 12/10/2014 | APPROVED | JCOLASANTI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/04/2014 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: Inspection Resulted at 12/4/2014 2:58:23 PM MISSING MUGT 15 (44), TA 18 (55) NEEDS TO BE VARIFIED PER TRUSS PLAN. COULD NOT VARIFY (15) JGRD5X CONNECTION. | |||
| TIE BEAM / LINTEL | 11/12/2014 | APPROVED | JCOLASANTI |
| FOUND SURVEY APPROVED (OFFICE) | 11/06/2014 | APPROVED | RLEE |
| MONOLITHIC SLAB | 11/03/2014 | APPROVED | JCOLASANTI |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/30/2014 | APPROVED | JCOLASANTI |
| GRAVITY SEWER TEST | 10/30/2014 | APPROVED | JCOLASANTI |
| STEM WALL FOUNDATION | 10/23/2014 | APPROVED | JCOLASANTI |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 02/09/2015 | 02/09/2015 |
| Note: Released By: JHINDMAN final s | |||
| SW1 | COMPLETE | 11/06/2014 | 11/06/2014 |
| Note: Released By: RLEE foundation s | |||
| MECH | COMPLETE | 09/26/2014 | 09/26/2014 |
| BLD | COMPLETE | 09/17/2014 | 09/25/2014 |
| ELEC | COMPLETE | 09/17/2014 | 09/25/2014 |
| ENGIN1 | COMPLETE | 09/17/2014 | 09/19/2014 |
| MECH | HOLD | 09/17/2014 | 09/24/2014 |
| Note: Provide hvac plan to match site plan and other plans with garage location at the left side of the house for clarification per 2010 FBC 107.2.1 | |||
| PLUM | COMPLETE | 09/17/2014 | 09/24/2014 |
| SW1 | COMPLETE | 09/17/2014 | 09/25/2014 |
| UD1 | COMPLETE | 09/17/2014 | 09/18/2014 |
| Note: See comment in general notes Danny Spencer 386-569-9082 | |||
| URB | COMPLETE | 09/17/2014 | 09/18/2014 |
| ZON | COMPLETE | 09/17/2014 | 09/18/2014 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 02/25/2015 |
| REINSPECTION FEE | ¤40.00 | 02/25/2015 |
| REINSPECTION FEE | ¤40.00 | 02/25/2015 |
| REINSPECTION FEE | ¤40.00 | 02/25/2015 |
| NEW RESIDENTIAL INSPECTIONS | ¤612.00 | 10/02/2014 |
| SITE PLAN 20 | ¤20.00 | 10/02/2014 |
| SURCHARGE FS 533.721 | ¤22.28 | 10/02/2014 |
| SURCHARGE - FS 468.631 | ¤22.28 | 10/02/2014 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/02/2014 |
| 3% TRANS IMPACT FEE CREDIT | (¤90.51) | 10/02/2014 |
| ADMIN FEE | ¤20.00 | 10/02/2014 |
| ELECTRIC FEE | ¤243.60 | 10/02/2014 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.33) | 10/02/2014 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤211.11 | 10/02/2014 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/02/2014 |
| IMPACT FEE TRANSPORTATION | ¤3,017.05 | 10/02/2014 |
| MECHANICAL FEE | ¤243.60 | 10/02/2014 |
| PARKS IMPACT FEE | ¤849.24 | 10/02/2014 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 10/02/2014 |
| PLAN CHECK FEE | ¤122.40 | 10/02/2014 |
| PLUMBING FEE | ¤243.60 | 10/02/2014 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,344.84 |