Permit #2014110066
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7026-RP016-0010 |
| Block: RP016 |
| Subdivision: - |
| Job Phone: (386)322-8700 |
| Location Address: 89 PINE GROVE DR |
| Type: SDD - SUBDIVISION SITE DEVELOPMENT |
| Issue Date: 11/07/2014 |
| NOC: Unknown |
| Applicant name: MARC ALLEN HAZEN |
| Owner: SEAGATE COMMUNITIES INC |
|
Address 185 CYPRESS POINT PKWY PALM COAST, FL 32164 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤1,700,000.00 |
| Job Description: "PARK PLACE" PHASE I SUBDIVISION |
| Type: CN |
Contractor
HAZEN CONSTRUCTION LLC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2417 TOMOKA FARMS ROAD PORT ORANGE, FL 32128 |
CUC1223713 (Exp: 08/31/2026) | (386)322-8700 | (386)756-0000 |
Inspection History
| Type | Request Date | Result | Inspector |
| LDSC- LANDSCAPE FINAL | 03/08/2016 | APPROVED | WBUTLER |
| Note: THIS IS A REINSPECTION | |||
| TRAFFIC SIGNAGE/PAVEMENT MARKING FINAL | 03/03/2016 | APPROVED | GLALIMA |
| Note: THIS IS A REINSPECTION | |||
| FINAL INSPECTION | 03/03/2016 | APPROVED - AS NOTED | DSCHRAGER |
| Note: Site work and Utility construction work complete. | |||
| FINAL GRADE | 03/02/2016 | APPROVED | GLALIMA |
| Note: THIS IS A REINSPECTION | |||
| FINAL DRAINAGE | 03/02/2016 | APPROVED | GLALIMA |
| Note: THIS IS A REINSPECTION | |||
| ENG SUBSTANTIAL COMPLETION (OFFICE USE) | 03/02/2016 | FINAL APPROVED | DSCHRAGER |
| COMPACTION | 03/02/2016 | APPROVED | GLALIMA |
| Note: THIS IS A REINSPECTION | |||
| ASPHALT STRIPING | 03/02/2016 | APPROVED | GLALIMA |
| WALK-THRU / PUNCH OUT | 03/02/2016 | APPROVED - AS NOTED | GLALIMA |
| Note: THIS IS A REINSPECTION AT LEFT SIDE OF MAIN GATE A 2' X 18 ' FEET OF ROAD EDGE HAS FAILED IS WILL NEED TO BE CUT OUT AND REPLACED WITH ''HOT'' ROLLED ASPHALT IN THE FUTURE. ANY ISSUES CALL GARY LA LIMA 386-585-0287 . WILL SPEEK WITH BUILDER / CONTRACTOR | |||
| RETENTION /DETENTION STABILIZATION | 03/02/2016 | APPROVED - AS NOTED | GLALIMA |
| Note: THIS IS A REINSPECTION WHEN BUILDING ''LAKE SIDE YOU '' WILL '' HAVE TO INSTALL SILTFENCE '' THAT WELL BE A EROSION CONTROLL INSPECTION | |||
| COMPACTION | 02/26/2016 | Disapproved - NO FEE | GLALIMA |
| Note: WAITING ON OUT COME OF '' COMPACTION TEST '' | |||
| SILT FENCE | 02/25/2016 | APPROVED | GLALIMA |
| CONSTRUCTION ENTRANCE | 02/25/2016 | APPROVED | DROCKWELL |
| STABILIZATION | 02/25/2016 | APPROVED | GLALIMA |
| FINAL GRADE PRIOR TO SOD | 02/25/2016 | APPROVED | GLALIMA |
| DRAINAGE PIPE PLACEMENT | 02/25/2016 | APPROVED | GLALIMA |
| LDSC- LANDSCAPE / IRRIGATION AS-BUILT | 02/01/2016 | APPROVED | WBUTLER |
| Note: THIS IS A REINSPECTION | |||
| LDSC- LANDSCAPE FINAL | 02/01/2016 | Disapproved -FEE REQUIRED | WBUTLER |
| Note: THIS IS A REINSPECTION 2/1/16 1) The as-built landscape plan shows two viburnum on the right side of the FPL transformer to act as the requested required screening. Only one exists in this location. Need to add one more 7-gallon 30" tall viburnum and mulch it. 2) Remove debris from the inlet in the sodded area on the right hand side of the main entrance to the subdivision. Also remove the erosion control filter cloth. 3) Several areas in this current phase of the subdivision had areas disturbed after it was originally seeded (the future recreation area and the front and rear of some of the lots. Need to seed and mulch (regrade as needed due to erosion on the rear of lots 52-48) all bare soil areas. 4) Still need a card in the irrigation controller that states what zone covers what area of the site and state whether it is a spray or rotor zone and turf or bed area. 5) Solar Sync module still not installed on controller to make it a "smart" controller. 6) Describe who will be watering the bottle brush trees that were planted in the buffer where there is no irrigation. Does the landscape contractor have something in his contract to water them until established? If they die, they will be required to be replaced. Need to correct the above items and call in for a reinspection when complete | |||
| TRAFFIC SIGNAGE/PAVEMENT MARKING FINAL | 01/29/2016 | Disapproved - NO FEE | GLALIMA |
| Note: NO ONE ON SITE , NO INFO AND NEEDS TO MEET ALL TRAFFIC REQUIREMENTS . NORTH PART OF ROAD NOT PAVED RE-INSPECTION NEEDED | |||
| LDSC- LANDSCAPE FINAL | 01/29/2016 | Disapproved - NO FEE | WBUTLER |
| Note: Cannot schedule landscape final until the landscape and irrigation as-builts have been received and approved. | |||
| LDSC- LANDSCAPE / IRRIGATION AS-BUILT | 01/29/2016 | Disapproved - NO FEE | WBUTLER |
| Note: Revised landscape and irrigation as-builts were not submitted so cannot conduct inspection. | |||
| FINAL INSPECTION | 01/29/2016 | Disapproved - NO FEE | GLALIMA |
| FINAL DRAINAGE | 01/29/2016 | Disapproved -FEE REQUIRED | GLALIMA |
| Note: STREET GUTTER FULL OF SAND AND SOME OF IT IS IN THE ROAD '' NO INFO ON SITE | |||
| U - UTILITY COMMERCIAL FINAL | 01/29/2016 | APPROVED | DSPENCER |
| RETENTION /DETENTION STABILIZATION | 01/29/2016 | PARTIALLY APPROVED | GLALIMA |
| Note: WILL NEED TO SEE PLOT PLAN AND DRAINAGE DETAIL. | |||
| FINAL GRADE | 01/29/2016 | Disapproved -FEE REQUIRED | GLALIMA |
| Note: REMOVE ALL EXCESS FILL FROM VACCANT LOTS . YOU CAN MOVE IT TO PHASE 2 . ALL EROSION MUST BE UNDER CONTROL FOR THIS INSPECTION . YOU WILL NEED TO SOD FROM EDGE OF ROAD BACK 3' FEET MINIMUM YOU ALSO NEED TO HAVE ALL DETAILS / PLOT PLAN / SURVEY AND ANY OTHER INFO ON SITE AT THE TIME OF INSPECTION IF NEEDED CALL GARY LA LIMA - 386 - 585 - 0287 | |||
| WALK-THRU / PUNCH OUT | 01/29/2016 | Disapproved - NO FEE | GLALIMA |
| Note: NO INFO | |||
| BLD - UNDERGROUND SITE LIGHTING CONDUITS | 01/28/2016 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 1/28/2016 3:25:30 PM SITE LIGHTING INSTALLED AND INSPECTED BY FPL | |||
| BLD - SITE LIGHTING-PLACEMENT/FOUNDATION | 01/28/2016 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 1/28/2016 3:25:29 PM SITE LIGHTING INSTALLED AND INSPECTED BY FPL | |||
| BLD - SITE LIGHTING-POLE SET/FIXTURE | 01/28/2016 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 1/28/2016 3:25:30 PM SITE LIGHTING INSTALLED AND INSPECTED BY FPL | |||
| BLD - SITE LIGHTING EXTERIOR MOUNTED | 01/28/2016 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 1/28/2016 3:25:31 PM SITE LIGHTING INSTALLED AND INSPECTED BY FPL | |||
| FINAL SURVEY (COMM - OFFICE USE ONLY) | 01/27/2016 | APPROVED | RLEE |
| SILT FENCE | 07/28/2015 | Disapproved -FEE REQUIRED | CMINI |
| Note: SILT FENCE IS AN ON GOING INSPECTION REQUIRED TO BE CHECKED AND MAINTAINED UNTILL THE PERMIT IS FINALED, THE SILT FENCE IS IN NEED OF CORRECTION IN MANY AREAS. NEED TO CORRECT AS SOON AS POSSIBLE AND CALLED BACK IN FOR REINSPECTION WHEN CORRECTED. DUE TO THE RAINS NEED TO CORRECT WITHIN 3 DAYS. | |||
| STABILIZATION | 06/16/2015 | PARTIALLY APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 6/16/2015 11:01:57 AM STABILIZATION OF BACK END OF PROPERTY. LIME ROCK INSTALLED FRONT END OF PROPERTY OFF OF PINE GROVE. | |||
| STABILIZATION | 06/03/2015 | PARTIALLY APPROVED | JCOLASANTI |
| Note: Inspection Resulted at 6/3/2015 11:13:14 AM LIME ROCK INSTALATION AT FRONT ENTRANCE. | |||
| FINAL GRADE PRIOR TO SOD | 06/03/2015 | PARTIALLY APPROVED | JCOLASANTI |
| Note: Inspection Resulted at 6/3/2015 11:13:15 AM GRADE AROUND POND INSPECTED. OK TO SOD. | |||
| DRAINAGE PIPE PLACEMENT | 05/28/2015 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 5/28/2015 11:38:12 AM AREA BY ENTRANCE MARKED ON PLAN | |||
| DRAINAGE PIPE PLACEMENT | 05/22/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 5/22/2015 11:49:16 AM PIPE PLACEMENT AND STRUCTURES HIGHLIGHTED ON PLAN | |||
| COMPACTION | 05/21/2015 | PARTIALLY APPROVED | JCOLASANTI |
| Note: Inspection Resulted at 5/21/2015 3:21:27 PM COMPACTION TEST ON SUB BASE AT ENTRANCE. | |||
| DRAINAGE PIPE PLACEMENT | 05/19/2015 | PARTIALLY APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| U-SEWER FORCE MAIN INSTALL/TESTING | 05/08/2015 | PARTIALLY APPROVED | DSPENCER |
| Note: THIS IS A REINSPECTION installation fo fm from wet well into existing fm tap completed | |||
| U-GRAVITY SEWER INSTALL/TESTING | 05/08/2015 | PARTIALLY APPROVED | DSPENCER |
| Note: most of the sewer gravity system is installed service laterals are 85% layed down to property lines | |||
| U-PUMP STATION PRE-INSTALLATION | 05/08/2015 | PARTIALLY APPROVED | DSPENCER |
| Note: wet well has been plumbed into Valve pit and piping installations continues also subcontractor for manhole liners were being welded had issues and had to shut down both crews for not having proper confined space and fall arrest equiptment .until the equiptment was on site and being used. | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 05/08/2015 | PARTIALLY APPROVED | DSPENCER |
| Note: both taps were made contractor has layed 90 % and continues laying water main 1" services are being brought bto the property lines are at 75% completed | |||
| DRAINAGE PIPE PLACEMENT | 04/22/2015 | PARTIALLY APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 4/22/2015 12:07:30 PM MARKED AREAS INSPECTED ON PLAN | |||
| BLD - FLATWORK-SIDEWALK/PADS/PATIOS/LANAI/LANDINGS | 04/07/2015 | PARTIALLY APPROVED | JCOLASANTI |
| Note: Inspection Resulted at 4/7/2015 12:42:43 PM LOOKED AT MES AT STA. 21.4. MARKED ON PLANS. CALL IN STRUCTURE INSPECTION FOR FUTURE INSPECTIONS. | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 04/02/2015 | PARTIALLY APPROVED | DSPENCER |
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 03/31/2015 | PARTIALLY APPROVED | DSPENCER |
| Note: Inspection Resulted at 4/2/2015 9:00:16 AM THE TWO WET TAPS INTO THE EXISTING SYSTEM HAVE BEEN COMPLETED AND THE MAINS ARE BEING INSTALLED INTO THE SITE 600FT INSTALLED SO FAR. | |||
| DRAINAGE PIPE PLACEMENT | 03/31/2015 | PARTIALLY APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 3/31/2015 2:10:56 PM AREA INSPECTED MARKED ON PLANS | |||
| DRAINAGE STRUCTURE PLACEMENT | 03/31/2015 | PARTIALLY APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| DRAINAGE PIPE PLACEMENT | 03/27/2015 | PARTIALLY APPROVED | JCOLASANTI |
| Note: Inspection Resulted at 3/27/2015 10:10:21 AM MARKED AREA INSPECTED ON PLANS | |||
| DRAINAGE STRUCTURE PLACEMENT | 03/27/2015 | PARTIALLY APPROVED | JCOLASANTI |
| Note: Inspection Resulted at 3/27/2015 10:10:21 AM MARKED AREA INSPECTED ON PLANS | |||
| U-SEWER FORCE MAIN INSTALL/TESTING | 02/26/2015 | PARTIALLY APPROVED | DSPENCER |
| Note: Inspection Resulted at 2/26/2015 2:04:15 PM PUMP STATION WET WELL BASE AND 1 SECTION SET. DEWATERING AND TRENCH BOX MADE DIG DRY WITH EXCELLANT CONDITIONS .BACKFILL VERY CLEAN. CONTRACTOR FOR HAZEN SUPERVISOR CHAS WILL BE CONTINUING THE GRAVITY INSTLLATIONS. THE MATERIAL ON SITE MEETS OUR STANDARDS | |||
| CONSTRUCTION ENTRANCE | 12/04/2014 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: NEED TO INSTALL CONSTRUCTION ENTRANCE PER PLAN, SIZE OF ROCK, LENGTH OF ENTRANCE CORRECT UNDERLAYMENT AND DEPTH OF ROCK. CHECK WITH ENGINEER TO CONSIDER DRAINAGE PIPE. ALSO NEED DETAIL FOR PROPER INSTALLATION AND PROTECTION OF FUEL TANK. | |||
| SILT FENCE | 11/21/2014 | APPROVED - AS NOTED | JCOLASANTI |
| Note: Inspection Resulted at 11/24/2014 7:32:23 AM PLEASE DO NOT CUT TREE ROOTS OUTSIDE OF BUILDING AREA. NEED TO CALL IN CONSTRUCTION ENTRANCE. | |||
| PRE-CONSTRUCTION -CALL 986-3736 | 11/14/2014 | APPROVED | JCOLASANTI |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 11/04/2014 | 11/07/2014 |
| DSD | COMPLETE | 11/04/2014 | 11/06/2014 |
| ENGIN1 | COMPLETE | 11/04/2014 | 11/05/2014 |
| PLLA | COMPLETE | 11/04/2014 | 11/06/2014 |
| UD1 | COMPLETE | 11/04/2014 | 11/06/2014 |
| ZON | COMPLETE | 11/04/2014 | 11/06/2014 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 03/08/2016 |
| REINSPECTION FEE | ¤40.00 | 03/08/2016 |
| REINSPECTION FEE | ¤40.00 | 03/08/2016 |
| REINSPECTION FEE | ¤40.00 | 03/08/2016 |
| REINSPECTION FEE | ¤40.00 | 03/08/2016 |
| SITE PLAN 20 | ¤20.00 | 11/07/2014 |
| INSPECTION 40 | ¤1,640.00 | 11/07/2014 |
| PERMIT FEE | ¤125.00 | 11/07/2014 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤1,985.00 |