I want to search for...

Permit #2014100767

Permit Details

Status: COED

Parcel Id: 41-11-31-4975-00000-0010
Block: 00000
Subdivision: 2272 - ISLAND WALK AT PALM COAST
Job Phone: 727-938-9719
Location Address: 250 PALM COAST PKWY NE
Type: CSD - COMMERCIAL SITE DEVELOPMENT
Issue Date: 11/05/2014
NOC: RECORDED
Applicant name: MICHAEL S BEAUSIR
Owner: BRANCH ISLAND WALK ASSOCIATES LP

Address

3340 PEACHTREE ROAD NE

ATLANTA, GA 30326

Address

SUITE 600

ATLANTA, GA 30326

Lot: 0010
Contracted Stated Job Value: ¤48,000.00
Job Description: G, H , C & D AND PARKING - ISLAND WALK - STAGE 3 & 4 (SHEET 44 - 45 OF APPROVED CIVIL PLANS )
Type: CN

Contractor

HAWKINS CONSTRUCTION INC
Status Location Address State License Number Phone Fax
CANCEL

1430 L AND R INDUSTRIAL BLVD

TARPON SPRINGS, FL 34689

CGC061198 (Exp: 08/31/2018) 727-938-9719 727-938-3208

Inspection History

Type Request Date Result Inspector
TRAFFIC SIGNAGE/PAVEMENT MARKING FINAL 08/19/2016 APPROVED DSPENCER
Note: THIS IS A REINSPECTION
TRAFFIC SIGNAGE/PAVEMENT MARKING FINAL 08/18/2016 Disapproved - NO FEE DSPENCER
Note: two stop signs in front of pet co were loose at the base must be corrected and reinspected the contractor was present and working on the issue. this was the only issue found needing repair
FINAL INSPECTION 08/18/2016 FINAL APPROVED DSCHRAGER
Note: All site work and documentation complete
FINAL SURVEY (COMM - OFFICE USE ONLY) 08/18/2016 APPROVED DRAMIREZ
Note: The As-Builts were approved as part of app # 3126.
BLD - ADA COMPLIANT 08/18/2016 APPROVED CMINI
BLD - ADA COMPLIANT 08/17/2016 APPROVED CMINI
Note: THIS IS A REINSPECTION
BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS 08/17/2016 APPROVED CMINI
ENG SUBSTANTIAL COMPLETION (OFFICE USE) 08/16/2016 APPROVED DSCHRAGER
Note: THIS IS A REINSPECTION At site work substantially complete
BLD - FLATWORK-SIDEWALK/PADS/PATIOS/LANAI/LANDINGS 07/18/2016 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 9/10/2015 12:52:05 PM ON GOING INSPECTION
BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS 07/18/2016 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION. sidewalk around starbucks coffee building
BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS 06/08/2016 Disapproved -FEE REQUIRED CMINI
Note: Inspection Resulted at 6/8/2016 11:16:05 AM COULD NOT LOCATE PLANS, FIRE RISER ROOM LOCKED, NO ONE ON SITE. FORMED RAMP DOES NOT HAVE ANY INDICATIONS OF SLOPE AT MATRESS FIRM PARKING LOT
EROSION CONTROL / INLET PROTECTION/SILT FENCE 06/08/2016 APPROVED GLALIMA
Note: ALL EROSION PASSED / 5 / 25 / 2016
SILT FENCE 06/08/2016 APPROVED GLALIMA
Note: PASSED
PROJECT STATUS (OFFICE USE) 06/08/2016 Disapproved - NO FEE GLALIMA
Note: WORKING ON OUTHER ISSUE I.E PARKING LOT STRIPING AND SIGNS
ENG SUBSTANTIAL COMPLETION (OFFICE USE) 06/08/2016 Disapproved - NO FEE GLALIMA
Note: WORKING ON OTHER ISSUES 5 / 25 / 2016
BLD - ADA COMPLIANT 05/26/2016 Disapproved -FEE REQUIRED CMINI
Note: FINAL SURVEY NEEDS TO BE APPROVED AND ON JOB SITE FOR INSPECTION, HANDICAPP ACCESSIBILITY RAMP MISSING AT MATRESS FIRM ACCESSIBLE PARKING AREA. NEED TO CHECK ENTIRE AREA FOR CORRECT RAMPS AND DETECTABLE WARNING MATS, THAT ARE NEEDED AND PER PLAN.
FINAL INSPECTION 05/10/2016 CANCELLED BY INSPECTOR RLEE
Note: THIS IS A REINSPECTION Not ready for final Wrong result code used not fapproved. .
LDSC- LANDSCAPE FINAL 04/26/2016 APPROVED - AS NOTED WBUTLER
Note: STAGES 3 AND 4 4/26/16 Permit Number 2014100767 4/26/16 1. Need to relocate the European fan palm from the entry median off Old Kings Road to the Entry Median off Florida Park Drive due to sight distance complaint and verified by City traffic planner. 2. The substantial landscape and irrigation inspection done on 10/13/15 previously noted that the landscape and irrigation on the east side of the new Publix building could not be landscaped due to work in the next phase. Upon inspection of this area, the following items were noted: a) Two benches that were shown on the approved site plan in front of the Publix building were requested to be relocated to the east side due to Publix policy for no benches in front of their stores. These two benches were not installed. b) The approved plans showed a trash receptacle to the installed next to the benches in front of Publix and this was not installed nor was it relocated to the east side of the building to go with the relocated benches. 3. Four iris shrubs and drip irrigation still have not been installed in the front planter southwest of building "C". This needs to be done. A surety bond has been received for this phase of the project in the amount of $77,289.00. This bond will not be released until all above comments have been addressed.
FINAL DRAINAGE 04/21/2016 APPROVED GLALIMA
Note: THIS IS A REINSPECTION
MOT - MAINT OF TRAFFIC 04/20/2016 APPROVED GLALIMA
Note: THIS IS A REINSPECTION
ASPHALT PRE-PLACEMENT 04/20/2016 APPROVED GLALIMA
Note: THIS IS A REINSPECTION
UC-SUBSTANTIAL WALK-THRU 04/20/2016 APPROVED DSPENCER
Note: THIS IS A REINSPECTION
U - UTILITY COMMERCIAL FINAL 04/20/2016 APPROVED DSPENCER
FINAL DRAINAGE 02/19/2016 Disapproved -FEE REQUIRED RGROSS
Note: THIS IS A REINSPECTION INSPECTION FOR PHASE 3 AND 4. ON SITE WITH CONCRACTOR ABOUT DRAINAGE ISSUES AND CORRECTIONS NEEDED TO PASS THE FINAL DRAINAGE INSPECTION. * POT HOLE IN PARKING SPACE NEEDS PULLED AND HOT PATCHED W/ASPHALT TAC * ASPHALT MISSING IN CORNER OF PARKING SPACE NEXT TO CURB AND GUTTER. NEEDS HOT PATCHED * PARKING SPACE HOLDING STORMWATER IN ENTIRE SPACE. STORMWATER NEEDS TO REACH CATCH BASIN AROUND THE CORNER OF THE NEAREST CURB AND GUTTER. SEE GROUND PAINT MARKS BY ALL CORRECTIONS NEEDED.
FINAL GRADE 02/19/2016 APPROVED RGROSS
Note: THIS IS A REINSPECTION
FINAL GRADE 02/18/2016 PARTIALLY APPROVED RGROSS
Note: THIS IS A REINSPECTION PARTIALLY APPROVED. ADDITIONAL INSPECTION NEEDED. RESCHEDULED FOR 2/19/16.
FINAL DRAINAGE 02/18/2016 PARTIALLY APPROVED RGROSS
Note: PARTIALLY APPROVED. ADDITIONAL INSPECTION SCHEDULED FOR 2/19/16.
U-WATER METER INSTALLATION/VERIFICATION 02/18/2016 APPROVED DSPENCER
Note: THIS IS A REINSPECTION
U-GRAVITY SEWER INSTALL/TESTING 02/18/2016 APPROVED DSPENCER
Note: THIS IS A REINSPECTION
U-REUSE MAIN INSTALL/TESTING 02/18/2016 APPROVED DSPENCER
U-GREASE INTERCEPTOR INSTALLED/PLUMBED 02/18/2016 APPROVED DSPENCER
Note: THIS IS A REINSPECTION
U-GREASE INTERCEPTOR FLOW/DYE TESTED 02/18/2016 APPROVED DSPENCER
U-WATER SERVICE INSTALLATION 02/18/2016 APPROVED DSPENCER
Note: THIS IS A REINSPECTION
U-WATER MAIN DISINFECTION 02/18/2016 APPROVED DSPENCER
Note: THIS IS A REINSPECTION
U-WATER MAIN DISINFECTION SAMPLING 02/18/2016 APPROVED DSPENCER
U-GREASE INTERCEPTOR PRE-INSTALLATION 02/18/2016 APPROVED DSPENCER
LDSC- SUBSTANTIAL COMPLETE (OFFICE USE) 10/29/2015 APPROVED - AS NOTED WBUTLER
Note: Permit Number 2014100767 10/29/15 1. Need to pull the mulch off all the trunks and stems of the trees and shrubs as well as exposing all tree bubblers and valve box covers. 2. Need to finish the landscape and irrigation by the Island Doctors building (building D) as well as along the northern landscape buffer adjacent to Arbor Trace which also includes sod. 3. Need to finish the landscape and irrigation in the median of the entrance off Palm Coast Parkway. 4. East side of the new Publix building could not be landscaped or irrigated due to the work in the next phase. 5. A perimeter buffer hedge of podocarpus was originally on the plans to buffer the parking from the adjacent Mobil gas station site and from Palm Coast Parkway. During subsequent revisions, this hedge somehow was removed and not detected in the review process. The sidewalk in this area was shifted to be adjacent t the curb along the roadway, therefore providing adequate space for a narrow shrub planting of 3-gallon, 24" tall podocarpus approximately 245' long. This is a City requirement that must be met and therefore added to the project. 6. The existing landscaping noted to remain on the south side of the Island Doctors building has been removed and needs to be replaced. Project landscape architect shall submit a revised landscape and irrigation plan for review and approval prior to planting. 7. Need to add 4 iris and irrigation in the small square planting bed in front of the UPS store. 8. Landscape and irrigation as-builts need to be submitted and approved. Make sure all pages of the landscape and irrigation plans are included. 9. Will need to run the drip irrigation after the as-builts have been received to confirm the correct location of all valves, flush plugs, etc. 10. Some of the required buffer shrubs around dumpsters and backflow preventers around building G are not the required 7-gallon, 30" tall viburnum. Need to replace the 3-gallon shrubs with larger shrubs. A surety bond has been submitted for this phase of the project in the amount of $77,289.00. It did not include 1.5 times the cost of the as-built preparation, but the bond includes a substantial amount of landscaping that is already done and approved. There should be sufficient funds to pay for the as-built should the bond need to be called in to complete the work. Bond amount approved. Ok to call in the landscape final at this time.
LDSC-TREE BARRICADE 10/29/2015 APPROVED WBUTLER
LDSC-PRE-PLANTING TREE QUALITY 10/29/2015 APPROVED WBUTLER
FINAL GRADE PRIOR TO SOD 10/28/2015 APPROVED - AS NOTED WBUTLER
Note: THIS IS A REINSPECTION 10/29/15 1) All sod is not done along the rear landscape buffer behind the buildings. A bond has been received to cover this and will be inspected and approved prior to the bond release.
DRAINAGE STRUCTURE PLACEMENT 10/28/2015 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 10/28/2015 1:28:06 PM STRUCTURES AT REAR OF A1-A2
DRAINAGE STRUCTURE PLACEMENT 10/27/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 10/27/2015 9:47:48 AM DS 35 REAR OF A1 AND A2
U-GREASE INTERCEPTOR INSTALLED/PLUMBED 10/15/2015 PARTIALLY APPROVED DSPENCER
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 10/15/2015 APPROVED DSPENCER
Note: THIS IS A REINSPECTION
TRAFFIC SIGNAGE/PAVEMENT MARKING FINAL 10/14/2015 APPROVED - AS NOTED CMINI
Note: all ok for publix only
FINAL INSPECTION 10/14/2015 PARTIALLY APPROVED CMINI
Note: final only for publix
FINAL GRADE 10/13/2015 APPROVED WBUTLER
Note: Inspection Resulted at 10/13/2015 1:25:36 PM OK FOR PUBLIX
FINAL GRADE PRIOR TO SOD 10/13/2015 APPROVED WBUTLER
Note: Inspection Resulted at 10/13/2015 1:25:37 PM OK FOR PUBLIX
BLD - UNDERGROUND SITE LIGHTING CONDUITS 10/13/2015 APPROVED RMARTIN
Note: THIS IS A REINSPECTION
TURBIDITY BARRIER 10/13/2015 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 10/13/2015 1:25:38 PM N/A
CONSTRUCTION ENTRANCE 10/13/2015 APPROVED CMINI
MOT - MAINT OF TRAFFIC 10/13/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 10/13/2015 1:30:38 PM ARROVED FOR PUBLIX PORTION ONLY
SILT FENCE 10/13/2015 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 10/13/2015 1:25:38 PM OK FOR PUBLIX
EROSION CONTROL / INLET PROTECTION/SILT FENCE 10/13/2015 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 10/13/2015 1:25:39 PM OK FOR PUBLIX
LDSC- SUBSTANTIAL COMPLETE (OFFICE USE) 10/13/2015 APPROVED - AS NOTED WBUTLER
Note: 10/13/15 WMB ISLAND WALK STAGE 3 & 4 SUBSTANTIAL LANDSCAPE/IRRIGATION PUNCHLIST Permit Number 2014100767 10/13/15 1. Need to pull the mulch off all the trunks and stems of the trees and shrubs as well as exposing all tree bubblers and valve box covers. 2. Need to stake the trees per the plans. 3. Need to finish the landscape and irrigation by the Island Doctors building and along the northern landscape buffer adjacent to Arbor Trace which also includes sod. 4. Need to finish the landscape and irrigation in the median of the entrance off Palm Coast Parkway. 5. East side of the new Publix building could not be landscaped or irrigated due to the work in the next phase. 6. A perimeter buffer hedge of podocarpus was originally on the plans to buffer the parking from the adjacent Mobil gas station site and from Palm Coast Parkway. During subsequent revisions, this hedge somehow was removed and not detected in the review process. The sidewalk in this area was shifted to be adjacent t the curb along the roadway, therefore providing adequate space for a narrow shrub planting of 3-gallon, 24" tall podocarpus approximately 245' long. This is a City requirement that must be met and therefore added to the project. 7. Two crape myrtles still need to be planted in the parking lot island northeast of building G-2. 8. Prune off any broken branches of the trees and shrubs. 9. The existing landscaping noted to remain on the south side of the Island Doctors building has been removed and needs to be replaced. Project landscape architect shall submit a revised landscape and irrigation plan for review and approval prior to planting. 10. Need to add 4 iris and irrigation in the small square planting bed in front of the UPS store. 11. Landscape and irrigation as-builts need to be submitted and approved. Make sure all pages of the landscape and irrigation plans are included. 12. Will need to run the drip irrigation after the as-builts have been received to confirm the correct location of all valves, flush plugs, etc. A surety bond has been submitted for this phase of the project in the amount of $77,289.00. It did not include 1.5 times the cost of the as-built preparation, but the bond includes a substantial amount of landscaping that is already done and approved. There should be sufficient funds to pay for the as-built should the bond need to be called in to complete the work. Bond amount approved. Ok to call in the landscape final at this time.
UC-SUBSTANTIAL WALK-THRU 10/13/2015 PARTIALLY APPROVED DSPENCER
Note: Inspection Resulted at 10/13/2015 3:09:47 PM PUBLIX SHOPPING AREA AND PARKING ONLY
DRAINAGE STRUCTURE PLACEMENT 10/12/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 10/12/2015 1:39:36 PM PUBLIX PART COMPLETE
BLD - ADA COMPLIANT 10/12/2015 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 10/12/2015 1:39:34 PM PUBLIX PART COMPLETE
DRAINAGE PIPE PLACEMENT 10/12/2015 APPROVED CMINI
Note: THIS IS A REINSPECTION
RETENTION /DETENTION STABILIZATION 10/12/2015 APPROVED CMINI
BLD - SITE STRUCTURE - TRASH DUMPSTER 10/12/2015 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 10/12/2015 1:39:35 PM PUBLIX PART COMPLETE
BLD - FENCE AND WALL 10/12/2015 APPROVED RMARTIN
BLD - SITE STRUCTURE-RETAINING WALL 10/12/2015 APPROVED CMINI
BLD - SITE LIGHTING-PLACEMENT/FOUNDATION 10/12/2015 APPROVED RMARTIN
BLD - UNDERGROUND SITE LIGHTING CONDUITS 10/12/2015 PARTIALLY APPROVED RMARTIN
Note: THIS IS A REINSPECTION Inspection Resulted at 10/12/2015 2:28:54 PM CONDUIT IN REAR FOR FEEDERS
BLD - SITE LIGHTING-POLE SET/FIXTURE 10/12/2015 APPROVED RMARTIN
Note: THIS IS A REINSPECTION
BLD - SITE LIGHTING-CONDUCTORS/CONNECTORS 10/12/2015 APPROVED RMARTIN
Note: THIS IS A REINSPECTION
BLD - SITE LIGHTING EXTERIOR MOUNTED 10/12/2015 APPROVED RMARTIN
STABILIZATION 10/12/2015 APPROVED CMINI
LDSC-PRE-PLANTING TREE QUALITY 10/09/2015 APPROVED - AS NOTED WBUTLER
Note: THIS IS A REINSPECTION 10/9/15 WMB This is a new inspection of replacement trees that were rejected on 10/8/15. The replacement trees required some pruning to make them a Florida Number One or better quality, but after pruning they passed and can be planted.
LDSC-PRE-PLANTING TREE QUALITY 10/08/2015 PARTIALLY APPROVED WBUTLER
Note: 10/8/15 WMB Four magnolia trees were rejected as they did not meet the Florida Number one quality criteria. Four others that did not meet it as well were able to be trimmed on site to bring them into conformance. Need to call in another tree quality inspection when the replacement magnolia trees come in.
U-WATER SERVICE INSTALLATION 10/06/2015 PARTIALLY APPROVED DSPENCER
Note: THIS IS A REINSPECTION
ASPHALT PRE-PLACEMENT 10/06/2015 APPROVED DROCKWELL
Note: THIS IS A REINSPECTION
ASPHALT PRE-PLACEMENT 10/06/2015 APPROVED DROCKWELL
FORM BOARD 10/02/2015 APPROVED - AS NOTED DROCKWELL
Note: Inspection Resulted at 10/5/2015 2:20:19 PM PLACCARD CLEAN-UP
DRAINAGE PIPE PLACEMENT 10/02/2015 APPROVED DROCKWELL
Note: THIS IS A REINSPECTION
CONCRETE FORM 10/01/2015 APPROVED - AS NOTED DROCKWELL
Note: Inspection Resulted at 10/5/2015 2:20:18 PM PLACCARD CLEAN-UP
LDSC-LOCATE BACKFLOW PREVENTOR OR PAD/ ELEC TRANS 10/01/2015 APPROVED WBUTLER
LDSC-SITE LIGHT STAKE LOCATE 10/01/2015 APPROVED WBUTLER
U-WATER MAIN DISINFECTION 09/25/2015 PARTIALLY APPROVED DSPENCER
Note: Inspection Resulted at 9/25/2015 11:49:00 AM LINE BEHIND OLD BEALS HAS BEEN CHLORINATED
BLD - SITE LIGHTING-CONDUCTORS/CONNECTORS 09/25/2015 PARTIALLY APPROVED RMARTIN
Note: THIS IS A REINSPECTION Inspection Resulted at 9/25/2015 2:26:22 PM LIGHTHOUSE SIGN BY MOBIL STATION, CONDUIT, TRENCH, CONDUCTORS
CURBING AND GUTTER 09/24/2015 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 9/24/2015 2:01:08 PM F-CURB TRENCH ACROSS FROM STARBUCKS
BLD - SITE LIGHTING-POLE SET/FIXTURE 09/24/2015 PARTIALLY APPROVED RMARTIN
Note: THIS IS A REINSPECTION Inspection Resulted at 9/24/2015 1:57:38 PM REAR OF PUBLIX
BLD - SITE LIGHTING-CONDUCTORS/CONNECTORS 09/24/2015 PARTIALLY APPROVED RMARTIN
Note: THIS IS A REINSPECTION Inspection Resulted at 9/24/2015 1:57:38 PM REAR OF PUBLIX
ROAD BASE/DENSITY 09/24/2015 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 10/12/2015 1:39:33 PM PUBLIX PART COMPLETE
U-WATER SERVICE INSTALLATION 09/24/2015 PARTIALLY APPROVED DSPENCER
Note: THIS IS A REINSPECTION
ASPHALT PRE-PLACEMENT 09/16/2015 CANCELLED BY APPLICANT CMINI
ASPHALT PRE-PLACEMENT 09/10/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 9/10/2015 12:52:05 PM IN PROGRESS
BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS 09/10/2015 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 9/10/2015 12:52:04 PM ON GOING INSPECTION
DRAINAGE STRUCTURE PLACEMENT 09/10/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 9/10/2015 12:21:59 PM PIPE AND STRUCTURE BEHIND BUILDING C
DRAINAGE PIPE PLACEMENT 09/10/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 9/10/2015 12:22:00 PM PIPE AND STRUCTURE BEHIND BUILDING C
BLD - SITE LIGHTING-CONDUCTORS/CONNECTORS 09/10/2015 PARTIALLY APPROVED RMARTIN
Note: Inspection Resulted at 9/10/2015 11:42:29 AM STILL NEED CHECK ONE POLE NOT READY, AND SIGN, COVERS
U-WATER SERVICE INSTALLATION 09/10/2015 PARTIALLY APPROVED JNICHOLS
Note: THIS IS A REINSPECTION Inspection Resulted at 9/11/2015 3:21:17 PM WORK NOT COMPLETED
ASPHALT PRE-PLACEMENT 08/28/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 8/28/2015 11:35:56 AM IN PROGRESS OF PLACEMENT
DRAINAGE PIPE PLACEMENT 08/27/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 8/27/2015 11:28:00 AM STRUCTURES 4 AND 5
DRAINAGE STRUCTURE PLACEMENT 08/27/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 8/27/2015 11:27:59 AM PIPE PLACEMENT FROM STRUCTURE 4 AND 5
U-WATER SERVICE INSTALLATION 08/27/2015 PARTIALLY APPROVED DSPENCER
Note: THIS IS A REINSPECTION
U-GRAVITY SEWER INSTALL/TESTING 08/18/2015 PARTIALLY APPROVED DSPENCER
Note: THIS IS A REINSPECTION Inspection Resulted at 8/19/2015 7:24:18 AM GRAVITY SEWER LINE WORK CONTINUES
U-GRAVITY SEWER INSTALL/TESTING 08/12/2015 PARTIALLY APPROVED DSPENCER
Note: Inspection Resulted at 8/13/2015 7:05:37 AM WORK CONTINUES 2ND RUN
CURBING AND GUTTER 07/31/2015 PARTIALLY APPROVED CMINI
CURBING AND GUTTER 07/23/2015 APPROVED CMINI
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 07/23/2015 PARTIALLY APPROVED DSPENCER
Note: THIS IS A REINSPECTION
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 07/22/2015 PARTIALLY APPROVED DSPENCER
Note: THIS IS A REINSPECTION Inspection Resulted at 7/22/2015 3:44:28 PM INSTALLED 4IN FIRE LINE WEST OF PUBLX
BLD - SITE LIGHTING-POLE SET/FIXTURE 07/22/2015 PARTIALLY APPROVED RMARTIN
Note: Inspection Resulted at 7/22/2015 1:48:26 PM POLE SET, MARKED ON PLAN
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 07/20/2015 PARTIALLY APPROVED DSPENCER
Note: THIS IS A REINSPECTION Inspection Resulted at 7/21/2015 7:54:52 AM INSERT-A VALVE INSTALLED
U-WATER SERVICE INSTALLATION 07/16/2015 PARTIALLY APPROVED DSPENCER
Note: Inspection Resulted at 7/16/2015 11:10:44 AM UPS CONNECTED
BLD - UNDERGROUND SITE LIGHTING CONDUITS 07/16/2015 PARTIALLY APPROVED RMARTIN
Note: Inspection Resulted at 7/16/2015 11:03:30 AM MARKED ON PLAN
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 07/14/2015 PARTIALLY APPROVED DSPENCER
Note: THIS IS A REINSPECTION Inspection Resulted at 7/14/2015 3:48:57 PM PRESSURE TESTED 6IN FIRE LINE TO DEVICE THAT WAS REPLACED FROM 4IN
U-GRAVITY SEWER INSTALL/TESTING 07/09/2015 APPROVED DSPENCER
Note: THIS IS A REINSPECTION Inspection Resulted at 7/9/2015 2:58:54 PM OUTSIDE DROP CONCREET ENCASEMET PLACED
U-WATER METER INSTALLATION/VERIFICATION 07/09/2015 PARTIALLY APPROVED DSPENCER
Note: Inspection Resulted at 7/9/2015 2:58:54 PM 2`` REUSE METER AND PIT SET
U-GRAVITY SEWER INSTALL/TESTING 07/08/2015 PARTIALLY APPROVED DSPENCER
Note: Inspection Resulted at 7/8/2015 3:21:45 PM MANHOLE OUTSIDE DROP ENCASED WITH CONCRETE
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 07/08/2015 PARTIALLY APPROVED DSPENCER
Note: Inspection Resulted at 7/8/2015 3:21:45 PM DEVICE ASSEMBLED AND PLACED

Review History

Department Status Date In Date Out
BLD COMPLETE 10/30/2014 11/03/2014
DSD COMPLETE 10/30/2014 11/04/2014
ENGIN1 COMPLETE 10/30/2014 10/31/2014
SW1 COMPLETE 10/30/2014 10/31/2014
UD1 COMPLETE 10/30/2014 10/30/2014
ZON COMPLETE 10/30/2014 11/04/2014

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 08/11/2016
REINSPECTION FEE ¤40.00 08/11/2016
REINSPECTION FEE ¤40.00 05/09/2016
REINSPECTION FEE ¤40.00 05/09/2016
INSPECTION 40 ¤1,880.00 11/05/2014
PERMIT FEE ¤125.00 11/05/2014
SITE PLAN 20 ¤20.00 11/05/2014
Fees Total Due: ¤0.00 Total Paid: ¤2,185.00