I want to search for...

Permit #2014100766

Permit Details

Status: COED

Parcel Id: 41-11-31-4975-00000-0010
Total Square Footage: 0 sqft
Block: 00000
Subdivision: -
Job Phone: 727-938-9719
Location Address: 250 PALM COAST PKWY NE
Type: CSD - COMMERCIAL SITE DEVELOPMENT
Issue Date: 11/05/2014
NOC: RECORDED
Applicant name: MICHAEL S BEAUSIR
Owner: BRANCH PROPERTIES, LLC

Address

3340 PEACHTREE ROAD NE, SUITE 600

ATLANTA, GA 30326

Lot: 0010
Contracted Stated Job Value: ¤48,000.00
Job Description: BUILDING A-1, A-2, DEMO ISLAND WALK - STAGE 1 & 2 (SHEET 42 - 43 OF APPROVED CIVIL PLANS)
Type: CN

Contractor

HAWKINS CONSTRUCTION INC
Status Location Address State License Number Phone Fax
CANCEL

1430 L AND R INDUSTRIAL BLVD

TARPON SPRINGS, FL 34689

CGC061198 (Exp: 08/31/2018) 727-938-9719 727-938-3208

Inspection History

Type Request Date Result Inspector
FINAL SURVEY (COMM - OFFICE USE ONLY) 09/29/2015 APPROVED - AS NOTED WBUTLER
Note: THIS IS A REINSPECTION 9/29/15 LANDSCAPE IRRIGATION AS-BUILTS APPROVED; HOWEVER, AWAITING MINOR REVISIONS TO BE PROVIDED TO THE CITY ON THE NEXT PERMIT PHASE OF DEVELOPMENT PRIOR TO APPROVAL OF THE NEXT PHASE/STAGE.
FINAL INSPECTION 09/29/2015 FINAL APPROVED CMINI
LDSC- LANDSCAPE FINAL 09/28/2015 APPROVED WBUTLER
Note: PER CONTRACTOR 9/28/15 Just some very minor sodding work to be completed and the repair of landscape where a fiber optic directional bore occurred today. Will be inspected at the next phase final inspection. Bill Butler
U - UTILITY COMMERCIAL FINAL 09/21/2015 APPROVED DSPENCER
BLD - ADA COMPLIANT 09/21/2015 APPROVED CMINI
LDSC- SUBSTANTIAL COMPLETE (OFFICE USE) 09/17/2015 APPROVED - AS NOTED WBUTLER
Note: Permit Number 2014100766 9-17-15 1. The palm trees have not been staked as shown on the approved plan. The contractor indicated that he did not feel they needed to be staked. This is a decision that the project landscape architect needs to approve and if approved, he needs to remove all staking details from the as-built plan submittal. Otherwise, the trees need to be staked per the approved plan. 2. Automatic flush plugs still need to be installed in 6" valve boxes. This is all per City regulations for drip irrigation. 3. Mulch to be removed from touching the trunks of all trees and stems of all shrubs. 4. Need to plant Sabal palms where existing Sabal palms previously existed, but were mistakenly removed. One exception is the one island in the front of the storefronts that had 4, but a grouping of 3 meets code. 5. Mulch the planter bed between the road and the buildings sidewalk where the Hawkins Construction office is now located. 6. The low natural area where the two large specimen trees were saved needs to be cleaned out of weeds, construction debris and excess dirt, then mulched. 7. Mulch the east end of the entrance median on Old Kings Road. 8. At the exit road onto Old Kings Road, need to remove one Sabal palm that was shown to be removed from under the power lines. Need to also plant the juniper and irrigate per the plans. The pine trees shown on the plan to be removed can remain. 9. Mulch the disturbed shrubbery bed in the front and on the north side of Salsa's building. 10. Need to add the shrubs and irrigation to the rear of the Salsa's building per the approved plans. 11. Make sure the Solar Sync module gets put on the controller and also need a card in the controller that indicates what zone irrigates what area of the site. Note which zones are drip, bubblers or spray. 12. Need Bahia sod on the north side of the exit lane onto Old Kings Road as well as the area on the north side of the sidewalk. Sod also needed west of the curbed access road going to Salsa's restaurant. Other area needing sod is in the buffer along the south side of the road that is on the north side of the site. 13. Existing tree in the south end of the tree well in the parking lot has a broken branch hanging down that needs to be pruned off. 14. Landscape and irrigation as-built plans for phase 1 must be submitted and approved prior to calling for the final inspection. As-builts to include: a) Measurements from two fixed points for all valve boxes, wire splice boxes, and flush valves for drip irrigation. b) Any deviation in tree or plant location that is more than 5' from location on plan. d) Show any added or substituted plants or trees and add them to the plant list with size and spacing. e) Need two copies of signed and sealed plans, including the detail sheets and one CD copy of the landscape and irrigation plans.
LDSC- LANDSCAPE FINAL 09/17/2015 CANCELLED BY INSPECTOR WBUTLER
Note: Cannot call in the final before the as-builts have been submitted and approved.
TRAFFIC SIGNAGE/PAVEMENT MARKING FINAL 09/16/2015 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 9/16/2015 2:46:37 PM 1) ALL NON-HANDICAP SIGNS NEED TO BE A MINIMUM OF 72 INCHES FROM THE BASE TO THE BOTTOM OF THE SIGN.HANDICAP SIGNS NEED TO BE 7' AT THE BOTTOM OF SIGNS THERE WERE SIGNS THAT DID NOT MEET THE MINIMUM HIEGHT REQUIREMENT. 2) AT THE SPINE ROAD INTERSECTION EAST OF OLD KINGS ROAD, PLEASE PULL THE CURB BACK 10 FEET TO ALLOW FOR BETTER TRUCK MOVEMENTS AND UTILIZE TYPE A MOUNTABLE CURB ON THE END POINT TO MINIMIZE DESTRUCTION OF THE CURB. 3) A CROSSWALK IS MISSING AT THE SPINE ROAD INTERSECTION EAST OF OLD KINGS ROAD ON THE NORTH APPROACH. PLEASE EXAMINE THE PLANS AS I BELIEVE THAT WAS SUPPOSED TO BE STAMPED ASPHALT. 4) AT THE SPINE ROAD INTERSECTION EAST OF OLD KINGS ROAD, THE WALK SIGN DIRECTLY ADJACENT TO THE STOP SIGN IS NOT NEEDED AS DRIVERS ARE REQUIRED TO STOP AT THE STOP BAR TO ALLOW PEDESTRIANS TO WALK. THESE ITEMS WILL BE CHECKED ON THE NEXT PHASE. per sean Castillo the traffic engineer for the city of Palm Coast (386)986-4758
U-WATER METER INSTALLATION/VERIFICATION 09/16/2015 APPROVED DSPENCER
UC-SUBSTANTIAL WALK-THRU 09/16/2015 APPROVED DSPENCER
Note: Inspection Resulted at 9/16/2015 3:57:02 PM PUNCH LIST HAS BEEN GENERATED FOR CORRECTIONS TO BE MADE BEDORE UTILITY FINAL INSPECTION IS PERFORMED
FINAL GRADE PRIOR TO SOD 09/15/2015 APPROVED - AS NOTED GLALIMA
Note: THIS IS A REINSPECTION SEE FINAL GRADE INSPECTION STAGE 1 PERFORMED ON SEPT, 15 2015
FINAL DRAINAGE 09/15/2015 APPROVED GLALIMA
Note: THIS IS A REINSPECTION MISSING SOD AND NO FINAL SURVEY . THIS ''FINAL GRADE INSPECTION IS FOR STAGE 1 AND WHEN STAGE 2 IS CALLED IN FOR INSPECTION STAGE 1 WILL BE RE-INSPECTED ''' DO UNDERSTAND THAT AT THE FINAL STAGE 4 YOU WILL HAVE TO HAVE A FULL SURVEY . ANY ISSUES CALL GARY LALIMA 386-586-0287
LDSC-LOCATE BACKFLOW PREVENTOR OR PAD/ ELEC TRANS 09/14/2015 APPROVED WBUTLER
LDSC-SITE LIGHT STAKE LOCATE 09/14/2015 APPROVED WBUTLER
FINAL SURVEY (COMM - OFFICE USE ONLY) 09/14/2015 CANCELLED BY APPLICANT BBEMBRY
FINAL GRADE 09/11/2015 CANCELLED BY APPLICANT CMINI
Note: Inspection Resulted at 9/15/2015 3:07:39 PM NEED FINAL SURVEY APPROVED
FINAL GRADE PRIOR TO SOD 09/11/2015 CANCELLED BY APPLICANT GLALIMA
Note: THIS IS A REINSPECTION
BLD - SITE LIGHTING-CONDUCTORS/CONNECTORS 09/03/2015 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 9/3/2015 1:40:25 PM COMPLETE
BLD - SITE LIGHTING EXTERIOR MOUNTED 09/03/2015 APPROVED RMARTIN
FINAL DRAINAGE 09/03/2015 CANCELLED BY APPLICANT CMINI
Note: Inspection Resulted at 9/3/2015 1:40:23 PM NEED AS-BUILT SURVEY APPROVED
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 09/03/2015 APPROVED DSPENCER
Note: THIS IS A REINSPECTION
U-WATER SERVICE INSTALLATION 09/03/2015 APPROVED DSPENCER
Note: THIS IS A REINSPECTION
U-GREASE INTERCEPTOR INSTALLED/PLUMBED 09/03/2015 APPROVED DSPENCER
Note: THIS IS A REINSPECTION
U-GREASE INTERCEPTOR FLOW/DYE TESTED 09/03/2015 APPROVED DSPENCER
U-GRAVITY SEWER INSTALL/TESTING 09/03/2015 APPROVED DSPENCER
Note: THIS IS A REINSPECTION
U-REUSE MAIN INSTALL/TESTING 09/03/2015 APPROVED DSPENCER
Note: THIS IS A REINSPECTION
U-WATER MAIN DISINFECTION 09/03/2015 APPROVED DSPENCER
U-WATER MAIN DISINFECTION SAMPLING 09/03/2015 APPROVED DSPENCER
Note: THIS IS A REINSPECTION
ASPHALT PRE-PLACEMENT 09/03/2015 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 9/3/2015 1:40:24 PM COMPLETE
DRAINAGE STRUCTURE PLACEMENT 09/03/2015 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 9/3/2015 1:40:24 PM COMPLETE
DRAINAGE PIPE PLACEMENT 09/03/2015 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 9/3/2015 3:04:45 PM COMPLETE
BLD - SITE STRUCTURE - TRASH DUMPSTER 09/03/2015 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 9/3/2015 1:40:25 PM COMPLETE
BLD - SITE STRUCTURE-RETAINING WALL 09/02/2015 APPROVED CMINI
BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS 09/02/2015 APPROVED CMINI
Note: THIS IS A REINSPECTION
U - SEWER TIE IN 09/02/2015 APPROVED DSPENCER
Note: THIS IS A REINSPECTION
LDSC-PRE-PLANTING TREE QUALITY 08/28/2015 APPROVED WBUTLER
FINAL GRADE PRIOR TO SOD 08/28/2015 CANCELLED BY APPLICANT CMINI
BLD - SITE LIGHTING-CONDUCTORS/CONNECTORS 08/28/2015 PARTIALLY APPROVED RMARTIN
Note: THIS IS A REINSPECTION Inspection Resulted at 8/28/2015 3:07:56 PM STILL NEED WIRING ON OLD KINGS MARQUE/SIGN
BLD - UNDERGROUND SITE LIGHTING CONDUITS 08/28/2015 APPROVED RMARTIN
Note: THIS IS A REINSPECTION
BLD - SITE LIGHTING-PLACEMENT/FOUNDATION 08/28/2015 APPROVED RMARTIN
ASPHALT STRIPING 08/11/2015 CANCELLED BY INSPECTOR DROCKWELL
Note: Inspection Resulted at 8/11/2015 2:41:14 PM STRIPING INCONSISTANT ONLY VARIOUS AREA``S
ASPHALT PRE-PLACEMENT 08/11/2015 PARTIALLY APPROVED DROCKWELL
Note: THIS IS A REINSPECTION Inspection Resulted at 8/11/2015 2:41:14 PM ENTRANCE APRON BUILD A-1.
DRAINAGE PIPE PLACEMENT 08/07/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 8/7/2015 12:05:47 PM STORM PIPE CONNECTION IN FRONT OF PUBLIX
DRAINAGE PIPE PLACEMENT 08/06/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 8/6/2015 12:00:37 PM STORM IN FRONT OF PUBLIX CONNECTING TO STURCTURE
BLD - SITE STRUCTURE - TRASH DUMPSTER 08/04/2015 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 8/4/2015 12:20:48 PM DUMPSTER BEHIND PUBLIX
BLD - SITE STRUCTURE - TRASH DUMPSTER 08/03/2015 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 8/3/2015 12:07:35 PM TRASH DUMPSTER REAR OF PUBLIX
DRAINAGE STRUCTURE PLACEMENT 07/27/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 7/27/2015 2:34:54 PM REAR STRUCTURE PLACEMENT
ASPHALT PRE-PLACEMENT 07/24/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 7/24/2015 2:40:14 PM IN PROGRESS
ASPHALT PRE-PLACEMENT 07/22/2015 CANCELLED BY APPLICANT CMINI
Note: THIS IS A REINSPECTION
ASPHALT PRE-PLACEMENT 07/21/2015 CANCELLED BY APPLICANT CMINI
BLD - SITE LIGHTING-CONDUCTORS/CONNECTORS 07/21/2015 PARTIALLY APPROVED RMARTIN
Note: THIS IS A REINSPECTION Inspection Resulted at 7/21/2015 3:03:57 PM LOOKED AT SITE LTG CONDUIT, NEED TO CALL IN A EARLY POWER
ASPHALT PRE-PLACEMENT 07/20/2015 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 7/20/2015 1:15:25 PM IN PROGRESS
ROAD BASE/DENSITY 07/20/2015 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 7/20/2015 1:15:24 PM CHECKED COMPACTION PAPERS
ASPHALT PRE-PLACEMENT 07/17/2015 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 7/17/2015 11:04:38 AM IN PROGRESS
BLD - SITE LIGHTING-CONDUCTORS/CONNECTORS 07/16/2015 PARTIALLY APPROVED RMARTIN
Note: THIS IS A REINSPECTION Inspection Resulted at 7/16/2015 11:03:30 AM MARKED ON PLAN
U-GREASE INTERCEPTOR INSTALLED/PLUMBED 07/14/2015 PARTIALLY APPROVED DSPENCER
Note: THIS IS A REINSPECTION Inspection Resulted at 7/14/2015 7:18:15 AM BEING INSTALLED
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 07/08/2015 PARTIALLY APPROVED DSPENCER
Note: THIS IS A REINSPECTION Inspection Resulted at 7/8/2015 3:21:46 PM 6" FIRE BACKFLOW SET BEHIND A1
ASPHALT PRE-PLACEMENT 07/08/2015 APPROVED - AS NOTED DROCKWELL
Note: THIS IS A REINSPECTION Inspection Resulted at 7/8/2015 3:02:08 PM APPROX 30000 SQ FT IN FRONT OF EYECARE EXPRESS
ASPHALT PRE-PLACEMENT 07/06/2015 PARTIALLY APPROVED JCOLASANTI
Note: Inspection Resulted at 7/6/2015 1:43:15 PM ASPHALT AREA AROUND NEW SALSA RES. REMOVED OLD ASPHALT DUE TO GRADING. INSTALLED 1" ASPHALT OVER BASE.
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 07/06/2015 PARTIALLY APPROVED DSPENCER
Note: THIS IS A REINSPECTION Inspection Resulted at 7/6/2015 3:51:30 PM ALL PARTS HAVE NOT ARRIVED NOT COMPLETE
LDSC-TREE BARRICADE 07/06/2015 APPROVED WBUTLER
U-GRAVITY SEWER INSTALL/TESTING 07/02/2015 PARTIALLY APPROVED DSPENCER
Note: THIS IS A REINSPECTION Inspection Resulted at 7/2/2015 2:41:45 PM 1 MANHOLE INSTALLED SOUTH OF ISLAND DOCTORS AND SERVICE REROUTED FROM UPS STORE
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 07/01/2015 PARTIALLY APPROVED DSPENCER
Note: THIS IS A REINSPECTION Inspection Resulted at 7/1/2015 3:41:45 PM DEVICE ON SITE
U-WATER SERVICE INSTALLATION 06/25/2015 PARTIALLY APPROVED DSPENCER
Note: THIS IS A REINSPECTION Inspection Resulted at 6/25/2015 2:35:36 PM CALLED IN IN ERROR FOR 6" WATER MAIN TAP FOR FIRE LINE
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 06/25/2015 PARTIALLY APPROVED DSPENCER
Note: THIS IS A REINSPECTION a 6" tap for the fire system was installed to replace the 4" thet was removed capped and shut off at the main to be abandoned
U-WATER MAIN DISINFECTION SAMPLING 06/25/2015 PARTIALLY APPROVED DSPENCER
Note: samples passed
BLD - SITE STRUCTURE - TRASH DUMPSTER 06/25/2015 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 6/25/2015 1:26:37 PM TRASH DUMPSTER FOOTER SLAB NEXT TO OLD PUBLIX
BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS 06/25/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 6/25/2015 1:26:37 PM AT REAR OF BUILDING
BLD - SITE STRUCTURE - TRASH DUMPSTER 06/24/2015 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 6/24/2015 12:08:07 PM TOP OUT ON TRASH LINTEL STEEL
U - SEWER TIE IN 06/24/2015 PARTIALLY APPROVED DSPENCER
Note: Inspection Resulted at 6/24/2015 3:46:27 PM ALL SEWER WYE INSTALLATIONS BEHIND THESE UNITS HAVE BEEN CUT IN
U - SEWER TIE IN 06/23/2015 APPROVED DSPENCER
U-GRAVITY SEWER INSTALL/TESTING 06/23/2015 PARTIALLY APPROVED DSPENCER
Note: THIS IS A REINSPECTION Inspection Resulted at 6/23/2015 4:26:51 PM 3 SEWER WYES CUT IN INSTALLED TO EXISTING SYSTEM BEHIND BUILDINGS A1 A2
BLD - SITE LIGHTING-CONDUCTORS/CONNECTORS 06/23/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 6/23/2015 2:22:24 PM UNDERGROUND BEHIND PUBLIX SITE LIGHTING
BLD - SITE STRUCTURE - TRASH DUMPSTER 06/23/2015 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 6/23/2015 2:22:24 PM LINTEL STEEL
DRAINAGE PIPE PLACEMENT 06/19/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 6/19/2015 12:07:29 PM NEXT TO G BUILDING
DRAINAGE STRUCTURE PLACEMENT 06/19/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 6/19/2015 12:07:30 PM NEXT TO BUILDING G
BLD - FLATWORK-SIDEWALK/PADS/PATIOS/LANAI/LANDINGS 06/19/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 6/19/2015 12:07:29 PM FRONT OF BUILDINGS
U-REUSE MAIN INSTALL/TESTING 06/16/2015 PARTIALLY APPROVED DSPENCER
Note: Inspection Resulted at 6/16/2015 8:41:29 PM LOCATES WARE MADE AND WORK HAS NOT STARTED
U-GREASE INTERCEPTOR INSTALLED/PLUMBED 06/16/2015 PARTIALLY APPROVED DSPENCER
Note: THIS IS A REINSPECTION Inspection Resulted at 6/16/2015 2:54:15 PM 1050 SET AT NORTH BUILDING ON WEST END TO BE PLUMBED
BLD - SITE STRUCTURE - TRASH DUMPSTER 06/16/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 6/16/2015 12:19:12 PM TRASH DUMPSTER
BLD - SITE STRUCTURE - TRASH DUMPSTER 06/12/2015 PARTIALLY APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
DRAINAGE PIPE PLACEMENT 06/12/2015 PARTIALLY APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION Inspection Resulted at 6/12/2015 1:14:28 PM 50`` OF 36" RCP PIPE AT POND BY SALSA RES.
BLD - SITE STRUCTURE - TRASH DUMPSTER 06/11/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 6/11/2015 2:10:45 PM FOOTER SLABS
BLD - SITE STRUCTURE - TRASH DUMPSTER 06/09/2015 APPROVED CMINI
Note: THIS IS A REINSPECTION
U-GRAVITY SEWER INSTALL/TESTING 06/09/2015 PARTIALLY APPROVED DSPENCER
Note: THIS IS A REINSPECTION Inspection Resulted at 6/9/2015 11:29:19 AM INSTALLED START MANHOLE IN FRONT OD DENTIST NEXT TO PUBLIX MAINS NOT RUN
U-WATER SERVICE INSTALLATION 06/09/2015 PARTIALLY APPROVED DSPENCER
Note: Inspection Resulted at 6/9/2015 11:29:18 AM MORE TO BE DONE
BLD - SITE STRUCTURE - TRASH DUMPSTER 06/05/2015 Disapproved -FEE REQUIRED JCOLASANTI
Note: THIS IS A REINSPECTION Inspection Resulted at 6/5/2015 2:34:58 PM NEED CONTINUOUS REBAR AROUND CORNERS OF SLAP.
DRAINAGE PIPE PLACEMENT 06/05/2015 PARTIALLY APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION Inspection Resulted at 6/5/2015 2:34:58 PM CONTRACTOR USED GREEN PIPE FOR ROOF DRAIN. SHOULD BE WHITE PIPE FOR THIS APPLICATION
U-GREASE INTERCEPTOR PRE-INSTALLATION 05/21/2015 APPROVED DSPENCER
U-GREASE INTERCEPTOR INSTALLED/PLUMBED 05/21/2015 PARTIALLY APPROVED DSPENCER
Note: Inspection Resulted at 5/21/2015 3:57:55 PM INTERCEPTOR HAS BEEN INSTALLED AND PARTIALY PLUMMED
U-GREASE INTERCEPTOR INSTALLED/PLUMBED 05/20/2015 APPROVED DSPENCER
Note: THIS IS A REINSPECTION
U-GREASE INTERCEPTOR PRE-INSTALLATION 05/20/2015 APPROVED DSPENCER
Note: THIS IS A REINSPECTION
U-GREASE INTERCEPTOR PRE-INSTALLATION 05/14/2015 PARTIALLY APPROVED DSPENCER
Note: THIS IS A REINSPECTION Inspection Resulted at 5/14/2015 2:22:17 PM 3 INTERCEPTORS HAVE BEEN SET WEST END OF PROJECT
U-GREASE INTERCEPTOR PRE-INSTALLATION 05/13/2015 PARTIALLY APPROVED DSPENCER
Note: THIS IS A REINSPECTION Inspection Resulted at 5/13/2015 10:46:46 AM OK
U-GREASE INTERCEPTOR INSTALLED/PLUMBED 05/13/2015 PARTIALLY APPROVED DSPENCER
Note: THIS IS A REINSPECTION Inspection Resulted at 5/13/2015 10:46:47 AM 3 INSTALLED SOUTH END OF WEST BUILDING NOT PLUMBED
DRAINAGE STRUCTURE PLACEMENT 05/13/2015 PARTIALLY APPROVED RMARTIN
Note: THIS IS A REINSPECTION Inspection Resulted at 5/13/2015 12:08:58 PM MARKED ON PLAN STRUCTURE PLACEMENT
DRAINAGE PIPE PLACEMENT 05/07/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 5/7/2015 2:31:42 PM PARTIAL
DRAINAGE PIPE PLACEMENT 05/04/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 5/4/2015 1:20:58 PM PARTIAL PIPE PLACEMENT
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 05/01/2015 PARTIALLY APPROVED DSPENCER
Note: THIS IS A REINSPECTION Inspection Resulted at 5/1/2015 10:34:57 AM PSI TESTING OF NEW 8" MAIN BEHIND BUILDING AND PART OF THE NEW 8" LINES IN FRONT OF NEW PUBLIX BEING TESTED
BLD - SITE STRUCTURE - TRASH DUMPSTER 04/29/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 4/29/2015 11:16:44 AM LINTEL INSPECT6ION HIGHLIGHTED ON PLAN
DRAINAGE STRUCTURE PLACEMENT 04/21/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 4/21/2015 3:03:01 PM HIGHLIGHTED ON PLAN, NEED TO CORRECT FALLEN MORTOR
DRAINAGE PIPE PLACEMENT 04/21/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 4/21/2015 3:03:03 PM PIPE PLACEMENT HIGHLIGHTED ON PLAN
BLD - UNDERGROUND SITE LIGHTING CONDUITS 04/16/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 4/16/2015 11:32:57 AM PARTIAL HIGHLIGHTED ON PLAN
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 04/13/2015 PARTIALLY APPROVED DSPENCER
Note: THIS IS A REINSPECTION
U-GREASE INTERCEPTOR INSTALLED/PLUMBED 04/13/2015 CANCELLED BY APPLICANT DSPENCER
U-GREASE INTERCEPTOR PRE-INSTALLATION 04/08/2015 PARTIALLY APPROVED DSPENCER
Note: Inspection Resulted at 4/8/2015 12:47:00 PM NOT ALL HAVE BEEN DELIVERED
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 04/08/2015 PARTIALLY APPROVED DSPENCER
Note: Inspection Resulted at 4/8/2015 7:33:14 AM BUILDING A-1, A-2, DEMO ISLAND WALK - STAGE 1 & 2 (SHEET 42 - 43 OF APPROVED CIVIL PLANS) WORK UNDER WAY
BLD - SITE STRUCTURE - TRASH DUMPSTER 04/08/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 4/8/2015 12:00:51 PM FOOTER ON TRASH DUMPSTER HIGHLIGHTED ON PLAN
BLD - SITE LIGHTING-POLE SET/FIXTURE 04/01/2015 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 4/1/2015 2:59:56 PM FIXTURES LGHTS
DRAINAGE PIPE PLACEMENT 04/01/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 4/1/2015 2:59:56 PM PIPEPLACEMENT HIGHLIGHTED ON PLAN
DRAINAGE STRUCTURE PLACEMENT 04/01/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 4/1/2015 2:59:55 PM STRUCTURES IN PLACE HIGHLIGHTED ON PLACE
DRAINAGE PIPE PLACEMENT 03/25/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION..pipe highkighted on plan
DRAINAGE STRUCTURE PLACEMENT 03/25/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION..structure 42-43
BLD - SITE LIGHTING-POLE SET/FIXTURE 03/25/2015 PARTIALLY APPROVED CMINI
Note: pole sets and underground conduit, highlighted on plan
DRAINAGE STRUCTURE PLACEMENT 03/20/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/20/2015 10:53:10 AM STRUCTURE D3
DRAINAGE STRUCTURE PLACEMENT 03/11/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/11/2015 1:51:06 PM ROOF DRAIN PIPE TO STRUCTURE 32
DRAINAGE PIPE PLACEMENT 03/11/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/11/2015 2:21:06 PM ROOF DRAIN PIPE TO STRUCTURE 32
DRAINAGE PIPE PLACEMENT 03/10/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/10/2015 10:42:58 AM STRUCTURE 31A AND 32 AND PIPING TO THEM
DRAINAGE PIPE PLACEMENT 03/03/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/3/2015 10:29:47 AM PIPE PLACEMENT BETWEEN STRUCTURES 10 AND 11
DRAINAGE STRUCTURE PLACEMENT 03/03/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/3/2015 10:29:48 AM STRUCTURES 10 AND 11
DRAINAGE PIPE PLACEMENT 02/27/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 2/27/2015 1:24:05 PM IN PROGREES OF PIPE AND STRUCTURE, WILL CHECK COMPLETE ON NEXT INSPECTION OF THAT SECTION
DRAINAGE PIPE PLACEMENT 02/26/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 2/26/2015 11:50:38 AM PIPES MUDDED INTO STRUCTURES THAT WERE SET THE OTHER DAY
DRAINAGE PIPE PLACEMENT 02/24/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 2/24/2015 1:17:13 PM PARTIAL CIRCLED ON PLAN
BLD - UNDERGROUND SITE LIGHTING CONDUITS 02/24/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 2/24/2015 1:17:13 PM PARTIAL CIRCLED ON PLAN
DRAINAGE PIPE PLACEMENT 02/13/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 2/13/2015 11:52:12 AM PIPE PLACEMENT BETWEEN STRUCTURES 13,14,15
DRAINAGE STRUCTURE PLACEMENT 02/13/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 2/13/2015 11:52:12 AM STRUCTURES 13,14,15
U-GRAVITY SEWER INSTALL/TESTING 01/30/2015 PARTIALLY APPROVED DSPENCER
Note: Inspection Resulted at 1/30/2015 12:33:57 PM AREA WILL POINTED AND MATERIALS SET FOR MONDAY INSTALLATION STARTING
BLD - UNDERGROUND SITE LIGHTING CONDUITS 01/07/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 1/7/2015 3:16:07 PM PARTIAL UNDERGROUND FROM TRANSFORMER HIGHLIGHTED ON PLANS
LDSC-TREE BARRICADE 11/25/2014 APPROVED CJMINI

Review History

Department Status Date In Date Out
DSD COMPLETE 09/28/2015 09/28/2015
PLLA COMPLETE 09/28/2015 09/28/2015
Note: Approved as noted below: Need to resubmit sheet L3.04 to show the missing drip zone valve near the Old Kings Road entrance and the wire splice box in VUA island 24 per the marked-up plan. Also need to submit a revised sheets L1.05 and L3.05 with the note stating, "As-built only for phase 1 area".
UD1 COMPLETE 09/22/2015 09/24/2015
DSD HOLD 09/22/2015 09/23/2015
Note: 1. Repeat previous comment: Remove the unconstructed truck well and loading dock depicted on the northwest corner of the existing “B” building that appears on the Water As-Built sheet and the Paving, Grading, Drainage sheets. UPDATED: Additionally, please remove the depiction of this truck well and loading dock from all As-built sheets.
PLLA HOLD 09/22/2015 09/23/2015
Note: Landscape and irrigation as-builts not correct. Also only need to submit the sheets for phase 1 as-built and associated detail sheets and not the entire set that is not in phase 1. Marked up plans were e-mailed to the general contractor, landscape contractor and project landscape architect
BLD COMPLETE 09/14/2015 09/16/2015
DSD HOLD 09/14/2015 09/18/2015
Note: Remove the truck well and loading dock depicted on the northwest corner of the existing “B” building that appears on the Water As-Built sheet and the Paving, Grading, Drainage sheets. The structures are not yet approved, nor are they constructed.
ENGIN1 COMPLETE 09/14/2015 09/16/2015
PLLA HOLD 09/14/2015 09/18/2015
Note: No landscape or irrigation as-builts submitted.
SW1 COMPLETE 09/14/2015 09/16/2015
UD1 HOLD 09/14/2015 09/17/2015
Note: Provide updated as-built
ZON COMPLETE 09/14/2015 09/14/2015
Note: No Zoning Review needed.
FI1 COMPLETE 08/27/2015 08/31/2015
ELEC COMPLETE 06/30/2015 07/02/2015
SW1 COMPLETE 06/09/2015 06/09/2015
DSD COMPLETE 06/04/2015 06/08/2015
Note: Retaining wall only as noted on plan.
ZON COMPLETE 06/04/2015 06/09/2015
Note: Retaining wall only as noted on plan.
PLLA COMPLETE 06/04/2015 06/05/2015
BLD COMPLETE 06/04/2015 06/08/2015
BLD HOLD 05/20/2015 05/26/2015
Note: Identify height of retaining wall. If 30" or higher within a three foot horizontal distance a guard rail shall be provided.
DSD HOLD 05/20/2015 05/21/2015
Note: 1. Please provide color elevations of the retaining wall system for review.
ENGIN1 COMPLETE 05/20/2015 05/20/2015
PLLA HOLD 05/20/2015 05/21/2015
Note: 1. As discussed in the field, please revise the plan to show the drainage pipe out of the tree well and tying into the inlet that lies to the southwest of the tree island. 2. As discussed in the field, please revise the plan to clearly show that the parking space that lies between the terminal island and the proposed modified tree island is being eliminated and incorporated into the landscaped area. Currently the plan makes it appear to remain in place. 3. Informational: the parking space being removed could be specified as an area to be decked for cart storage if needed; however, if taking this option, please provide details on the decking to be supplied.
SW1 COMPLETE 05/20/2015 05/20/2015
UD1 COMPLETE 05/20/2015 05/20/2015
ZON HOLD 05/20/2015 05/21/2015
Note: 1. Please revise per DSD (Planning) comment.
ELEC COMPLETE 04/21/2015 04/22/2015
UD1 COMPLETE 11/03/2014 11/03/2014
Note: Released By: CJOHNSON
BLD COMPLETE 10/30/2014 11/03/2014
DSD COMPLETE 10/30/2014 11/04/2014
ENGIN1 COMPLETE 10/30/2014 10/31/2014
SW1 COMPLETE 10/30/2014 10/31/2014
UD1 HOLD 10/30/2014 10/30/2014
Note: Provide FDEP permits
ZON COMPLETE 10/30/2014 11/04/2014

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 09/29/2015
REINSPECTION FEE ¤40.00 09/29/2015
REVISION ¤40.00 09/29/2015
REVISION ¤40.00 09/29/2015
REVISION ¤40.00 09/29/2015
SITE PLAN 20 ¤20.00 11/05/2014
INSPECTION 40 ¤1,880.00 11/05/2014
PERMIT FEE ¤125.00 11/05/2014
Fees Total Due: ¤0.00 Total Paid: ¤2,225.00