Permit #2014110312

Permit Details

Status: COED

Parcel Id: 07-11-31-7019-RP V -0000
COMMERCIAL SQUARE FOOTAGE: 4250 sqft
Total Square Footage: 4250 sqft
Block: RP V
Subdivision: 2214 - SECTION 19-WYNNFIELD
Job Phone: 321-723-5661
Location Address: 295 PINE LAKES PKWY
Type: BC - BUILDING COMMERCIAL
Issue Date: 02/04/2015
NOC: RECORDED
Applicant name: LUKE MIORELLI
Owner: M & R UNITED INC

Address

402 HIGH POINT DRIVE

COCOA, FL 32926

Address

SUITE 101

COCOA, FL 32926

Lot: 0000
Contracted Stated Job Value: ¤1,045,000.00
Job Description: CONVENIENCE STORE - RETAIL UNITS
Type: CN

Contractor

ME CONSTRUCTION INC.
Status Location Address State License Number Phone Fax
INACTIVE

7607 CORAL DRIVE

WEST MELBOURNE, FL 32904

CGC019528 (Exp: 08/31/2020) 321-723-5661 (321)951-1952

Sub Contractors

MARK G LEIB
Status Location Address State License Number Phone Fax
CANCEL

1045 N. RANGE RD

ROCKLEDGE, FL 32955

EC0000874 (Exp: 08/31/2016) 321-632-6067 321-633-7397
LEONARD G MARX
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

750 OAK HEIGHTS CT

PORT ORANGE, FL 32127

# 310

PORT ORANGE, FL 32127

CAC032453 (Exp: 08/31/2026) (386) 252-1222 (386)756-2931
LAWRENCE GOTTWELLS WALKER III
Status Location Address State License Number Phone Fax
CANCEL

4355 DOW ROAD # 122

MELBOURNE, FL 32934

CFC057837 (Exp: 08/31/2020) 321-652-0149 321-775-3102
STEVEN R SCOTT
Status Location Address State License Number Phone Fax
CANCEL

2185 AVOCADO AVE

MELBOURNE, FL 32935

CCC1326692 (Exp: 08/31/2020) 321-253-5081 321-253-5083

Inspection History

Type Request Date Result Inspector
ELECTRIC FINAL 12/23/2015 FINAL APPROVED RMARTIN
Note: THIS IS A REINSPECTION
U - UTILITY COMMERCIAL FINAL 12/23/2015 APPROVED DSPENCER
Note: THIS IS A REINSPECTION
U - UTILITY COMMERCIAL FINAL 12/14/2015 CANCELLED BY APPLICANT MBACON
Note: Inspection Resulted at 12/14/2015 2:50:21 PM STILL MISSING CLOSEOUT DOCUMENTS FOR
FIRE FINAL 12/14/2015 APPROVED JHINDMAN
ELECTRIC FINAL 12/14/2015 Disapproved - NO FEE RMARTIN
Note: THIS IS A REINSPECTION Inspection Resulted at 12/14/2015 1:18:11 PM NEED PANEL F TO MATCH APPROVED SET OF PLANS, SCHEDULE AND BREAKER PLACEMENT
BUILDING FINAL 12/14/2015 APPROVED JHINDMAN
STOREFRONT 12/03/2015 APPROVED CMINI
Note: THIS IS A REINSPECTION
ELECTRIC 2ND ROUGH 12/03/2015 APPROVED RMARTIN
Note: THIS IS A REINSPECTION
ELECTRIC FINAL 12/03/2015 Disapproved -FEE REQUIRED RMARTIN
Note: Inspection Resulted at 12/3/2015 3:01:50 PM ELECTRIC PANEL B DOES NOT MATCH APPROVED SET OF PLANS,THE EMERGENCY LIGHTS 2X4 ARE NOT WORKING CORRECTLY, THE 120V OUTLET BY CASHIER CHECKOUT SINK NEEDS TO BE GFCI PROTECTED NEC..210.8
PLUMBING FINAL 12/03/2015 APPROVED CMINI
HVAC FINAL 12/03/2015 APPROVED CMINI
U-GREASE INTERCEPTOR PRE-INSTALLATION 07/14/2015 APPROVED DSPENCER
U-GREASE INTERCEPTOR INSTALLED/PLUMBED 07/14/2015 APPROVED DSPENCER
Note: THIS IS A REINSPECTION
U - SEWER TIE IN 07/14/2015 APPROVED DSPENCER
ELECTRIC - EARLY POWER 07/07/2015 APPROVED - AS NOTED RMARTIN
Note: Inspection Resulted at 7/7/2015 9:50:18 AM APPROVED FOR POWER ON METER AND PANELS, ADDVIZED TO ONLY HAVE POWER ON TWO OUTLETS AT THIS TIME, PANELS ARE TO BE LOCKED OUT AT ALL TIMES, BREAKERS OFF, SPOKE TO SUSAN AT FPL 9:35
ABOVE CEILING 07/07/2015 APPROVED JHINDMAN
Note: THIS IS A REINSPECTION
INSULATION 06/22/2015 APPROVED CMINI
Note: THIS IS A REINSPECTION
ABOVE CEILING 06/22/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 6/22/2015 1:35:29 PM RECESS CANS IN SOFIT AND INTERIOR CANS ON BACK WALL LOOKED AT IT.
GRAVITY SEWER 05/20/2015 APPROVED CMINI
PLUMBING 2ND ROUGH 05/19/2015 APPROVED CMINI
HVAC ROUGH 05/19/2015 APPROVED CMINI
ELECTRIC 2ND ROUGH 05/19/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 5/19/2015 2:34:03 PM WALLS ONLY
FRAMING 05/19/2015 APPROVED CMINI
U-GREASE INTERCEPTOR INSTALLED/PLUMBED 05/11/2015 PARTIALLY APPROVED DSPENCER
Note: THIS IS A REINSPECTION Inspection Resulted at 5/11/2015 11:24:47 AM WORK CONTINUES
U-GREASE INTERCEPTOR INSTALLED/PLUMBED 05/07/2015 PARTIALLY APPROVED DSPENCER
Note: THIS IS A REINSPECTION inlet plummed
ROOF SHEATHING / BRACE / TIE DOWN 05/07/2015 APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
STOREFRONT 05/06/2015 APPROVED JCOLASANTI
U-GREASE INTERCEPTOR INSTALLED/PLUMBED 05/06/2015 PARTIALLY APPROVED DSPENCER
Note: Inspection Resulted at 5/6/2015 2:42:27 PM WORK CONTINUES
U-GREASE INTERCEPTOR INSTALLED/PLUMBED 05/05/2015 PARTIALLY APPROVED DSPENCER
Note: Inspection Resulted at 5/5/2015 3:07:37 PM WORK STARTED NOT COMPLETE
U-GREASE INTERCEPTOR PRE-INSTALLATION 05/05/2015 APPROVED DSPENCER
INSULATION 05/05/2015 PARTIALLY APPROVED JCOLASANTI
Note: Inspection Resulted at 5/5/2015 9:24:04 AM INSPECTED R6 INSULATION BEHIND FURRING PER PLAN
STOREFRONT 04/30/2015 Disapproved -FEE REQUIRED JCOLASANTI
Note: Inspection Resulted at 4/30/2015 3:00:17 PM NEED CORRECT APPROVED BY COPC CUT SHEET. SHEETS ON SITE DOES NOT MATCH FIELD SCREW PATTERN INSTALLATION.
FRAMING 04/30/2015 PARTIALLY APPROVED JCOLASANTI
Note: Inspection Resulted at 4/30/2015 3:00:18 PM CHECK NAIL PATTERN FOR CORRECT SPACING. OF BOTTOM FRAMING SHEETS. CHECK AT ALL ROUGH.
FIREWALL 04/30/2015 APPROVED JCOLASANTI
ROOF SHEATHING / BRACE / TIE DOWN 04/21/2015 PARTIALLY APPROVED JCOLASANTI
Note: Inspection Resulted at 4/21/2015 3:32:24 PM NEED REVISION ON REPAIR FOR MTS STRAPS THAT ARE BENT OR NEED TO BE REPLACED WITH TWIST STRAP. NEED STRAP ON TRUSS LEFT FRONT CORNER. NNED BRACING ON LEFT FORNT TRUSSES.
FIREWALL 04/21/2015 PARTIALLY APPROVED JCOLASANTI
Note: Inspection Resulted at 4/21/2015 3:32:24 PM NEED TO CHECK DRYWALL WHEN TAPED AND BOTH SIDES OF WALL ARE COMPLETE.
LINTEL 04/07/2015 APPROVED - AS NOTED JCOLASANTI
Note: THIS IS A REINSPECTION Inspection Resulted at 4/7/2015 10:42:43 AM NEED TO HAVE CITY APPROVED REVISION ON SITE FOR DRIVE THRU WINDOW AT SHEETING INSPECTION.
LINTEL 03/30/2015 PARTIALLY APPROVED JCOLASANTI
Note: Inspection Resulted at 3/30/2015 11:07:16 AM NEED REVISION TO SHOW WINDOW AT EAST SIDE OF BUILDING. NEED TO ADD DOWN ROD SE END OF BUILDING. CHECK AT LENTEL INSPECTION.
FOUNDATION SURVEY - OFFICE USE ONLY 03/27/2015 APPROVED JHINDMAN
MONOLITHIC SLAB 03/20/2015 CANCELLED BY APPLICANT AIRS WEB
MONOLITHIC SLAB 03/19/2015 APPROVED JCOLASANTI
FOOTER 03/18/2015 APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
STEMWALL FOOTING 03/17/2015 APPROVED CMINI
ELECTRIC 1ST ROUGH 03/17/2015 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 3/17/2015 2:32:03 PM CONDUIT UNDER SLAB
PLUMBING 1ST ROUGH 03/11/2015 APPROVED CMINI
FOOTER 03/04/2015 PARTIALLY APPROVED JCOLASANTI
Note: Inspection Resulted at 3/4/2015 11:30:08 AM NEED TO SEE TWO FRONT COLUMN PADS (DETAIL F2). NOT BUILD DUE TO ACCESS TO PAD

Review History

Department Status Date In Date Out
ELEC COMPLETE 12/16/2015 12/16/2015
ELEC COMPLETE 12/11/2015 12/11/2015
BLD COMPLETE 05/04/2015 05/04/2015
BLD COMPLETE 04/06/2015 04/07/2015
ZON COMPLETE 04/06/2015 04/07/2015
SW1 COMPLETE 03/26/2015 03/27/2015
Note: Released By: JHINDMAN FOUNDATION S
BLD COMPLETE 03/04/2015 03/09/2015
ELEC COMPLETE 03/04/2015 03/09/2015
MECH COMPLETE 03/04/2015 03/06/2015
Note: Revision- revised due to change in floor plan.
PLUM COMPLETE 03/04/2015 03/06/2015
Note: Revision due to change in floor plan.
BLD COMPLETE 01/22/2015 01/27/2015
BLD HOLD 01/15/2015 01/21/2015
Note: Provide manufacturers specifications for the one hour shutter. 2010 FBC 107.2.1. J. Hindman 986-3784 3rd request.
BLD HOLD 12/10/2014 12/15/2014
Note: 1. Provide Florida product approvals for the exterior doors, storefront glazing and roofing. 2. Provide the roof truss layout from the truss manufacturer. 3. Provide manufacturers specifications for the one hour shutter. 2010 FBC 107.2.1. J. Hindman 986-3784 2nd request.
ZON COMPLETE 12/10/2014 12/11/2014
PLUM COMPLETE 12/10/2014 12/11/2014
UD1 COMPLETE 12/10/2014 12/11/2014
BLD HOLD 11/13/2014 11/18/2014
Note: 1. Provide Florida product approvals for the exterior doors, storefront glazing and roofing. 2. Provide the roof truss layout from the truss manufacturer. 3. Provide manufacturers specifications for the one hour shutter. 2010 FBC 107.2.1. J. Hindman 986-3784.
ELEC COMPLETE 11/13/2014 11/18/2014
ENGIN1 COMPLETE 11/13/2014 11/13/2014
FI1 COMPLETE 11/13/2014 11/18/2014
MECH COMPLETE 11/13/2014 11/19/2014
PLUM HOLD 11/13/2014 11/19/2014
Note: 1. Provide domestic water riser diagram per 2010 FBC 107.3.5. 2. Provide vent for mop sink per 2010 FBCP 901.2.1.
UD1 HOLD 11/13/2014 11/19/2014
Note: The 1200 square foot retail space should have a separate grease line stub. It will connect to it's own grease interceptor
ZON HOLD 11/13/2014 11/18/2014
Note: A Site Development Permit must be applied for prior to the issuance of a building permit. Please apply for a Site Development permit.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 12/22/2015
REVISION ¤40.00 12/22/2015
REVISION ¤40.00 12/22/2015
REVISION ¤40.00 12/01/2015
REVISION ¤40.00 12/01/2015
REVISION ¤40.00 12/01/2015
REVISION ¤40.00 12/01/2015
REVISION ¤40.00 12/01/2015
REINSPECTION FEE ¤40.00 12/01/2015
SITE PLAN 20 ¤20.00 02/04/2015
SURCHARGE FS 533.721 ¤137.85 02/04/2015
SURCHARGE - FS 468.631 ¤137.85 02/04/2015
3% TRANS IMPACT FEE CREDIT (¤2,300.10) 02/04/2015
ADMIN COMMERCIAL ¤60.00 02/04/2015
ELECTRIC FEE ¤687.00 02/04/2015
ENGINEERING PERMIT FEES ¤120.00 02/04/2015
3% FIRE IMPACT FEE CREDIT (¤34.13) 02/04/2015
IMPACT FEE FIRE NONRESIDENTIAL ¤1,137.73 02/04/2015
FIRE PLANS REVIEW ¤42.50 02/04/2015
IMPACT FEE TRANSPORTATION ¤76,670.13 02/04/2015
MECHANICAL FEE ¤687.00 02/04/2015
PERMIT FEE ¤5,747.50 02/04/2015
PLAN CHECK FEE ¤1,201.75 02/04/2015
PLUMBING FEE ¤687.00 02/04/2015
Fees Total Due: ¤0.00 Total Paid: ¤85,362.08