I want to search for...

Permit #2014100067

Permit Details

Status: COED

Parcel Id: 07-11-31-7028-00180-0010
CONDITIONED SPACE: 2350 sqft
GARAGE: 508 sqft
OPENED PORCH (WITH ROOF) : 174 sqft
OPENED PORCH (WITH ROOF) : 65 sqft
Total Square Footage: 3097 sqft
Block: 00180
Subdivision: 2199 - SECTION 28-WYNNFIELD
Job Phone: (386)931-1917
Location Address: 2 PONCE DELEON DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/24/2014
NOC: RECORDED
Applicant name: BRAD MICHAEL THOMAS
Owner: MICHAEL DOWNES, MICHAEL

Address

6 WOODCOCK ROAD

WEST NYACK, NY 10994

Lot: 0010
Contracted Stated Job Value: ¤157,900.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

AUBURN HOMES INC.
Status Location Address State License Number Phone
HOLD

1 HARGROVE GRADE STE 1E

PALM COAST, FL 32137

CGC1506292 (Exp: 08/31/2020) (386)931-1917

Sub Contractors

STEPHEN COURTEAUX
Status Location Address State License Number Phone Fax
ACTIVE

85 North Yonge Street

Ormond Beach, FL 32174

EC13001748 (Exp: 08/31/2026) (386) 672-4900 386-676-7472
JOHN ROBERT BLEVINS JR
Status Location Address State License Number Phone Fax
ACTIVE

17 PORWYN LANE

PALM COAST, FL 32164

CAC1816125 (Exp: 08/31/2026) 386-585-8283 386-263-2096
DENNIS GENE GAINEY
Status Location Address State License Number Phone Fax
INACTIVE

P.O. BOX 1203

Bunnell, FL 32110

CFC046004 (Exp: 08/31/2026) (386) 437-5637 386-437-3012
YORDANIS GONZALEZ
Status Location Address State License Number Phone
ACTIVE

33 RICKENBACKER DRIVE

PALM COAST, FL 32164

CCC1328730 (Exp: 08/31/2026) 386-804-4109

Inspection History

Type Request Date Result Inspector
ROW FINAL 03/11/2015 FINAL APPROVED GLALIMA
Note: THIS IS A REINSPECTION
ROW FINAL 03/09/2015 CANCELLED BY APPLICANT GLALIMA
Note: THIS IS A REINSPECTION
U -UTILITY RESIDENTIAL FINAL 03/09/2015 FINAL APPROVED DSPENCER
FINAL APRON (AFTER POUR/DRIVEWAY) 03/06/2015 APPROVED RGROSS
Note: THIS IS A REINSPECTION
ROW FINAL 03/06/2015 Disapproved -FEE REQUIRED RGROSS
Note: THIS IS A REINSPECTION Final Swale elevations are too high. See Swale Plan and Regrade swale to match the swale plan elevations.
BLD - BUILDING FINAL 03/06/2015 FINAL APPROVED JCOLASANTI
FINAL SURVEY (OFFICE USE ONLY) 03/05/2015 APPROVED FREODICA
Note: THIS IS A REINSPECTION
FINAL APRON (AFTER POUR/DRIVEWAY) 03/02/2015 Disapproved -FEE REQUIRED GLALIMA
Note: NEED FINAL SURVEY .
ROW FINAL 03/02/2015 Disapproved - NO FEE GLALIMA
Note: NEED TO CUT AND REPAIR ROAD DAMAGE AT END OF DRIVEWAY '' SWEEP SO I CAN ASSESS DAMAGE
FINAL SURVEY (OFFICE USE ONLY) 02/25/2015 Disapproved - NO FEE FREODICA
Note: The grading elevations from the rear yard to the left side of the house does not have the continuity of drainage flow to the front yard..
ELECTRIC - EARLY POWER 02/16/2015 APPROVED JCOLASANTI
Note: per contractor Inspection Resulted at 2/16/2015 1:45:12 PM SPOKE WITH SUSAN TO RELEASE POWER @ 1:24PM
GRAVITY SEWER TEST 02/02/2015 APPROVED JCOLASANTI
U - SEWER TIE IN 02/02/2015 APPROVED DSPENCER
PRE-APRON (PRE-POUR/DRIVEWAY) 01/28/2015 APPROVED GLALIMA
Note: READY TO POIUR
LATH/BRICK/ WATER BARRIER 01/21/2015 APPROVED JCOLASANTI
INSULATION 01/15/2015 APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
INSULATION 01/14/2015 CANCELLED BY APPLICANT JCOLASANTI
ALL ROUGH 01/12/2015 APPROVED JHINDMAN
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/09/2015 APPROVED - AS NOTED JCOLASANTI
Note: THIS IS A REINSPECTION Inspection Resulted at 1/9/2015 1:49:02 PM NEED REVISION FOR MITRE GLASS WALL FRAMING BY ALL ROUGH INSPECTION
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/30/2014 Disapproved -FEE REQUIRED JHINDMAN
Note: Inspection Resulted at 12/30/2014 3:28:43 PM 1. FILL COLUMN CELL ON REAR PORCH BEHIND FIXED GLASS. 2. PROVIDE A FIXED GLASS WALL FRAMING DETAIL. OK TO DRY IN.
TIE BEAM / LINTEL 12/12/2014 APPROVED DROCKWELL
FOUND SURVEY APPROVED (OFFICE) 12/08/2014 APPROVED JHINDMAN
MONOLITHIC SLAB 11/18/2014 APPROVED JCOLASANTI
PLUMBING 1ST ROUGH UNDERGROUND 11/13/2014 APPROVED DROCKWELL
GRAVITY SEWER TEST 11/13/2014 CANCELLED BY INSPECTOR DROCKWELL

Review History

Department Status Date In Date Out
SW1 COMPLETE 03/05/2015 03/05/2015
Note: Released By: FREODICA
MECH COMPLETE 02/24/2015 02/25/2015
Note: Revision- deleted hvac unit (mini-split ductless) at garage.
SW1 HOLD 02/24/2015 02/25/2015
Note: Held By: FREODICA final s The grading elevations from the rear yard to the left side of the house does not have the continuity of drainage flow to the front yard..
BLD COMPLETE 01/08/2015 01/09/2015
ELEC COMPLETE 01/08/2015 01/09/2015
SW1 COMPLETE 12/08/2014 12/08/2014
Note: Released By: JHINDMAN foundation survey
MECH COMPLETE 10/23/2014 10/24/2014
MECH HOLD 10/17/2014 10/23/2014
Note: Previous 2 items below shall be addressed - 4. Enegy calculation shows 2 central units (item12) with capacities that does not match with equipment sizing calculation and hvac plan shows only 1 unit. Coordinate for clarity per 2010 FBC 107.2.1. 5. Provide manufacturer and model number of outdoor and indoor units along with the sensible and total cooling capacities at the design conditions per 2010 FBCEC 403.6.1. FReodica 386-986-4734.
ENGIN1 COMPLETE 10/17/2014 10/21/2014
ZON COMPLETE 10/16/2014 10/17/2014
ENGIN1 HOLD 10/16/2014 10/17/2014
Note: Elevations are beyond the 0.3' tolernace, no changes in elevation made to site plan. Scott Bombardier 986-3756
UD1 COMPLETE 10/16/2014 10/16/2014
Note: See comment in general notes Danny Spencer 386-386-2640
ELEC COMPLETE 10/16/2014 10/16/2014
MECH HOLD 10/16/2014 10/17/2014
Note: Previous 2 items below shall be addressed - 4. Enegy calculation shows 2 central units (item12) with capacities that does not match with equipment sizing calculation and hvac plan shows only 1 unit. Coordinate for clarity per 2010 FBC 107.2.1. 5. Provide manufacturer and model number of outdoor and indoor units along with the sensible and total cooling capacities at the design conditions per 2010 FBCEC 403.6.1. FReodica 386-986-4734.
BLD COMPLETE 10/03/2014 10/07/2014
ELEC HOLD 10/03/2014 10/06/2014
Note: 1. provide pep tank circuit in electrical load calculations.on plan page or remove it from page and go with the stand alone calculations. You cannot have two different calculations on the same house 2008 NEC art 20. J. Hindman 986-3784.
ENGIN1 HOLD 10/03/2014 10/03/2014
Note: Elevations are betond the 0.3' tolerance. Scott Bombardier 986-3756
MECH HOLD 10/03/2014 10/08/2014
Note: 1. Energy calculation shall be signed by preparer per FBC 107.2.1. 2, EPL Display Card shall be signed by builder per 2010 FBCEC 405.4.3. 3. Conditioned space floor area (ittem 6 ) on energy calculation does not match with floor plan. Coordinate for clarity per 2010 FBC 107.2.1. 4. Enegy calculation shows 2 central units (item12) with capacities that does not match with equipment sizing calculation and hvac plan shows only 1 unit. Coordinate for clarity per 2010 FBC 107.2.1. 5. Provide manufacturer and model number of outdoor and indoor units along with the sensible and total cooling capacities at the design conditions per 2010 FBCEC 403.6.1. FReodica 386-986-4734.
PLUM COMPLETE 10/03/2014 10/06/2014
SW1 COMPLETE 10/03/2014 10/03/2014
UD1 HOLD 10/03/2014 10/06/2014
Note: PEP Panel is not shown in the electrical plan. Submit new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan. See comment in general notes Danny Spencer 386-386-2640
URB COMPLETE 10/03/2014 10/03/2014
ZON HOLD 10/03/2014 10/03/2014
Note: There are some discrepancies between the A/C pad and adjacent door pad with the site plan and the landscape plan. The site plan only shows the 3'x4' door pad however the landscape plan also shows a 6'x4' concrete slab. These pads need to be consistent. Please note however that the AC pad and equipment is not allowed in the 5' easement so please clearly show this when revising landscape and/or site plan. 2. Color selection for body of house is required to have a minimum LRV of 25 as per LDC.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 03/11/2015
REVISION ¤40.00 03/05/2015
REVISION ¤40.00 03/05/2015
REVISION ¤40.00 03/05/2015
IMPACT FEE FIRE NONRESIDENTIAL ¤211.11 03/05/2015
IMPACT FEE PARKS ¤849.24 03/05/2015
IMPACT FEE SCHOOL ¤3,600.00 03/05/2015
IMPACT FEE TRANSPORTATION ¤3,017.05 03/05/2015
REINSPECTION FEE ¤40.00 03/05/2015
REINSPECTION FEE ¤40.00 03/05/2015
ADMIN FEE ¤20.00 10/24/2014
ELECTRIC FEE ¤234.60 10/24/2014
MECHANICAL FEE ¤234.60 10/24/2014
PLAN CHECK FEE ¤116.40 10/24/2014
PLUMBING FEE ¤234.60 10/24/2014
SITE PLAN 20 ¤20.00 10/24/2014
SURCHARGE FS 533.721 ¤21.33 10/24/2014
SURCHARGE - FS 468.631 ¤21.33 10/24/2014
STORM WATER PERMIT FEES ¤80.00 10/24/2014
NEW RESIDENTIAL INSPECTIONS ¤582.00 10/24/2014
Fees Total Due: ¤0.00 Total Paid: ¤9,482.26