Permit #2014100767
Permit Details
Status: COED
| Parcel Id: 41-11-31-4975-00000-0010 |
| Block: 00000 |
| Subdivision: 2272 - ISLAND WALK AT PALM COAST |
| Job Phone: 727-938-9719 |
| Location Address: 250 PALM COAST PKWY NE |
| Type: CSD - COMMERCIAL SITE DEVELOPMENT |
| Issue Date: 11/05/2014 |
| NOC: RECORDED |
| Applicant name: MICHAEL S BEAUSIR |
| Owner: BRANCH ISLAND WALK ASSOCIATES LP |
|
Address 3340 PEACHTREE ROAD NE ATLANTA, GA 30326 |
|
Address SUITE 600 ATLANTA, GA 30326 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤48,000.00 |
| Job Description: G, H , C & D AND PARKING - ISLAND WALK - STAGE 3 & 4 (SHEET 44 - 45 OF APPROVED CIVIL PLANS ) |
| Type: CN |
Contractor
HAWKINS CONSTRUCTION INC
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1430 L AND R INDUSTRIAL BLVD TARPON SPRINGS, FL 34689 |
CGC061198 (Exp: 08/31/2018) | 727-938-9719 | 727-938-3208 |
Inspection History
| Type | Request Date | Result | Inspector |
| TRAFFIC SIGNAGE/PAVEMENT MARKING FINAL | 08/19/2016 | APPROVED | DSPENCER |
| Note: THIS IS A REINSPECTION | |||
| TRAFFIC SIGNAGE/PAVEMENT MARKING FINAL | 08/18/2016 | Disapproved - NO FEE | DSPENCER |
| Note: two stop signs in front of pet co were loose at the base must be corrected and reinspected the contractor was present and working on the issue. this was the only issue found needing repair | |||
| FINAL INSPECTION | 08/18/2016 | FINAL APPROVED | DSCHRAGER |
| Note: All site work and documentation complete | |||
| FINAL SURVEY (COMM - OFFICE USE ONLY) | 08/18/2016 | APPROVED | DRAMIREZ |
| Note: The As-Builts were approved as part of app # 3126. | |||
| BLD - ADA COMPLIANT | 08/18/2016 | APPROVED | CMINI |
| BLD - ADA COMPLIANT | 08/17/2016 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS | 08/17/2016 | APPROVED | CMINI |
| ENG SUBSTANTIAL COMPLETION (OFFICE USE) | 08/16/2016 | APPROVED | DSCHRAGER |
| Note: THIS IS A REINSPECTION At site work substantially complete | |||
| BLD - FLATWORK-SIDEWALK/PADS/PATIOS/LANAI/LANDINGS | 07/18/2016 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 9/10/2015 12:52:05 PM ON GOING INSPECTION | |||
| BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS | 07/18/2016 | APPROVED - AS NOTED | CMINI |
| Note: THIS IS A REINSPECTION. sidewalk around starbucks coffee building | |||
| BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS | 06/08/2016 | Disapproved -FEE REQUIRED | CMINI |
| Note: Inspection Resulted at 6/8/2016 11:16:05 AM COULD NOT LOCATE PLANS, FIRE RISER ROOM LOCKED, NO ONE ON SITE. FORMED RAMP DOES NOT HAVE ANY INDICATIONS OF SLOPE AT MATRESS FIRM PARKING LOT | |||
| EROSION CONTROL / INLET PROTECTION/SILT FENCE | 06/08/2016 | APPROVED | GLALIMA |
| Note: ALL EROSION PASSED / 5 / 25 / 2016 | |||
| SILT FENCE | 06/08/2016 | APPROVED | GLALIMA |
| Note: PASSED | |||
| PROJECT STATUS (OFFICE USE) | 06/08/2016 | Disapproved - NO FEE | GLALIMA |
| Note: WORKING ON OUTHER ISSUE I.E PARKING LOT STRIPING AND SIGNS | |||
| ENG SUBSTANTIAL COMPLETION (OFFICE USE) | 06/08/2016 | Disapproved - NO FEE | GLALIMA |
| Note: WORKING ON OTHER ISSUES 5 / 25 / 2016 | |||
| BLD - ADA COMPLIANT | 05/26/2016 | Disapproved -FEE REQUIRED | CMINI |
| Note: FINAL SURVEY NEEDS TO BE APPROVED AND ON JOB SITE FOR INSPECTION, HANDICAPP ACCESSIBILITY RAMP MISSING AT MATRESS FIRM ACCESSIBLE PARKING AREA. NEED TO CHECK ENTIRE AREA FOR CORRECT RAMPS AND DETECTABLE WARNING MATS, THAT ARE NEEDED AND PER PLAN. | |||
| FINAL INSPECTION | 05/10/2016 | CANCELLED BY INSPECTOR | RLEE |
| Note: THIS IS A REINSPECTION Not ready for final Wrong result code used not fapproved. . | |||
| LDSC- LANDSCAPE FINAL | 04/26/2016 | APPROVED - AS NOTED | WBUTLER |
| Note: STAGES 3 AND 4 4/26/16 Permit Number 2014100767 4/26/16 1. Need to relocate the European fan palm from the entry median off Old Kings Road to the Entry Median off Florida Park Drive due to sight distance complaint and verified by City traffic planner. 2. The substantial landscape and irrigation inspection done on 10/13/15 previously noted that the landscape and irrigation on the east side of the new Publix building could not be landscaped due to work in the next phase. Upon inspection of this area, the following items were noted: a) Two benches that were shown on the approved site plan in front of the Publix building were requested to be relocated to the east side due to Publix policy for no benches in front of their stores. These two benches were not installed. b) The approved plans showed a trash receptacle to the installed next to the benches in front of Publix and this was not installed nor was it relocated to the east side of the building to go with the relocated benches. 3. Four iris shrubs and drip irrigation still have not been installed in the front planter southwest of building "C". This needs to be done. A surety bond has been received for this phase of the project in the amount of $77,289.00. This bond will not be released until all above comments have been addressed. | |||
| FINAL DRAINAGE | 04/21/2016 | APPROVED | GLALIMA |
| Note: THIS IS A REINSPECTION | |||
| MOT - MAINT OF TRAFFIC | 04/20/2016 | APPROVED | GLALIMA |
| Note: THIS IS A REINSPECTION | |||
| ASPHALT PRE-PLACEMENT | 04/20/2016 | APPROVED | GLALIMA |
| Note: THIS IS A REINSPECTION | |||
| UC-SUBSTANTIAL WALK-THRU | 04/20/2016 | APPROVED | DSPENCER |
| Note: THIS IS A REINSPECTION | |||
| U - UTILITY COMMERCIAL FINAL | 04/20/2016 | APPROVED | DSPENCER |
| FINAL DRAINAGE | 02/19/2016 | Disapproved -FEE REQUIRED | RGROSS |
| Note: THIS IS A REINSPECTION INSPECTION FOR PHASE 3 AND 4. ON SITE WITH CONCRACTOR ABOUT DRAINAGE ISSUES AND CORRECTIONS NEEDED TO PASS THE FINAL DRAINAGE INSPECTION. * POT HOLE IN PARKING SPACE NEEDS PULLED AND HOT PATCHED W/ASPHALT TAC * ASPHALT MISSING IN CORNER OF PARKING SPACE NEXT TO CURB AND GUTTER. NEEDS HOT PATCHED * PARKING SPACE HOLDING STORMWATER IN ENTIRE SPACE. STORMWATER NEEDS TO REACH CATCH BASIN AROUND THE CORNER OF THE NEAREST CURB AND GUTTER. SEE GROUND PAINT MARKS BY ALL CORRECTIONS NEEDED. | |||
| FINAL GRADE | 02/19/2016 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION | |||
| FINAL GRADE | 02/18/2016 | PARTIALLY APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION PARTIALLY APPROVED. ADDITIONAL INSPECTION NEEDED. RESCHEDULED FOR 2/19/16. | |||
| FINAL DRAINAGE | 02/18/2016 | PARTIALLY APPROVED | RGROSS |
| Note: PARTIALLY APPROVED. ADDITIONAL INSPECTION SCHEDULED FOR 2/19/16. | |||
| U-WATER METER INSTALLATION/VERIFICATION | 02/18/2016 | APPROVED | DSPENCER |
| Note: THIS IS A REINSPECTION | |||
| U-GRAVITY SEWER INSTALL/TESTING | 02/18/2016 | APPROVED | DSPENCER |
| Note: THIS IS A REINSPECTION | |||
| U-REUSE MAIN INSTALL/TESTING | 02/18/2016 | APPROVED | DSPENCER |
| U-GREASE INTERCEPTOR INSTALLED/PLUMBED | 02/18/2016 | APPROVED | DSPENCER |
| Note: THIS IS A REINSPECTION | |||
| U-GREASE INTERCEPTOR FLOW/DYE TESTED | 02/18/2016 | APPROVED | DSPENCER |
| U-WATER SERVICE INSTALLATION | 02/18/2016 | APPROVED | DSPENCER |
| Note: THIS IS A REINSPECTION | |||
| U-WATER MAIN DISINFECTION | 02/18/2016 | APPROVED | DSPENCER |
| Note: THIS IS A REINSPECTION | |||
| U-WATER MAIN DISINFECTION SAMPLING | 02/18/2016 | APPROVED | DSPENCER |
| U-GREASE INTERCEPTOR PRE-INSTALLATION | 02/18/2016 | APPROVED | DSPENCER |
| LDSC- SUBSTANTIAL COMPLETE (OFFICE USE) | 10/29/2015 | APPROVED - AS NOTED | WBUTLER |
| Note: Permit Number 2014100767 10/29/15 1. Need to pull the mulch off all the trunks and stems of the trees and shrubs as well as exposing all tree bubblers and valve box covers. 2. Need to finish the landscape and irrigation by the Island Doctors building (building D) as well as along the northern landscape buffer adjacent to Arbor Trace which also includes sod. 3. Need to finish the landscape and irrigation in the median of the entrance off Palm Coast Parkway. 4. East side of the new Publix building could not be landscaped or irrigated due to the work in the next phase. 5. A perimeter buffer hedge of podocarpus was originally on the plans to buffer the parking from the adjacent Mobil gas station site and from Palm Coast Parkway. During subsequent revisions, this hedge somehow was removed and not detected in the review process. The sidewalk in this area was shifted to be adjacent t the curb along the roadway, therefore providing adequate space for a narrow shrub planting of 3-gallon, 24" tall podocarpus approximately 245' long. This is a City requirement that must be met and therefore added to the project. 6. The existing landscaping noted to remain on the south side of the Island Doctors building has been removed and needs to be replaced. Project landscape architect shall submit a revised landscape and irrigation plan for review and approval prior to planting. 7. Need to add 4 iris and irrigation in the small square planting bed in front of the UPS store. 8. Landscape and irrigation as-builts need to be submitted and approved. Make sure all pages of the landscape and irrigation plans are included. 9. Will need to run the drip irrigation after the as-builts have been received to confirm the correct location of all valves, flush plugs, etc. 10. Some of the required buffer shrubs around dumpsters and backflow preventers around building G are not the required 7-gallon, 30" tall viburnum. Need to replace the 3-gallon shrubs with larger shrubs. A surety bond has been submitted for this phase of the project in the amount of $77,289.00. It did not include 1.5 times the cost of the as-built preparation, but the bond includes a substantial amount of landscaping that is already done and approved. There should be sufficient funds to pay for the as-built should the bond need to be called in to complete the work. Bond amount approved. Ok to call in the landscape final at this time. | |||
| LDSC-TREE BARRICADE | 10/29/2015 | APPROVED | WBUTLER |
| LDSC-PRE-PLANTING TREE QUALITY | 10/29/2015 | APPROVED | WBUTLER |
| FINAL GRADE PRIOR TO SOD | 10/28/2015 | APPROVED - AS NOTED | WBUTLER |
| Note: THIS IS A REINSPECTION 10/29/15 1) All sod is not done along the rear landscape buffer behind the buildings. A bond has been received to cover this and will be inspected and approved prior to the bond release. | |||
| DRAINAGE STRUCTURE PLACEMENT | 10/28/2015 | APPROVED - AS NOTED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 10/28/2015 1:28:06 PM STRUCTURES AT REAR OF A1-A2 | |||
| DRAINAGE STRUCTURE PLACEMENT | 10/27/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 10/27/2015 9:47:48 AM DS 35 REAR OF A1 AND A2 | |||
| U-GREASE INTERCEPTOR INSTALLED/PLUMBED | 10/15/2015 | PARTIALLY APPROVED | DSPENCER |
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 10/15/2015 | APPROVED | DSPENCER |
| Note: THIS IS A REINSPECTION | |||
| TRAFFIC SIGNAGE/PAVEMENT MARKING FINAL | 10/14/2015 | APPROVED - AS NOTED | CMINI |
| Note: all ok for publix only | |||
| FINAL INSPECTION | 10/14/2015 | PARTIALLY APPROVED | CMINI |
| Note: final only for publix | |||
| FINAL GRADE | 10/13/2015 | APPROVED | WBUTLER |
| Note: Inspection Resulted at 10/13/2015 1:25:36 PM OK FOR PUBLIX | |||
| FINAL GRADE PRIOR TO SOD | 10/13/2015 | APPROVED | WBUTLER |
| Note: Inspection Resulted at 10/13/2015 1:25:37 PM OK FOR PUBLIX | |||
| BLD - UNDERGROUND SITE LIGHTING CONDUITS | 10/13/2015 | APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION | |||
| TURBIDITY BARRIER | 10/13/2015 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 10/13/2015 1:25:38 PM N/A | |||
| CONSTRUCTION ENTRANCE | 10/13/2015 | APPROVED | CMINI |
| MOT - MAINT OF TRAFFIC | 10/13/2015 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 10/13/2015 1:30:38 PM ARROVED FOR PUBLIX PORTION ONLY | |||
| SILT FENCE | 10/13/2015 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 10/13/2015 1:25:38 PM OK FOR PUBLIX | |||
| EROSION CONTROL / INLET PROTECTION/SILT FENCE | 10/13/2015 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 10/13/2015 1:25:39 PM OK FOR PUBLIX | |||
| LDSC- SUBSTANTIAL COMPLETE (OFFICE USE) | 10/13/2015 | APPROVED - AS NOTED | WBUTLER |
| Note: 10/13/15 WMB ISLAND WALK STAGE 3 & 4 SUBSTANTIAL LANDSCAPE/IRRIGATION PUNCHLIST Permit Number 2014100767 10/13/15 1. Need to pull the mulch off all the trunks and stems of the trees and shrubs as well as exposing all tree bubblers and valve box covers. 2. Need to stake the trees per the plans. 3. Need to finish the landscape and irrigation by the Island Doctors building and along the northern landscape buffer adjacent to Arbor Trace which also includes sod. 4. Need to finish the landscape and irrigation in the median of the entrance off Palm Coast Parkway. 5. East side of the new Publix building could not be landscaped or irrigated due to the work in the next phase. 6. A perimeter buffer hedge of podocarpus was originally on the plans to buffer the parking from the adjacent Mobil gas station site and from Palm Coast Parkway. During subsequent revisions, this hedge somehow was removed and not detected in the review process. The sidewalk in this area was shifted to be adjacent t the curb along the roadway, therefore providing adequate space for a narrow shrub planting of 3-gallon, 24" tall podocarpus approximately 245' long. This is a City requirement that must be met and therefore added to the project. 7. Two crape myrtles still need to be planted in the parking lot island northeast of building G-2. 8. Prune off any broken branches of the trees and shrubs. 9. The existing landscaping noted to remain on the south side of the Island Doctors building has been removed and needs to be replaced. Project landscape architect shall submit a revised landscape and irrigation plan for review and approval prior to planting. 10. Need to add 4 iris and irrigation in the small square planting bed in front of the UPS store. 11. Landscape and irrigation as-builts need to be submitted and approved. Make sure all pages of the landscape and irrigation plans are included. 12. Will need to run the drip irrigation after the as-builts have been received to confirm the correct location of all valves, flush plugs, etc. A surety bond has been submitted for this phase of the project in the amount of $77,289.00. It did not include 1.5 times the cost of the as-built preparation, but the bond includes a substantial amount of landscaping that is already done and approved. There should be sufficient funds to pay for the as-built should the bond need to be called in to complete the work. Bond amount approved. Ok to call in the landscape final at this time. | |||
| UC-SUBSTANTIAL WALK-THRU | 10/13/2015 | PARTIALLY APPROVED | DSPENCER |
| Note: Inspection Resulted at 10/13/2015 3:09:47 PM PUBLIX SHOPPING AREA AND PARKING ONLY | |||
| DRAINAGE STRUCTURE PLACEMENT | 10/12/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 10/12/2015 1:39:36 PM PUBLIX PART COMPLETE | |||
| BLD - ADA COMPLIANT | 10/12/2015 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 10/12/2015 1:39:34 PM PUBLIX PART COMPLETE | |||
| DRAINAGE PIPE PLACEMENT | 10/12/2015 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| RETENTION /DETENTION STABILIZATION | 10/12/2015 | APPROVED | CMINI |
| BLD - SITE STRUCTURE - TRASH DUMPSTER | 10/12/2015 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 10/12/2015 1:39:35 PM PUBLIX PART COMPLETE | |||
| BLD - FENCE AND WALL | 10/12/2015 | APPROVED | RMARTIN |
| BLD - SITE STRUCTURE-RETAINING WALL | 10/12/2015 | APPROVED | CMINI |
| BLD - SITE LIGHTING-PLACEMENT/FOUNDATION | 10/12/2015 | APPROVED | RMARTIN |
| BLD - UNDERGROUND SITE LIGHTING CONDUITS | 10/12/2015 | PARTIALLY APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 10/12/2015 2:28:54 PM CONDUIT IN REAR FOR FEEDERS | |||
| BLD - SITE LIGHTING-POLE SET/FIXTURE | 10/12/2015 | APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION | |||
| BLD - SITE LIGHTING-CONDUCTORS/CONNECTORS | 10/12/2015 | APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION | |||
| BLD - SITE LIGHTING EXTERIOR MOUNTED | 10/12/2015 | APPROVED | RMARTIN |
| STABILIZATION | 10/12/2015 | APPROVED | CMINI |
| LDSC-PRE-PLANTING TREE QUALITY | 10/09/2015 | APPROVED - AS NOTED | WBUTLER |
| Note: THIS IS A REINSPECTION 10/9/15 WMB This is a new inspection of replacement trees that were rejected on 10/8/15. The replacement trees required some pruning to make them a Florida Number One or better quality, but after pruning they passed and can be planted. | |||
| LDSC-PRE-PLANTING TREE QUALITY | 10/08/2015 | PARTIALLY APPROVED | WBUTLER |
| Note: 10/8/15 WMB Four magnolia trees were rejected as they did not meet the Florida Number one quality criteria. Four others that did not meet it as well were able to be trimmed on site to bring them into conformance. Need to call in another tree quality inspection when the replacement magnolia trees come in. | |||
| U-WATER SERVICE INSTALLATION | 10/06/2015 | PARTIALLY APPROVED | DSPENCER |
| Note: THIS IS A REINSPECTION | |||
| ASPHALT PRE-PLACEMENT | 10/06/2015 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| ASPHALT PRE-PLACEMENT | 10/06/2015 | APPROVED | DROCKWELL |
| FORM BOARD | 10/02/2015 | APPROVED - AS NOTED | DROCKWELL |
| Note: Inspection Resulted at 10/5/2015 2:20:19 PM PLACCARD CLEAN-UP | |||
| DRAINAGE PIPE PLACEMENT | 10/02/2015 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| CONCRETE FORM | 10/01/2015 | APPROVED - AS NOTED | DROCKWELL |
| Note: Inspection Resulted at 10/5/2015 2:20:18 PM PLACCARD CLEAN-UP | |||
| LDSC-LOCATE BACKFLOW PREVENTOR OR PAD/ ELEC TRANS | 10/01/2015 | APPROVED | WBUTLER |
| LDSC-SITE LIGHT STAKE LOCATE | 10/01/2015 | APPROVED | WBUTLER |
| U-WATER MAIN DISINFECTION | 09/25/2015 | PARTIALLY APPROVED | DSPENCER |
| Note: Inspection Resulted at 9/25/2015 11:49:00 AM LINE BEHIND OLD BEALS HAS BEEN CHLORINATED | |||
| BLD - SITE LIGHTING-CONDUCTORS/CONNECTORS | 09/25/2015 | PARTIALLY APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 9/25/2015 2:26:22 PM LIGHTHOUSE SIGN BY MOBIL STATION, CONDUIT, TRENCH, CONDUCTORS | |||
| CURBING AND GUTTER | 09/24/2015 | APPROVED - AS NOTED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 9/24/2015 2:01:08 PM F-CURB TRENCH ACROSS FROM STARBUCKS | |||
| BLD - SITE LIGHTING-POLE SET/FIXTURE | 09/24/2015 | PARTIALLY APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 9/24/2015 1:57:38 PM REAR OF PUBLIX | |||
| BLD - SITE LIGHTING-CONDUCTORS/CONNECTORS | 09/24/2015 | PARTIALLY APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 9/24/2015 1:57:38 PM REAR OF PUBLIX | |||
| ROAD BASE/DENSITY | 09/24/2015 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 10/12/2015 1:39:33 PM PUBLIX PART COMPLETE | |||
| U-WATER SERVICE INSTALLATION | 09/24/2015 | PARTIALLY APPROVED | DSPENCER |
| Note: THIS IS A REINSPECTION | |||
| ASPHALT PRE-PLACEMENT | 09/16/2015 | CANCELLED BY APPLICANT | CMINI |
| ASPHALT PRE-PLACEMENT | 09/10/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 9/10/2015 12:52:05 PM IN PROGRESS | |||
| BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS | 09/10/2015 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 9/10/2015 12:52:04 PM ON GOING INSPECTION | |||
| DRAINAGE STRUCTURE PLACEMENT | 09/10/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 9/10/2015 12:21:59 PM PIPE AND STRUCTURE BEHIND BUILDING C | |||
| DRAINAGE PIPE PLACEMENT | 09/10/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 9/10/2015 12:22:00 PM PIPE AND STRUCTURE BEHIND BUILDING C | |||
| BLD - SITE LIGHTING-CONDUCTORS/CONNECTORS | 09/10/2015 | PARTIALLY APPROVED | RMARTIN |
| Note: Inspection Resulted at 9/10/2015 11:42:29 AM STILL NEED CHECK ONE POLE NOT READY, AND SIGN, COVERS | |||
| U-WATER SERVICE INSTALLATION | 09/10/2015 | PARTIALLY APPROVED | JNICHOLS |
| Note: THIS IS A REINSPECTION Inspection Resulted at 9/11/2015 3:21:17 PM WORK NOT COMPLETED | |||
| ASPHALT PRE-PLACEMENT | 08/28/2015 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 8/28/2015 11:35:56 AM IN PROGRESS OF PLACEMENT | |||
| DRAINAGE PIPE PLACEMENT | 08/27/2015 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 8/27/2015 11:28:00 AM STRUCTURES 4 AND 5 | |||
| DRAINAGE STRUCTURE PLACEMENT | 08/27/2015 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 8/27/2015 11:27:59 AM PIPE PLACEMENT FROM STRUCTURE 4 AND 5 | |||
| U-WATER SERVICE INSTALLATION | 08/27/2015 | PARTIALLY APPROVED | DSPENCER |
| Note: THIS IS A REINSPECTION | |||
| U-GRAVITY SEWER INSTALL/TESTING | 08/18/2015 | PARTIALLY APPROVED | DSPENCER |
| Note: THIS IS A REINSPECTION Inspection Resulted at 8/19/2015 7:24:18 AM GRAVITY SEWER LINE WORK CONTINUES | |||
| U-GRAVITY SEWER INSTALL/TESTING | 08/12/2015 | PARTIALLY APPROVED | DSPENCER |
| Note: Inspection Resulted at 8/13/2015 7:05:37 AM WORK CONTINUES 2ND RUN | |||
| CURBING AND GUTTER | 07/31/2015 | PARTIALLY APPROVED | CMINI |
| CURBING AND GUTTER | 07/23/2015 | APPROVED | CMINI |
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 07/23/2015 | PARTIALLY APPROVED | DSPENCER |
| Note: THIS IS A REINSPECTION | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 07/22/2015 | PARTIALLY APPROVED | DSPENCER |
| Note: THIS IS A REINSPECTION Inspection Resulted at 7/22/2015 3:44:28 PM INSTALLED 4IN FIRE LINE WEST OF PUBLX | |||
| BLD - SITE LIGHTING-POLE SET/FIXTURE | 07/22/2015 | PARTIALLY APPROVED | RMARTIN |
| Note: Inspection Resulted at 7/22/2015 1:48:26 PM POLE SET, MARKED ON PLAN | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 07/20/2015 | PARTIALLY APPROVED | DSPENCER |
| Note: THIS IS A REINSPECTION Inspection Resulted at 7/21/2015 7:54:52 AM INSERT-A VALVE INSTALLED | |||
| U-WATER SERVICE INSTALLATION | 07/16/2015 | PARTIALLY APPROVED | DSPENCER |
| Note: Inspection Resulted at 7/16/2015 11:10:44 AM UPS CONNECTED | |||
| BLD - UNDERGROUND SITE LIGHTING CONDUITS | 07/16/2015 | PARTIALLY APPROVED | RMARTIN |
| Note: Inspection Resulted at 7/16/2015 11:03:30 AM MARKED ON PLAN | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 07/14/2015 | PARTIALLY APPROVED | DSPENCER |
| Note: THIS IS A REINSPECTION Inspection Resulted at 7/14/2015 3:48:57 PM PRESSURE TESTED 6IN FIRE LINE TO DEVICE THAT WAS REPLACED FROM 4IN | |||
| U-GRAVITY SEWER INSTALL/TESTING | 07/09/2015 | APPROVED | DSPENCER |
| Note: THIS IS A REINSPECTION Inspection Resulted at 7/9/2015 2:58:54 PM OUTSIDE DROP CONCREET ENCASEMET PLACED | |||
| U-WATER METER INSTALLATION/VERIFICATION | 07/09/2015 | PARTIALLY APPROVED | DSPENCER |
| Note: Inspection Resulted at 7/9/2015 2:58:54 PM 2`` REUSE METER AND PIT SET | |||
| U-GRAVITY SEWER INSTALL/TESTING | 07/08/2015 | PARTIALLY APPROVED | DSPENCER |
| Note: Inspection Resulted at 7/8/2015 3:21:45 PM MANHOLE OUTSIDE DROP ENCASED WITH CONCRETE | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 07/08/2015 | PARTIALLY APPROVED | DSPENCER |
| Note: Inspection Resulted at 7/8/2015 3:21:45 PM DEVICE ASSEMBLED AND PLACED |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 10/30/2014 | 11/03/2014 |
| DSD | COMPLETE | 10/30/2014 | 11/04/2014 |
| ENGIN1 | COMPLETE | 10/30/2014 | 10/31/2014 |
| SW1 | COMPLETE | 10/30/2014 | 10/31/2014 |
| UD1 | COMPLETE | 10/30/2014 | 10/30/2014 |
| ZON | COMPLETE | 10/30/2014 | 11/04/2014 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 08/11/2016 |
| REINSPECTION FEE | ¤40.00 | 08/11/2016 |
| REINSPECTION FEE | ¤40.00 | 05/09/2016 |
| REINSPECTION FEE | ¤40.00 | 05/09/2016 |
| INSPECTION 40 | ¤1,880.00 | 11/05/2014 |
| PERMIT FEE | ¤125.00 | 11/05/2014 |
| SITE PLAN 20 | ¤20.00 | 11/05/2014 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤2,185.00 |