I want to search for...
Permit #2014110105
Permit Details
Status: COED
| Parcel Id: 41-11-31-4975-00000-0010 |
| Total Square Footage: 0 sqft |
| Block: 00000 |
| Subdivision: 2272 - ISLAND WALK AT PALM COAST |
| Job Phone: 727-938-9719 |
| Location Address: 250 PALM COAST PKWY NE |
| Type: CSD - COMMERCIAL SITE DEVELOPMENT |
| Issue Date: 01/15/2015 |
| NOC: RECORDED |
| Applicant name: MICHAEL S BEAUSIR |
| Owner: BRANCH ISLAND WALK ASSOCIATES LP |
|
Address SUITE 600 ATLANTA, GA 30326 |
|
Address 3340 PEACHTREE ROAD NE ATLANTA, GA 30326 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤48,000.00 |
| Job Description: ISLAND WALK - FLORIDA PARK DRIVE TURN LANE |
| Type: CN |
Contractor
HAWKINS CONSTRUCTION INC
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1430 L AND R INDUSTRIAL BLVD TARPON SPRINGS, FL 34689 |
CGC061198 (Exp: 08/31/2018) | 727-938-9719 | 727-938-3208 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL INSPECTION | 03/04/2016 | FINAL APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| FINAL INSPECTION | 03/02/2016 | Disapproved - NO FEE | DROCKWELL |
| Note: THIS IS A REINSPECTION Inspection Resulted at 3/2/2016 2:46:40 PM TURN LANE FROM FLA.PARK HAS NOT BEEN TOUCHED. | |||
| ASPHALT STRIPING | 03/02/2016 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| FINAL SURVEY (COMM - OFFICE USE ONLY) | 02/29/2016 | APPROVED | DRAMIREZ |
| Note: THIS IS A REINSPECTION As-builts approved under application #2946 | |||
| FINAL SURVEY (COMM - OFFICE USE ONLY) | 01/06/2016 | Disapproved - NO FEE | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 1/6/2016 12:01:46 PM FINAL SURVEY NEEDS TO BE SUBMITTED AND APPROVED BY OFFICE ONLY. | |||
| FINAL INSPECTION | 01/06/2016 | Disapproved - NO FEE | CMINI |
| Note: Inspection Resulted at 1/6/2016 12:01:47 PM FINAL SURVEY NEEDS TO BE SUBMITTED AND APPROVED BY OFFICE ONLY.BEFORE FINAL CAN BE INSPECTED | |||
| LDSC- LANDSCAPE FINAL | 01/06/2016 | APPROVED - AS NOTED | WBUTLER |
| Note: 1/6/16 WMB 1) No landscape as-built required for this project. | |||
| LDSC- SUBSTANTIAL COMPLETE (OFFICE USE) | 10/29/2015 | APPROVED - AS NOTED | WBUTLER |
| Note: THIS IS A REINSPECTION Permit Number 2014110105 10/29/15 1) Sod still needs to be patched in the swale area. 2) Need to clean out the adjacent existing shrubbery bed and re-mulch with 2-3" of large chunk bark. | |||
| FINAL DRAINAGE | 10/29/2015 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 10/29/2015 11:20:57 AM COMPLETE | |||
| FINAL SURVEY (COMM - OFFICE USE ONLY) | 10/27/2015 | CANCELLED BY APPLICANT | RLEE |
| ASPHALT STRIPING | 10/22/2015 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 10/22/2015 2:03:09 PM APPROVED PER SEAN CASTILLO | |||
| TRAFFIC SIGNAGE/PAVEMENT MARKING FINAL | 10/22/2015 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 10/22/2015 2:03:09 PM APPROVED PER SEAN CASTILLO | |||
| BLD - SITE STRUCTURE-RETAINING WALL | 10/20/2015 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| BLD - SITE STRUCTURE-RETAINING WALL | 10/15/2015 | CANCELLED BY APPLICANT | JHINDMAN |
| ASPHALT SUBGRADE FINISH | 10/12/2015 | APPROVED - AS NOTED | CMINI |
| LDSC- SUBSTANTIAL COMPLETE (OFFICE USE) | 10/05/2015 | Disapproved - NO FEE | WBUTLER |
| Note: 10/5/15 Bill Butler 1) On both the north and south sides of the Sunshine Plaza entrance, the mitered end sections were cut into the existing grade of the landscape buffer and now on the north side of the entry, there is about a 12-15" vertical cut in the grade with nothing to hold it back. Same is true for the south side, but it is only about 10" of vertical grade change. Need to provide a drawing detail as to how this problem can be resolved. 2) A few areas in the swale have gaps in the Bahia sod that need to have sod filled into them. | |||
| U-WATER MAIN DISINFECTION | 10/02/2015 | APPROVED | DSPENCER |
| U-WATER MAIN DISINFECTION SAMPLING | 10/02/2015 | APPROVED | DSPENCER |
| U-PUMP STATION PRE-INSTALLATION | 10/02/2015 | APPROVED | DSPENCER |
| U-PUMP STATION START-UP | 10/02/2015 | APPROVED | DSPENCER |
| U-GREASE INTERCEPTOR PRE-INSTALLATION | 10/02/2015 | APPROVED | DSPENCER |
| U-GREASE INTERCEPTOR INSTALLED/PLUMBED | 10/02/2015 | APPROVED | DSPENCER |
| U-GREASE INTERCEPTOR FLOW/DYE TESTED | 10/02/2015 | APPROVED | DSPENCER |
| U-WATER METER INSTALLATION/VERIFICATION | 10/02/2015 | APPROVED | DSPENCER |
| UC-SUBSTANTIAL WALK-THRU | 10/02/2015 | APPROVED | DSPENCER |
| U - UTILITY COMMERCIAL FINAL | 10/02/2015 | APPROVED | DSPENCER |
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 10/01/2015 | APPROVED | DSPENCER |
| U-SEWER FORCE MAIN INSTALL/TESTING | 10/01/2015 | APPROVED | DSPENCER |
| U-GRAVITY SEWER INSTALL/TESTING | 10/01/2015 | APPROVED | DSPENCER |
| U-REUSE MAIN INSTALL/TESTING | 10/01/2015 | APPROVED | DSPENCER |
| PIPE-VALLEY/GUTTER INSTALL | 10/01/2015 | APPROVED | DROCKWELL |
| FINAL GRADE PRIOR TO SOD | 10/01/2015 | APPROVED - AS NOTED | GLALIMA |
| Note: WHEN FINAL INSPECTION IS PERFORMED FOR ALL DRAINAGE WE WILL CHECK THIS AGAIN, THE GRADE IN FRONT OF POWER BOX # 1 UNDER FLORIDA LIGHT & POWER . WILL RECHECK DRAINAGE FLOW WHEN RAINING | |||
| FINAL GRADE | 09/30/2015 | APPROVED - AS NOTED | GLALIMA |
| Note: ANY AND ALL ISSUE WILL BE HANDLE AT FINAL WALK . | |||
| DRAINAGE PIPE PLACEMENT | 09/25/2015 | APPROVED - AS NOTED | GLALIMA |
| Note: THIS IS A REINSPECTION ON SITE WITH DON S PASSED | |||
| END SECTION | 09/25/2015 | APPROVED | GLALIMA |
| Note: THIS IS A REINSPECTION ON SITE WITH DON S PASSED | |||
| END SECTION | 09/21/2015 | Disapproved - NO FEE | GLALIMA |
| Note: WILL HAVE SITE MEET 9 / 24 / 2015 | |||
| DRAINAGE PIPE PLACEMENT | 09/21/2015 | Disapproved - NO FEE | GLALIMA |
| Note: THIS IS A REINSPECTION WILL HAVE SITE MEET 9 / 24 / 2015 | |||
| COMPACTION | 09/11/2015 | APPROVED - AS NOTED | GLALIMA |
| Note: THIS IS A REINSPECTION TESTS REPORTS ENGINEERING IN SYSTEM . | |||
| ROAD BASE/DENSITY | 09/11/2015 | APPROVED - AS NOTED | GLALIMA |
| Note: THIS IS A REINSPECTION REPORT OF DENSITY TEST IN SYSTEM GARY LA LIMA | |||
| DRAINAGE PIPE PLACEMENT | 09/10/2015 | CANCELLED BY APPLICANT | CMINI |
| BLD - SITE STRUCTURE - TRASH DUMPSTER | 09/09/2015 | APPROVED - AS NOTED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 9/9/2015 10:32:01 AM COMPLETE | |||
| BLD - SITE STRUCTURE-SHED/GAZEBO/FOOT BRIDGE | 09/09/2015 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| BLD - SITE STRUCTURE - TRASH DUMPSTER | 09/08/2015 | Disapproved - NO FEE | DROCKWELL |
| Note: Inspection Resulted at 9/8/2015 3:05:15 PM COULD NOT LOCATE SUPER FOR LOCATIONS | |||
| BLD- UNDERGROUND ELEC/GAS | 09/08/2015 | APPROVED | RMARTIN |
| Note: Inspection Resulted at 9/8/2015 12:31:09 PM NO UNDERGROUND WAS DONE ON THAT SIDE/CLEANING UP PERMIT | |||
| BLD - UNDERGROUND SITE LIGHTING CONDUITS | 09/08/2015 | APPROVED | RMARTIN |
| Note: Inspection Resulted at 9/8/2015 12:31:09 PM NO UNDERGROUND WAS DONE ON THAT SIDE WAS JUST ON PERMIT, CLEANING UP PERMIT | |||
| BLD - SITE STRUCTURE-SHED/GAZEBO/FOOT BRIDGE | 09/08/2015 | Disapproved - NO FEE | DROCKWELL |
| Note: Inspection Resulted at 9/8/2015 3:05:14 PM COULD NOT LOCATE SUPER FOR LOCATIONS | |||
| ASPHALT STRIPING | 07/17/2015 | CANCELLED BY APPLICANT | CMINI |
| ASPHALT PRE-PLACEMENT | 07/10/2015 | PARTIALLY APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| ASPHALT PRE-PLACEMENT | 07/07/2015 | PARTIALLY APPROVED | JHINDMAN |
| PRE-CONSTRUCTION -CALL 986-3736 | 07/01/2015 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| PRE-CONSTRUCTION -CALL 986-3736 | 01/23/2015 | CANCELLED BY APPLICANT | CMINI |
| Note: Inspection Resulted at 1/23/2015 2:42:07 PM WILL BE RESCHEDULED AT A LATER DATE WHEN THE APPROVED REVISED SET IS READY | |||
| ROAD BASE/DENSITY | 01/23/2015 | CANCELLED BY APPLICANT | CMINI |
| Note: Inspection Resulted at 1/23/2015 2:42:08 PM WILL BE RESCHEDULED AT A LATER DATE WHEN THE APPROVED REVISED SET IS READY | |||
| COMPACTION | 01/23/2015 | CANCELLED BY APPLICANT | CMINI |
| Note: Inspection Resulted at 1/23/2015 2:42:07 PM WILL BE RESCHEDULED AT A LATER DATE WHEN THE APPROVED REVISED SET IS READY |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 04/21/2015 | 04/22/2015 |
| DSD | COMPLETE | 04/21/2015 | 04/23/2015 |
| ENGIN1 | COMPLETE | 04/21/2015 | 04/23/2015 |
| Note: Please provide all roadway testing results to City Traffic Engineer. | |||
| SW1 | COMPLETE | 04/21/2015 | 04/23/2015 |
| UD1 | COMPLETE | 04/21/2015 | 04/23/2015 |
| ZON | COMPLETE | 04/21/2015 | 04/22/2015 |
| Note: See DSD-Planning for comments, if any. | |||
| ENGIN1 | COMPLETE | 03/31/2015 | 03/31/2015 |
| DSD | COMPLETE | 01/13/2015 | 01/13/2015 |
| ENGIN1 | COMPLETE | 01/13/2015 | 01/13/2015 |
| Note: Received Drainage Calculation Document on Tuesday January 13, 2014 from the Engineer of Record, B.S.E. Consultants, Inc. | |||
| PLLA | COMPLETE | 01/13/2015 | 01/13/2015 |
| UD1 | COMPLETE | 01/13/2015 | 01/13/2015 |
| ZON | COMPLETE | 01/13/2015 | 01/13/2015 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| INSPECTION 40 | ¤2,880.00 | 01/15/2015 |
| PERMIT FEE | ¤125.00 | 01/15/2015 |
| SITE PLAN 20 | ¤20.00 | 01/15/2015 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤3,025.00 |