I want to search for...

Permit #2014110105

Permit Details

Status: COED

Parcel Id: 41-11-31-4975-00000-0010
Total Square Footage: 0 sqft
Block: 00000
Subdivision: 2272 - ISLAND WALK AT PALM COAST
Job Phone: 727-938-9719
Location Address: 250 PALM COAST PKWY NE
Type: CSD - COMMERCIAL SITE DEVELOPMENT
Issue Date: 01/15/2015
NOC: RECORDED
Applicant name: MICHAEL S BEAUSIR
Owner: BRANCH ISLAND WALK ASSOCIATES LP

Address

SUITE 600

ATLANTA, GA 30326

Address

3340 PEACHTREE ROAD NE

ATLANTA, GA 30326

Lot: 0010
Contracted Stated Job Value: ¤48,000.00
Job Description: ISLAND WALK - FLORIDA PARK DRIVE TURN LANE
Type: CN

Contractor

HAWKINS CONSTRUCTION INC
Status Location Address State License Number Phone Fax
CANCEL

1430 L AND R INDUSTRIAL BLVD

TARPON SPRINGS, FL 34689

CGC061198 (Exp: 08/31/2018) 727-938-9719 727-938-3208

Inspection History

Type Request Date Result Inspector
FINAL INSPECTION 03/04/2016 FINAL APPROVED DROCKWELL
Note: THIS IS A REINSPECTION
FINAL INSPECTION 03/02/2016 Disapproved - NO FEE DROCKWELL
Note: THIS IS A REINSPECTION Inspection Resulted at 3/2/2016 2:46:40 PM TURN LANE FROM FLA.PARK HAS NOT BEEN TOUCHED.
ASPHALT STRIPING 03/02/2016 APPROVED DROCKWELL
Note: THIS IS A REINSPECTION
FINAL SURVEY (COMM - OFFICE USE ONLY) 02/29/2016 APPROVED DRAMIREZ
Note: THIS IS A REINSPECTION As-builts approved under application #2946
FINAL SURVEY (COMM - OFFICE USE ONLY) 01/06/2016 Disapproved - NO FEE CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 1/6/2016 12:01:46 PM FINAL SURVEY NEEDS TO BE SUBMITTED AND APPROVED BY OFFICE ONLY.
FINAL INSPECTION 01/06/2016 Disapproved - NO FEE CMINI
Note: Inspection Resulted at 1/6/2016 12:01:47 PM FINAL SURVEY NEEDS TO BE SUBMITTED AND APPROVED BY OFFICE ONLY.BEFORE FINAL CAN BE INSPECTED
LDSC- LANDSCAPE FINAL 01/06/2016 APPROVED - AS NOTED WBUTLER
Note: 1/6/16 WMB 1) No landscape as-built required for this project.
LDSC- SUBSTANTIAL COMPLETE (OFFICE USE) 10/29/2015 APPROVED - AS NOTED WBUTLER
Note: THIS IS A REINSPECTION Permit Number 2014110105 10/29/15 1) Sod still needs to be patched in the swale area. 2) Need to clean out the adjacent existing shrubbery bed and re-mulch with 2-3" of large chunk bark.
FINAL DRAINAGE 10/29/2015 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 10/29/2015 11:20:57 AM COMPLETE
FINAL SURVEY (COMM - OFFICE USE ONLY) 10/27/2015 CANCELLED BY APPLICANT RLEE
ASPHALT STRIPING 10/22/2015 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 10/22/2015 2:03:09 PM APPROVED PER SEAN CASTILLO
TRAFFIC SIGNAGE/PAVEMENT MARKING FINAL 10/22/2015 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 10/22/2015 2:03:09 PM APPROVED PER SEAN CASTILLO
BLD - SITE STRUCTURE-RETAINING WALL 10/20/2015 APPROVED CMINI
Note: THIS IS A REINSPECTION
BLD - SITE STRUCTURE-RETAINING WALL 10/15/2015 CANCELLED BY APPLICANT JHINDMAN
ASPHALT SUBGRADE FINISH 10/12/2015 APPROVED - AS NOTED CMINI
LDSC- SUBSTANTIAL COMPLETE (OFFICE USE) 10/05/2015 Disapproved - NO FEE WBUTLER
Note: 10/5/15 Bill Butler 1) On both the north and south sides of the Sunshine Plaza entrance, the mitered end sections were cut into the existing grade of the landscape buffer and now on the north side of the entry, there is about a 12-15" vertical cut in the grade with nothing to hold it back. Same is true for the south side, but it is only about 10" of vertical grade change. Need to provide a drawing detail as to how this problem can be resolved. 2) A few areas in the swale have gaps in the Bahia sod that need to have sod filled into them.
U-WATER MAIN DISINFECTION 10/02/2015 APPROVED DSPENCER
U-WATER MAIN DISINFECTION SAMPLING 10/02/2015 APPROVED DSPENCER
U-PUMP STATION PRE-INSTALLATION 10/02/2015 APPROVED DSPENCER
U-PUMP STATION START-UP 10/02/2015 APPROVED DSPENCER
U-GREASE INTERCEPTOR PRE-INSTALLATION 10/02/2015 APPROVED DSPENCER
U-GREASE INTERCEPTOR INSTALLED/PLUMBED 10/02/2015 APPROVED DSPENCER
U-GREASE INTERCEPTOR FLOW/DYE TESTED 10/02/2015 APPROVED DSPENCER
U-WATER METER INSTALLATION/VERIFICATION 10/02/2015 APPROVED DSPENCER
UC-SUBSTANTIAL WALK-THRU 10/02/2015 APPROVED DSPENCER
U - UTILITY COMMERCIAL FINAL 10/02/2015 APPROVED DSPENCER
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 10/01/2015 APPROVED DSPENCER
U-SEWER FORCE MAIN INSTALL/TESTING 10/01/2015 APPROVED DSPENCER
U-GRAVITY SEWER INSTALL/TESTING 10/01/2015 APPROVED DSPENCER
U-REUSE MAIN INSTALL/TESTING 10/01/2015 APPROVED DSPENCER
PIPE-VALLEY/GUTTER INSTALL 10/01/2015 APPROVED DROCKWELL
FINAL GRADE PRIOR TO SOD 10/01/2015 APPROVED - AS NOTED GLALIMA
Note: WHEN FINAL INSPECTION IS PERFORMED FOR ALL DRAINAGE WE WILL CHECK THIS AGAIN, THE GRADE IN FRONT OF POWER BOX # 1 UNDER FLORIDA LIGHT & POWER . WILL RECHECK DRAINAGE FLOW WHEN RAINING
FINAL GRADE 09/30/2015 APPROVED - AS NOTED GLALIMA
Note: ANY AND ALL ISSUE WILL BE HANDLE AT FINAL WALK .
DRAINAGE PIPE PLACEMENT 09/25/2015 APPROVED - AS NOTED GLALIMA
Note: THIS IS A REINSPECTION ON SITE WITH DON S PASSED
END SECTION 09/25/2015 APPROVED GLALIMA
Note: THIS IS A REINSPECTION ON SITE WITH DON S PASSED
END SECTION 09/21/2015 Disapproved - NO FEE GLALIMA
Note: WILL HAVE SITE MEET 9 / 24 / 2015
DRAINAGE PIPE PLACEMENT 09/21/2015 Disapproved - NO FEE GLALIMA
Note: THIS IS A REINSPECTION WILL HAVE SITE MEET 9 / 24 / 2015
COMPACTION 09/11/2015 APPROVED - AS NOTED GLALIMA
Note: THIS IS A REINSPECTION TESTS REPORTS ENGINEERING IN SYSTEM .
ROAD BASE/DENSITY 09/11/2015 APPROVED - AS NOTED GLALIMA
Note: THIS IS A REINSPECTION REPORT OF DENSITY TEST IN SYSTEM GARY LA LIMA
DRAINAGE PIPE PLACEMENT 09/10/2015 CANCELLED BY APPLICANT CMINI
BLD - SITE STRUCTURE - TRASH DUMPSTER 09/09/2015 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 9/9/2015 10:32:01 AM COMPLETE
BLD - SITE STRUCTURE-SHED/GAZEBO/FOOT BRIDGE 09/09/2015 APPROVED CMINI
Note: THIS IS A REINSPECTION
BLD - SITE STRUCTURE - TRASH DUMPSTER 09/08/2015 Disapproved - NO FEE DROCKWELL
Note: Inspection Resulted at 9/8/2015 3:05:15 PM COULD NOT LOCATE SUPER FOR LOCATIONS
BLD- UNDERGROUND ELEC/GAS 09/08/2015 APPROVED RMARTIN
Note: Inspection Resulted at 9/8/2015 12:31:09 PM NO UNDERGROUND WAS DONE ON THAT SIDE/CLEANING UP PERMIT
BLD - UNDERGROUND SITE LIGHTING CONDUITS 09/08/2015 APPROVED RMARTIN
Note: Inspection Resulted at 9/8/2015 12:31:09 PM NO UNDERGROUND WAS DONE ON THAT SIDE WAS JUST ON PERMIT, CLEANING UP PERMIT
BLD - SITE STRUCTURE-SHED/GAZEBO/FOOT BRIDGE 09/08/2015 Disapproved - NO FEE DROCKWELL
Note: Inspection Resulted at 9/8/2015 3:05:14 PM COULD NOT LOCATE SUPER FOR LOCATIONS
ASPHALT STRIPING 07/17/2015 CANCELLED BY APPLICANT CMINI
ASPHALT PRE-PLACEMENT 07/10/2015 PARTIALLY APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
ASPHALT PRE-PLACEMENT 07/07/2015 PARTIALLY APPROVED JHINDMAN
PRE-CONSTRUCTION -CALL 986-3736 07/01/2015 APPROVED CMINI
Note: THIS IS A REINSPECTION
PRE-CONSTRUCTION -CALL 986-3736 01/23/2015 CANCELLED BY APPLICANT CMINI
Note: Inspection Resulted at 1/23/2015 2:42:07 PM WILL BE RESCHEDULED AT A LATER DATE WHEN THE APPROVED REVISED SET IS READY
ROAD BASE/DENSITY 01/23/2015 CANCELLED BY APPLICANT CMINI
Note: Inspection Resulted at 1/23/2015 2:42:08 PM WILL BE RESCHEDULED AT A LATER DATE WHEN THE APPROVED REVISED SET IS READY
COMPACTION 01/23/2015 CANCELLED BY APPLICANT CMINI
Note: Inspection Resulted at 1/23/2015 2:42:07 PM WILL BE RESCHEDULED AT A LATER DATE WHEN THE APPROVED REVISED SET IS READY

Review History

Department Status Date In Date Out
BLD COMPLETE 04/21/2015 04/22/2015
DSD COMPLETE 04/21/2015 04/23/2015
ENGIN1 COMPLETE 04/21/2015 04/23/2015
Note: Please provide all roadway testing results to City Traffic Engineer.
SW1 COMPLETE 04/21/2015 04/23/2015
UD1 COMPLETE 04/21/2015 04/23/2015
ZON COMPLETE 04/21/2015 04/22/2015
Note: See DSD-Planning for comments, if any.
ENGIN1 COMPLETE 03/31/2015 03/31/2015
DSD COMPLETE 01/13/2015 01/13/2015
ENGIN1 COMPLETE 01/13/2015 01/13/2015
Note: Received Drainage Calculation Document on Tuesday January 13, 2014 from the Engineer of Record, B.S.E. Consultants, Inc.
PLLA COMPLETE 01/13/2015 01/13/2015
UD1 COMPLETE 01/13/2015 01/13/2015
ZON COMPLETE 01/13/2015 01/13/2015

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
INSPECTION 40 ¤2,880.00 01/15/2015
PERMIT FEE ¤125.00 01/15/2015
SITE PLAN 20 ¤20.00 01/15/2015
Fees Total Due: ¤0.00 Total Paid: ¤3,025.00