Permit #2014100351
Permit Details
Status: COED
| Parcel Id: 41-11-31-4975-00000-0020 |
| COMMERCIAL SQUARE FOOTAGE: 11600 sqft |
| Total Square Footage: 11600 sqft |
| Block: 00000 |
| Subdivision: 2272 - ISLAND WALK AT PALM COAST |
| Job Phone: 727-938-9719 |
| Location Address: 250 PALM COAST PKWY NE |
| Type: BC - BUILDING COMMERCIAL |
| Issue Date: 12/31/2014 |
| NOC: RECORDED |
| Applicant name: MICHAEL S BEAUSIR |
| Owner: BRANCH PROPERTIES, LLC |
|
Address 3340 PEACHTREE ROAD NE, SUITE 600 ATLANTA, GA 30326 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤466,913.00 |
| Job Description: 7 UNIT BUILDING (SHELL) BUILDING 500 ( A-2) |
| Type: CN |
Contractor
HAWKINS CONSTRUCTION INC
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1430 L AND R INDUSTRIAL BLVD TARPON SPRINGS, FL 34689 |
CGC061198 (Exp: 08/31/2018) | 727-938-9719 | 727-938-3208 |
Sub Contractors
TERRY FISHER ROSS
| Status | Location Address | State License Number | Phone |
| INACTIVE |
2204 W GRIFFIN RD LEESBURG, FL 34748 |
CFC056481 (Exp: 08/31/2016) | 352-728-6053 |
JOHN MICHAEL SCIOLINO
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
3434 ST. AUGUSTINE ROAD JACKSONVILLE , FL 32207 |
EC0001795 (Exp: 08/31/2022) | 904-396-6689 | 904-396-1136 |
MICHAEL L RUSS SR
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P.O. BOX 730 DUNNELLON, FL 34430 |
CCC015610 (Exp: 08/31/2022) | (352)489-4274 | (352)489-3466 |
TERRY FISHER ROSS
| Status | Location Address | State License Number | Phone |
| INACTIVE |
2204 W GRIFFIN RD LEESBURG, FL 34748 |
CFC056481 (Exp: 08/31/2016) | 352-728-6053 |
Inspection History
| Type | Request Date | Result | Inspector |
| FIRE FINAL | 09/21/2015 | APPROVED | JHINDMAN |
| U - UTILITY COMMERCIAL FINAL | 09/04/2015 | APPROVED | DSPENCER |
| BUILDING FINAL | 09/03/2015 | FINAL APPROVED | CMINI |
| STOREFRONT | 09/02/2015 | APPROVED - AS NOTED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 9/2/2015 12:51:14 PM COMPLETE | |||
| EXTERIOR WALL SHEATHING / SHEARWALL | 09/02/2015 | APPROVED - AS NOTED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 9/2/2015 12:51:13 PM COMPLETE | |||
| ABOVE CEILING | 09/02/2015 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 9/2/2015 1:11:36 PM NOT NEEDED | |||
| BLD - SEWER TIE IN | 09/02/2015 | APPROVED | DSPENCER |
| Note: THIS IS A REINSPECTION | |||
| ELECTRIC FINAL | 09/02/2015 | FINAL APPROVED | RMARTIN |
| DOWN CELL | 09/02/2015 | APPROVED - AS NOTED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 9/2/2015 12:51:15 PM COMPLETE | |||
| LINTEL | 09/02/2015 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 9/2/2015 12:51:11 PM COMPLETE | |||
| ELECTRIC 2ND ROUGH | 08/18/2015 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 8/18/2015 11:59:09 AM NEED TO DELETE NOTE FOR HEAT TRACE ON PLAN THAT IS NOT GOING TO BE INSTALLED | |||
| ELECTRIC - EARLY POWER | 08/13/2015 | APPROVED - AS NOTED | RMARTIN |
| Note: Inspection Resulted at 8/13/2015 3:37:35 PM SPOKE TO SUSAN FPL 3:35 | |||
| ELECTRIC 2ND ROUGH | 08/12/2015 | APPROVED - AS NOTED | RMARTIN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 8/12/2015 3:19:46 PM CALLED FPL 4 TIMES LEFT MESSAGE ON RECORDING NO ANSWER OR CALL BACK TO RELEASE POWER | |||
| ELECTRIC 1ST ROUGH | 08/12/2015 | APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION | |||
| FIREWALL | 08/10/2015 | APPROVED | JHINDMAN |
| Note: screw inspection | |||
| INSULATION | 08/05/2015 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| FRAMING | 08/04/2015 | APPROVED - AS NOTED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 8/4/2015 12:20:48 PM BUMP OUTS AND LADDER WALL, SEPARATION WALL | |||
| INSULATION | 07/23/2015 | PARTIALLY APPROVED | CMINI |
| PLUMBING FINAL | 07/22/2015 | APPROVED | CMINI |
| GRAVITY SEWER | 07/22/2015 | APPROVED | CMINI |
| ELECTRIC 2ND ROUGH | 07/21/2015 | PARTIALLY APPROVED | RMARTIN |
| Note: Inspection Resulted at 7/21/2015 3:03:58 PM MARKED ON PLAN | |||
| PLUMBING 2ND ROUGH | 07/15/2015 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| BLD - SEWER TIE IN | 06/30/2015 | PARTIALLY APPROVED | DSPENCER |
| Note: Inspection Resulted at 7/2/2015 2:41:46 PM SERVICE INSTALLED | |||
| PLUMBING 2ND ROUGH | 06/23/2015 | CANCELLED BY APPLICANT | CMINI |
| ELECTRIC 1ST ROUGH | 06/15/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 6/15/2015 1:24:56 PM FEEDERS AND TELEPHONE BACK OF BUILDING | |||
| STOREFRONT | 06/11/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 6/11/2015 12:42:39 PM \ | |||
| STOREFRONT | 06/10/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| STOREFRONT | 06/09/2015 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 6/9/2015 2:09:35 PM SILLS | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 06/04/2015 | APPROVED - AS NOTED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 6/4/2015 2:20:45 PM ISO BOARD SCREW DOWN | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 06/03/2015 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 6/3/2015 2:54:29 PM ISO BOARD SCREW DOWN | |||
| ELECTRIC 1ST ROUGH | 05/28/2015 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 5/28/2015 9:33:55 AM PARTIAL UNDERGROUND TO FEEDERS | |||
| FRAMING | 05/20/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 5/20/2015 10:49:50 AM FRAMED SILLS | |||
| FRAMING | 05/08/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 5/8/2015 2:48:26 PM THIS WAS A ROOF DECKING INSPECTION ON TOWER | |||
| FRAMING | 05/04/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 5/4/2015 1:20:57 PM ROOF TOWER ELEVATION FRAMING | |||
| FRAMING | 05/01/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 5/1/2015 2:40:11 PM PARTIAL ON TOWER | |||
| EXTERIOR WALL SHEATHING / SHEARWALL | 04/28/2015 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 4/28/2015 11:33:58 AM PARTIAL ON WALL SHEATHING FRONT ELEVATION | |||
| EXTERIOR WALL SHEATHING / SHEARWALL | 04/27/2015 | CANCELLED BY APPLICANT | AIRS WEB |
| FRAMING | 04/15/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 4/15/2015 2:58:09 PM ELEVATION FRAMING HIGHLIGHTED ON PLAN | |||
| FRAMING | 04/14/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 4/14/2015 12:12:40 PM FRONT ELEVATION FRAMING HIGHLGHJTED ON PLAN | |||
| FOUNDATION SURVEY - OFFICE USE ONLY | 04/13/2015 | APPROVED | JHINDMAN |
| FRAMING | 04/09/2015 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 4/9/2015 2:57:11 PM ELAVATION FRAMING HIGHLIGHTED ON PLAN | |||
| DOWN CELL | 03/31/2015 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Inspection Resulted at 3/31/2015 2:52:19 PM NOT A DOWN CELL INSPECTION.SUBMIT SEALED DRAWINGS TO CITY FOR PROPER REVISIONS BEFORE MOVING FORWARD | |||
| MONOLITHIC SLAB | 03/30/2015 | APPROVED | CMINI |
| PLUMBING 1ST ROUGH | 03/25/2015 | APPROVED | CMINI |
| ELECTRIC 1ST ROUGH | 03/17/2015 | APPROVED - AS NOTED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 3/17/2015 11:36:16 AM CONDUIT UNDER FLOOR SLAB | |||
| DOWN CELL | 02/18/2015 | APPROVED - AS NOTED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 2/18/2015 2:28:13 PM TOP OUT OF LINTEL | |||
| DOWN CELL | 02/12/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| DOWN CELL | 01/29/2015 | Disapproved -FEE REQUIRED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 1/29/2015 12:33:57 PM NO STEEL, NOT READY | |||
| DOWN CELL | 01/28/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 1/28/2015 3:20:27 PM 2ND LIFT LINTEL A2 | |||
| DOWN CELL | 01/21/2015 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 1/21/2015 2:55:47 PM 1ST LIFT A2 | |||
| FOOTER | 01/08/2015 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| FOOTER | 01/07/2015 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 1/7/2015 3:16:08 PM PERIMETER FOOTER AND COLUMN PADS HIGHLIGHTED ON PLANS | |||
| ELECTRIC 1ST ROUGH | 01/07/2015 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 1/7/2015 3:16:06 PM UFER BONDING |
Review History
| Department | Status | Date In | Date Out |
| PLUM | COMPLETE | 04/21/2015 | 04/22/2015 |
| Note: Revision 6 dated 4-13-15 (changed grease waste) | |||
| SW1 | COMPLETE | 04/10/2015 | 04/13/2015 |
| Note: Released By: JHINDMAN foundation survey | |||
| BLD | COMPLETE | 04/07/2015 | 04/07/2015 |
| BLD | COMPLETE | 02/06/2015 | 02/09/2015 |
| PLUM | COMPLETE | 12/22/2014 | 12/23/2014 |
| ZON | COMPLETE | 12/22/2014 | 12/22/2014 |
| PLUM | HOLD | 12/10/2014 | 12/10/2014 |
| Note: Previous comment item 1 shall be addressed- 1. Provide plumbing and gas contractors doing the work per FS 489. | |||
| UD1 | COMPLETE | 12/10/2014 | 12/15/2014 |
| ELEC | COMPLETE | 12/10/2014 | 12/16/2014 |
| BLD | COMPLETE | 12/10/2014 | 12/16/2014 |
| ZON | HOLD | 12/10/2014 | 12/12/2014 |
| Note: 1. On Sheet RA-4.1 Northwest elevation, the building section dimension where columns 115 to 109 appear is shown as 42'-6". The approved Development Order color elevations show 41'-8" for the same section. Please revise the elevations to be consistent with the approved color elevations. 2. On Sheet RA-4.1 the South elevation dimensions are inconsistent with the approved Development Order color elevations. Please revise the dimensions to be consistent with what was approved on the Development Order elevation drawings. 3. Applicant response noted in regards to "Sample Panel" depicted on Sheet RA-4.1. The structure appears to be 40 feet wide by approximately 14 feet tall, and is not depicted on the Site Plans approved with the Development Order. Is this an outdoor structure? If so, the Site Plans attached to the Development Order should be revised to show the location of the structure, and noted as temporary on that plan. Planning is currently processing a Development Order Modification for Island Walk. Potentially, the plans for the DO Modification currently being processed could be revised to show the temporary structure for review/approval. 4. Sheet RA-4.1 still does not depict the bands between columns 139-127 and 115-101 consistent with the approved color elevations attached to the Development Order. Perhaps the lower line was inadvertently omitted? Please revise to be consistent with the approved color elevations as indicated in previous comment 4. 5. As indicated in previous comment 5, please revise Sheet RA-4.2 to show the roof pitch of the pitched roof section. | |||
| BLD | HOLD | 10/15/2014 | 10/29/2014 |
| Note: 1. Provide all structural steel connections. 2. Provide all steel framing connections. This information was requested in the redlined sheets that were sent to Chris Didier on Oct 8 and have not been addressed. J. Hindman 986-3784. | |||
| ELEC | HOLD | 10/15/2014 | 10/29/2014 |
| Note: 1.Identify the voltage from the transformers to the main disconnects. 2. Provide load calculations for each service that shows the maximum proposed loads out of each shell unit panel. 2008 NEC art 220. 3. Provide detail for how the feeders in the wireway are to be capped or terminated. 4. Provide demand calculation for panels HPA1 and HPA2. 2008 NEC art 220. 5. Provide demand load calculation for the main service. 2008 NEC art 220. 6. Provide electrical panel schedule for HPA2 that includes the Markel unit heater that is shown on RE-1.2 item number 7. | |||
| ENGIN1 | COMPLETE | 10/15/2014 | 10/17/2014 |
| Note: No Review Required | |||
| FI1 | COMPLETE | 10/15/2014 | 10/29/2014 |
| MECH | COMPLETE | 10/15/2014 | 10/17/2014 |
| Note: This is a shell building permit and mechanical work will be done in the future. | |||
| PLUM | HOLD | 10/15/2014 | 10/17/2014 |
| Note: 1. Provide plumbing and gas contractors doing the work per FS 489. 2. Provide piping material specifications for sanitary and domestic water per 2010 FPC 702/605. 3. Provide piping material specification for gas including pipe sizes per 2010 FBC Fuel Gas 402/403. | |||
| UD1 | HOLD | 10/15/2014 | 10/21/2014 |
| Note: Are any restaurants proposed in this building. No grease lines are shown. Grease interceptors are required for food service facilities. CJohnson 986-2384 | |||
| ZON | HOLD | 10/15/2014 | 11/17/2014 |
| Note: 1. Please revise Sheet RA-4.1 to add the roof pitch to the pitched roof section. 2. Please revise Sheet RA-4.1 to add the building length dimensions to the South and the Southeast Elevations. 3. What is the item labeled Sample Panel on Sheet RA-4.1? This is not an approved structure on the Site Plan Development Order plans. Please remove or clarify. 4. On Sheet RA-4.1, the Shops A-1 Northwest Elevation between columns 139 and 127 and between columns 115 and 101 appear to be missing bands in the lower portion of the wall where the service/utility equipment has been relocated. Please revise RA-4.1 to include the missing bands to conform with the approved elevations attached to the Site Plan Development Order. 5. Please revise Sheet RA-4.2 to add a label for the roof pitch on the gable roof. 6. Please revise Sheet RA-4.2 to add building dimensions on the South and the Northwest elevation views. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 09/22/2015 |
| REINSPECTION FEE | ¤40.00 | 09/22/2015 |
| REVISION | ¤40.00 | 09/22/2015 |
| REVISION | ¤40.00 | 09/22/2015 |
| REVISION | ¤40.00 | 09/22/2015 |
| SITE PLAN 20 | ¤20.00 | 12/31/2014 |
| SURCHARGE FS 533.721 | ¤64.59 | 12/31/2014 |
| SURCHARGE - FS 468.631 | ¤64.59 | 12/31/2014 |
| ADMIN COMMERCIAL | ¤60.00 | 12/31/2014 |
| ELECTRIC FEE | ¤340.20 | 12/31/2014 |
| ENGINEERING PERMIT FEES | ¤120.00 | 12/31/2014 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤3,105.32 | 12/31/2014 |
| FIRE PLANS REVIEW | ¤25.00 | 12/31/2014 |
| IMPACT FEE TRANSPORTATION | ¤74,375.72 | 12/31/2014 |
| IMPACT FEE CREDIT RES 2014-122 | (¤74,375.72) | 12/31/2014 |
| MECHANICAL FEE | ¤340.20 | 12/31/2014 |
| PERMIT FEE | ¤2,568.50 | 12/31/2014 |
| PLAN CHECK FEE | ¤537.05 | 12/31/2014 |
| PLUMBING FEE | ¤340.20 | 12/31/2014 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤7,785.65 |