Permit #2014110129
Permit Details
Status: COED
| CONDITIONED SPACE: 1530 sqft |
| GARAGE: 1438 sqft |
| OPENED PORCH (WITH ROOF) : 239 sqft |
| OPENED PORCH (WITH ROOF) : 237 sqft |
| Total Square Footage: 3444 sqft |
| Subdivision: 2148 - TOWN CENTER PHASE 8 |
| Job Phone: 407-741-8500 |
| Location Address: 427 LANDING BLVD BLDG 6 |
| Type: BM - BUILDING MULTI - APARTMENT |
| Issue Date: 11/25/2014 |
| NOC: RECORDED |
| Applicant name: SCOTT W CULP |
| Owner: FLORIDA LANDMARK COMMUNITIES LLC |
|
Address 145 CITY PLACE PALM COAST, FL 32164 |
|
Address SUITE 300 PALM COAST, FL 32164 |
| Contracted Stated Job Value: ¤224,025.00 |
| Job Description: BUILDING 6 - 2 UNIT APARTMENT OVER 4 GARAGES |
| Type: CN |
Contractor
CPG CONSTRUCTION LLP
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
200 E CANTON AVE # 102 WINTER PARK, FL 32789 |
CGC1512998 (Exp: 08/31/2016) | 407-741-8500 | 407-643-2551 |
Sub Contractors
CHARLES H KULP
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
5401 ENERGY AIR CT ORLANDO, FL 32810 |
CAC018270 (Exp: 08/31/2022) | 407-886-3729 | 407-886-7580 |
RANCE F BORDERICK
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
430 WEST DRIVE ALTAMONTE SPRINGS, FL 32714 |
EC0000981 (Exp: 08/31/2026) | (407)788-3500 | 407-788-2007 |
DAVID A CROSON
| Status | Location Address | State License Number | Phone |
| CANCEL |
31550 COUNTY ROAD 437 SORRENTO, FL 32776 |
CFC1426109 (Exp: 08/31/2022) | 352-729-7100 |
JOSEPH RICHARD CASSIDY JR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
17304 PHIL C PETERS RD WINTER GARDEN, FL 34787 |
CCC1327385 (Exp: 08/31/2020) | 407-654-4426 | (407)654-4307 |
Inspection History
| Type | Request Date | Result | Inspector |
| U - UTILITY COMMERCIAL FINAL | 06/09/2015 | APPROVED | DSPENCER |
| Note: THIS IS A REINSPECTION | |||
| FIRE FINAL | 06/08/2015 | FINAL APPROVED | JHINDMAN |
| U - UTILITY COMMERCIAL FINAL | 06/08/2015 | PARTIALLY APPROVED | DSPENCER |
| Note: Inspection Resulted at 6/8/2015 3:04:16 PM MOVING PLANT BY METER PIT | |||
| PLUMBING FINAL | 06/08/2015 | APPROVED | CMINI |
| HVAC FINAL | 06/08/2015 | APPROVED | CMINI |
| ELECTRIC FINAL | 06/08/2015 | FINAL APPROVED | RMARTIN |
| BUILDING FINAL | 06/08/2015 | FINAL APPROVED | CMINI |
| LDSC- LANDSCAPE FINAL | 05/29/2015 | APPROVED - AS NOTED | WBUTLER |
| Note: Stage 3 of Project-Buildings 4 (2014110127), 5 (2014110128) and 6 (2014110129) 1. Need downspout extensions to direct roof drainage to either a turf area or a paved surface. Will be checked with the Site Development Permit inspection. 2. The disturbed area off-site to the south of the development needs to be stabilized with either seeding and mulching or hydroseeding. 3. Building 6 needs to finish installing the pavers in the front of the building and raising the two holly trees so the top of the rootball is slightly higher than the adjacent pavement. 4. Zone 21 drip zone needs to have a flush valve installed at the location that was discussed in the field. 5. Need a revised card in the irrigation controller that indicates what zone operates what area of the site. Make sure zone numbering agrees with the numbering on the as-built. 6. Need to submit landscape and irrigation as-builts for the project and after they are approved, and all other comments addressed, call in to the Building Department for the final inspection. The above items will need to be completed prior to the approval of the Site Development Permit number 2014090561. | |||
| ELECTRIC - EARLY POWER | 05/14/2015 | APPROVED | RMARTIN |
| Note: Inspection Resulted at 5/14/2015 2:28:08 PM SPOKE TO SUSAN RELEASED POWER METERS A/B | |||
| INSULATION | 04/06/2015 | APPROVED | CMINI |
| FIREWALL | 04/02/2015 | APPROVED | DROCKWELL |
| ALL ROUGH | 04/02/2015 | APPROVED | DROCKWELL |
| ROOF SHEATHING / BRACE / TIE DOWN | 03/27/2015 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 03/26/2015 | CANCELLED BY APPLICANT | DROCKWELL |
| WINDOW NAILING | 03/13/2015 | APPROVED | JHINDMAN |
| EXTERIOR WALL SHEATHING / SHEARWALL | 03/06/2015 | APPROVED | DROCKWELL |
| ROOF SHEATHING / BRACE / TIE DOWN | 03/04/2015 | APPROVED - AS NOTED | DROCKWELL |
| Note: Inspection Resulted at 3/4/2015 11:53:13 AM ROOF SHEATHING ONLY | |||
| GRAVITY SEWER | 01/29/2015 | APPROVED | CMINI |
| U - SEWER TIE IN | 01/29/2015 | APPROVED | DSPENCER |
| ELECTRIC 1ST ROUGH | 01/23/2015 | APPROVED - AS NOTED | DROCKWELL |
| Note: Inspection Resulted at 1/23/2015 11:09:55 AM UNDERGROUND CONDUIT | |||
| PLUMBING 1ST ROUGH | 01/15/2015 | APPROVED - AS NOTED | DROCKWELL |
| Note: Inspection Resulted at 1/15/2015 11:42:27 AM THIS WAS A REPAIR TO A SANITARY LINE AND A RE-TEST | |||
| MONOLITHIC SLAB | 01/14/2015 | APPROVED - AS NOTED | DROCKWELL |
| Note: Inspection Resulted at 1/14/2015 11:13:22 AM DUMPSTER PADS W/REINFORCED BLOCK WALLS-APPROVED | |||
| PLUMBING 1ST ROUGH | 01/06/2015 | APPROVED | CMINI |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 06/03/2015 | 06/08/2015 |
| ELEC | COMPLETE | 05/26/2015 | 05/29/2015 |
| MECH | COMPLETE | 05/26/2015 | 06/02/2015 |
| Note: Revision 3 dated 5-11-15. | |||
| BLD | COMPLETE | 03/05/2015 | 03/09/2015 |
| BLD | COMPLETE | 02/19/2015 | 02/23/2015 |
| ELEC | COMPLETE | 02/19/2015 | 02/20/2015 |
| MECH | COMPLETE | 02/19/2015 | 02/23/2015 |
| Note: Rev.2 (owner's rev.) - deleted garage exhaust fans. | |||
| PLUM | COMPLETE | 02/19/2015 | 02/23/2015 |
| Note: Revision 2 (owner's rev.) - relocated drywell away from condenser units. | |||
| BLD | COMPLETE | 01/12/2015 | 01/12/2015 |
| BLD | COMPLETE | 11/20/2014 | 11/21/2014 |
| ZON | COMPLETE | 11/20/2014 | 11/20/2014 |
| BLD | HOLD | 11/07/2014 | 11/13/2014 |
| Note: 1. Provide florida product approval worksheet andthe roof and floor truss layouts per 2010 FBC 107.2.1. J. Hindman 986-3784. | |||
| ELEC | COMPLETE | 11/07/2014 | 11/12/2014 |
| ENGIN1 | COMPLETE | 11/07/2014 | 11/10/2014 |
| FI1 | COMPLETE | 11/07/2014 | 11/12/2014 |
| MECH | COMPLETE | 11/07/2014 | 11/12/2014 |
| PLUM | COMPLETE | 11/07/2014 | 11/12/2014 |
| UD1 | COMPLETE | 11/07/2014 | 11/10/2014 |
| ZON | HOLD | 11/07/2014 | 11/18/2014 |
| Note: 1. Please revise sheet A0.2 to provide the building square footages in the data table for the garages, breezeways, and fire riser closet on the first and/or second floors. (Similar to the revision provided on Sheet A0.2 attached to building permit 2014070535.) 2. Please Revise sheet A6.1 and any other affected elevation drawing to provide a note notifying the contractor to refer to the approved color elevations attached to the Site Plan Development Order for building colors and color locations. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REVISION | ¤40.00 | 06/09/2015 |
| REVISION | ¤40.00 | 06/09/2015 |
| REVISION | ¤40.00 | 06/09/2015 |
| REVISION | ¤40.00 | 06/09/2015 |
| REVISION | ¤40.00 | 06/09/2015 |
| REVISION | ¤40.00 | 06/09/2015 |
| REVISION | ¤40.00 | 06/09/2015 |
| REVISION | ¤40.00 | 06/09/2015 |
| REVISION | ¤40.00 | 06/09/2015 |
| REVISION | (¤40.00) | 06/09/2015 |
| REVISION | ¤40.00 | 06/09/2015 |
| REVISION | (¤40.00) | 06/09/2015 |
| REVISION | ¤40.00 | 06/09/2015 |
| REVISION | (¤40.00) | 06/09/2015 |
| REVISION | ¤40.00 | 06/09/2015 |
| REVISION | (¤40.00) | 06/09/2015 |
| REVISION | ¤40.00 | 06/09/2015 |
| REVISION | (¤40.00) | 06/09/2015 |
| REVISION | ¤40.00 | 06/09/2015 |
| REVISION | (¤40.00) | 06/09/2015 |
| REVISION | ¤40.00 | 06/09/2015 |
| REVISION | (¤40.00) | 06/09/2015 |
| REVISION | ¤40.00 | 06/09/2015 |
| REVISION | (¤40.00) | 06/09/2015 |
| REVISION | ¤40.00 | 06/09/2015 |
| REVISION | (¤40.00) | 06/09/2015 |
| REVISION | ¤40.00 | 06/09/2015 |
| SURCHARGE FS 533.721 | ¤35.29 | 11/25/2014 |
| SURCHARGE - FS 468.631 | ¤35.29 | 11/25/2014 |
| 3% TRANS IMPACT FEE CREDIT | (¤168.96) | 11/25/2014 |
| ADMIN COMMERCIAL | ¤60.00 | 11/25/2014 |
| ELECTRIC FEE | ¤210.00 | 11/25/2014 |
| 3% FIRE IMPACT FEE CREDIT | (¤12.67) | 11/25/2014 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤422.22 | 11/25/2014 |
| IMPACT FEE PARKS | ¤1,698.48 | 11/25/2014 |
| FIRE PLANS REVIEW | ¤34.44 | 11/25/2014 |
| IMPACT FEE TRANSPORTATION | ¤5,632.14 | 11/25/2014 |
| MECHANICAL FEE | ¤210.00 | 11/25/2014 |
| PERMIT FEE | ¤1,375.00 | 11/25/2014 |
| 3% PARKS IMPACT FEE CREDIT | (¤50.95) | 11/25/2014 |
| PLAN CHECK FEE | ¤287.50 | 11/25/2014 |
| PLUMBING FEE | ¤210.00 | 11/25/2014 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤10,337.78 |