Permit #2014120009
Permit Details
Status: COED
| Parcel Id: 41-11-31-4975-00000-0010 |
| CONDITIONED SPACE: 53785 sqft |
| Total Square Footage: 53785 sqft |
| Block: 00000 |
| Subdivision: 2272 - ISLAND WALK AT PALM COAST |
| Job Phone: 727-938-9719 |
| Location Address: 250 PALM COAST PKWY NE |
| Type: BC - BUILDING COMMERCIAL |
| Issue Date: 03/06/2015 |
| NOC: RECORDED |
| Applicant name: MICHAEL S BEAUSIR |
| Owner: BRANCH ISLAND WALK ASSOCIATES LP |
|
Address SUITE 600 ATLANTA, GA 30326 |
|
Address 3340 PEACHTREE ROAD NE ATLANTA, GA 30326 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤3,227,100.00 |
| Job Description: COMMERCIAL BUILDING - PUBLIX |
| Type: CN |
Contractor
HAWKINS CONSTRUCTION INC
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1430 L AND R INDUSTRIAL BLVD TARPON SPRINGS, FL 34689 |
CGC061198 (Exp: 08/31/2018) | 727-938-9719 | 727-938-3208 |
Sub Contractors
ROBERT PICKARD
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
12503 CREEKSIDE DRIVE LARGO, FL 33773 |
EC0000488 (Exp: 08/31/2018) | 727-507-0997 | 727-533-8906 |
CHRISTOPHER BLAKE LOVE JR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
6901 49TH AVENUE ST PETERSBURG, FL 33709 |
CMC1249892 (Exp: 08/03/2016) | 727-452-5727 | 727-289-5876 |
ANDREW JASON RODGERS
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
6915 BUSINESS PARK BOULEVARD NORTH JACKSONVILLE, FL 32256 |
CFC057050 (Exp: 08/31/2022) | 904-765-7964 | 904-765-9805 |
MICHAEL L RUSS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 730 DUNNELLON , FL 34432 |
CCC057482 (Exp: 08/31/2026) | 352-489-4274 | 352-489-3466 |
Inspection History
| Type | Request Date | Result | Inspector |
| U-GREASE INTERCEPTOR INSTALLED/PLUMBED | 10/14/2015 | APPROVED | DSPENCER |
| Note: THIS IS A REINSPECTION | |||
| U - UTILITY COMMERCIAL FINAL | 10/14/2015 | FINAL APPROVED | DSPENCER |
| U-GREASE INTERCEPTOR INSTALLED/PLUMBED | 10/07/2015 | PARTIALLY APPROVED | DSPENCER |
| Note: THIS IS A REINSPECTION | |||
| FRAMING | 10/07/2015 | APPROVED - AS NOTED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 10/7/2015 1:18:21 PM COMPLETE | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 10/07/2015 | APPROVED - AS NOTED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 10/7/2015 1:18:21 PM COMPLETE | |||
| INSULATION | 10/07/2015 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 10/7/2015 1:18:20 PM COMPLETE | |||
| STOREFRONT | 10/07/2015 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 10/7/2015 1:18:20 PM COMPLETE | |||
| BUILDING FINAL | 10/07/2015 | FINAL APPROVED | CMINI |
| FIRE FINAL | 10/07/2015 | APPROVED | JHINDMAN |
| HOOD ROUGH | 10/07/2015 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| ELECTRIC FINAL | 10/07/2015 | APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION | |||
| GAS FINAL | 10/05/2015 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| GAS FINAL | 10/01/2015 | CANCELLED BY APPLICANT | JHINDMAN |
| ELECTRIC FINAL | 10/01/2015 | PARTIALLY APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 10/1/2015 3:31:00 PM NEED REVISION SHOWING NEW PANEL SCHEDULES, TESTED EMERGENCY GENERATOR, COUPLE MINOR ISSUES, EXIT LIGHT REAR HALL WEST SIDE NOT WORKING, EMERGENCY LIGHT IN FRONT MANAGERS OFFICE NOT WORKING, SALES FLOOR AND CEILING IS COMPLETE NO ISSUES | |||
| HVAC FINAL | 09/29/2015 | APPROVED | CMINI |
| PLUMBING FINAL | 09/29/2015 | APPROVED | CMINI |
| ELECTRIC FINAL | 09/28/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 9/28/2015 2:22:06 PM CIRCLED ON PLANS, ON TOP OF COOLERS, ROOF AND REAR OF STORE INSIDE AND OUT | |||
| ELECTRIC FINAL | 09/24/2015 | PARTIALLY APPROVED | RMARTIN |
| Note: Inspection Resulted at 9/24/2015 3:02:01 PM MARKED ON PLAN GREEN | |||
| ELECTRIC 2ND ROUGH | 09/11/2015 | APPROVED - AS NOTED | RMARTIN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 9/11/2015 3:34:29 PM MARKED ON PLAN, POWER CAN BE TURNED ON TO CHECKOUT RECEPT. | |||
| ELECTRIC 2ND ROUGH | 09/04/2015 | PARTIALLY APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 9/4/2015 2:54:42 PM SALES AREA COOLERS INTERIOR FLOOR | |||
| ELECTRIC 2ND ROUGH | 09/02/2015 | PARTIALLY APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 9/2/2015 3:21:49 PM MARKED ON PLAN COOLERS, NORTH CEILING, ROOF COOLER CONDENSORS | |||
| HVAC ROUGH | 09/02/2015 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| ABOVE CEILING | 09/02/2015 | APPROVED | CMINI |
| ELECTRIC 2ND ROUGH | 08/31/2015 | PARTIALLY APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 8/31/2015 11:50:00 AM LOOKED AT BAILER CIRCUIT | |||
| ELECTRIC - EARLY POWER | 08/26/2015 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 8/26/2015 1:39:53 PM CALLED FPL TO RELEASE POWER, SPOKE WITH SUSAN | |||
| MONOLITHIC SLAB | 08/26/2015 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 8/26/2015 11:39:53 AM FRONT OF STORE | |||
| ELECTRIC 2ND ROUGH | 08/24/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 8/24/2015 11:37:03 AM CEILING IN BACK COVER UP, GENERATOR CONNECTIONS ONLY | |||
| ELECTRIC 2ND ROUGH | 08/20/2015 | PARTIALLY APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 8/20/2015 3:12:59 PM CHECKED TORQUING AND WIRE SIZES ON ROOF TOP UNITS AND PANELS ALSO CHECKED 500KW GENERATOR WIRE SIZE AND CONECTIONS, READY FOR EARLY POWER JUST ON MDP AND OK TO FIRE UP A COUPLE PANELS FOR LIGHTING AND RECEPT. MARKED ON PLAN | |||
| HVAC ROUGH | 08/20/2015 | PARTIALLY APPROVED | JHINDMAN |
| HOOD ROUGH | 08/20/2015 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION light test | |||
| PLUMBING 2ND ROUGH | 08/19/2015 | APPROVED - AS NOTED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 8/19/2015 12:29:28 PM WALL IN FRONT OF CARD SHOP, DWV AND WATER | |||
| ELECTRIC 2ND ROUGH | 08/19/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 8/19/2015 12:10:09 PM ROOF TOP PANEL, NOT ALL, TORQUING ON MDP ALL GOOD | |||
| ELECTRIC 2ND ROUGH | 08/17/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 8/17/2015 1:01:46 PM BOTH MAIN FLOORING ABOVE CEILING LIGHTING LAYOU IN CEILING GRIDT.. NORTH AND EASTSIDE HALL PANELS TORQUEING | |||
| ELECTRIC 2ND ROUGH | 08/14/2015 | PARTIALLY APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 8/14/2015 3:29:21 PM MAIN BREAKER SIDE OF MAIN SWITCH GEAR, REAR HALL PANELS A,B,C, AND BREAK ROOM PANELS | |||
| ELECTRIC 2ND ROUGH | 08/12/2015 | PARTIALLY APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 8/12/2015 3:19:44 PM MARKED ON PLAN | |||
| FRAMING | 08/12/2015 | PARTIALLY APPROVED | JHINDMAN |
| Note: pharmacy walls | |||
| ELECTRIC 2ND ROUGH | 08/11/2015 | PARTIALLY APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 8/11/2015 2:31:07 PM PHARMACY WALLS ONLY | |||
| FRAMING | 08/10/2015 | APPROVED | JHINDMAN |
| Note: front column framing | |||
| FRAMING | 08/07/2015 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| FRAMING | 07/30/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 7/30/2015 12:38:58 PM TOWER FRAMING AND HAT CHANNEL | |||
| FRAMING | 07/24/2015 | CANCELLED BY APPLICANT | AIRS WEB |
| Note: THIS IS A REINSPECTION | |||
| FRAMING | 07/23/2015 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 7/23/2015 2:51:46 PM FACADE ELEVATION | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 07/16/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 7/16/2015 11:11:21 AM PLYWOOD SHEATHING ON TOWER | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 07/14/2015 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 7/14/2015 2:40:02 PM ROOF FRAMING ON GROUND BEFORE LIFTED UP | |||
| FRAMING | 07/09/2015 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION front bathroom ceilings | |||
| DOWN CELL | 07/09/2015 | APPROVED | JHINDMAN |
| Note: riser room | |||
| ELECTRIC 2ND ROUGH | 07/09/2015 | CANCELLED BY APPLICANT | RMARTIN |
| Note: THIS IS A REINSPECTION | |||
| ELECTRIC 2ND ROUGH | 07/02/2015 | PARTIALLY APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 7/2/2015 3:05:58 PM SALES AREA CONDUIT IN CEILING FOR TWIST LOCK OUTLETS FOR FLORESCENT LIGHTS, AND CONDUCTORS FOR THE TEMP POWER ON THOSE LIGHTS | |||
| ELECTRIC 2ND ROUGH | 07/01/2015 | PARTIALLY APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 7/1/2015 3:18:36 PM INTERIOR WALLS MARKED ON PLAN | |||
| ELECTRIC 2ND ROUGH | 06/29/2015 | PARTIALLY APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 6/29/2015 10:18:32 AM MARKED ON PLAN REAR WEST CORNER PANELS AND WALL | |||
| PLUMBING 2ND ROUGH | 06/29/2015 | PARTIALLY APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION partial sinks at seafood an cooler to the left of it. | |||
| GRAVITY SEWER | 06/25/2015 | APPROVED | CMINI |
| FRAMING | 06/25/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 6/25/2015 1:26:38 PM BATH ROOMS AND OFFICES | |||
| MONOLITHIC SLAB | 06/25/2015 | APPROVED - AS NOTED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 6/25/2015 1:26:39 PM EMERGENCY GENERATOR PAD | |||
| ELECTRIC 2ND ROUGH | 06/24/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 6/24/2015 12:08:08 PM FRONT OFFICES AND FISH DEPT, HIGHLIGHTED ON PLAN | |||
| GRAVITY SEWER | 06/22/2015 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 6/22/2015 1:43:18 PM TO GREASE | |||
| U-GREASE INTERCEPTOR INSTALLED/PLUMBED | 06/19/2015 | PARTIALLY APPROVED | DSPENCER |
| Note: Inspection Resulted at 6/19/2015 9:21:52 AM PLUMBING OF THE TANK IS COMPLETE TO STANDARD | |||
| ELECTRIC 2ND ROUGH | 06/18/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 6/18/2015 3:14:35 PM PARTIAL HIGHLIGHTED ON PLAN | |||
| FRAMING | 06/18/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 6/18/2015 3:14:34 PM PARTIAL HIGHLIGHTED ON PLAN | |||
| PLUMBING 2ND ROUGH | 06/17/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 6/17/2015 2:51:14 PM HIGHLIGHTED ON PLAN | |||
| PLUMBING 2ND ROUGH | 06/15/2015 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 6/15/2015 11:33:08 AM BATH RM WALLS | |||
| ELECTRIC 2ND ROUGH | 06/15/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 6/15/2015 11:33:06 AM PARTIAL BOXES CIRCLED ON PLAN | |||
| MONOLITHIC SLAB | 06/15/2015 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 6/15/2015 11:33:07 AM LOADING DOCK RAMP | |||
| FRAMING | 06/12/2015 | PARTIALLY APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 6/12/2015 1:14:28 PM CANTILEVER FRAMING IN PUBLIX | |||
| ELECTRIC 2ND ROUGH | 06/12/2015 | PARTIALLY APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 6/12/2015 11:50:34 AM FRONT DOOR CEILING WITH RECESS CANS ONLY AND HALF OF WEST CEILING INTERIOR RECESS CANS | |||
| ELECTRIC 2ND ROUGH | 06/11/2015 | PARTIALLY APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 6/11/2015 2:08:26 PM INTERIOR WALLS MARKED ON PLAN | |||
| HVAC ROUGH | 06/11/2015 | APPROVED - AS NOTED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 6/11/2015 2:10:44 PM DUCT WRAP AND METAL DUCT IN CONDITIONED AREA | |||
| DOWN CELL | 06/10/2015 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 6/10/2015 11:04:22 AM LOADING DOCK WALL | |||
| MONOLITHIC SLAB | 06/09/2015 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 6/9/2015 2:09:34 PM GENERATOR PAD | |||
| MONOLITHIC SLAB | 06/08/2015 | APPROVED - AS NOTED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 6/8/2015 10:20:06 AM EXTERIOR STAIR LANDINGS | |||
| PLUMBING 1ST ROUGH | 06/08/2015 | APPROVED - AS NOTED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 6/8/2015 10:20:05 AM TRASH COMPACTOR DRAINS | |||
| ELECTRIC 2ND ROUGH | 06/08/2015 | PARTIALLY APPROVED | RMARTIN |
| Note: Inspection Resulted at 6/8/2015 10:36:01 AM UNDERGROUND FOR GENERATOR/CONDUIT | |||
| DOWN CELL | 06/04/2015 | APPROVED - AS NOTED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 6/4/2015 2:18:33 PM BLOCKED IN TEMP OPENING | |||
| DOWN CELL | 06/03/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 6/3/2015 2:54:28 PM HIGHLIGHTED ON PLAN | |||
| FRAMING | 06/03/2015 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 6/3/2015 2:54:28 PM HIGHLIGHTED ON PLAN | |||
| MONOLITHIC SLAB | 06/03/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 6/3/2015 2:54:29 PM HIGHLIGHTED ON PLAN | |||
| FOOTER | 06/02/2015 | APPROVED - AS NOTED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 6/2/2015 12:26:12 PM LOADING DOCK RETAINING WALL FOOTERS AND STAIRS FOOTER | |||
| FOOTER | 05/28/2015 | CANCELLED BY APPLICANT | CMINI |
| Note: THIS IS A REINSPECTION | |||
| HOOD ROUGH | 05/28/2015 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 5/28/2015 9:33:55 AM HOOD LIGHT TEST | |||
| HVAC ROUGH | 05/27/2015 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 5/27/2015 2:37:28 PM PARTIAL HIGHLIGHTED ON PLAN | |||
| GAS ROUGH | 05/27/2015 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 5/27/2015 2:37:27 PM PARTIAL HIGHLIGHTED ON PLAN | |||
| U-GREASE INTERCEPTOR PRE-INSTALLATION | 05/22/2015 | APPROVED | DSPENCER |
| ROOF SHEATHING / BRACE / TIE DOWN | 05/19/2015 | APPROVED - AS NOTED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 5/19/2015 11:56:07 AM ROOF IN PROGRESS NEAR COMPLETIAN | |||
| ELECTRIC TEMP POLE | 05/19/2015 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 5/19/2015 11:56:08 AM NEED RISER DIAGRAHM FOR TEMP PANEL BEING THAT IT WILL REMAIN TILL THE END OF JOB, AND CALL IN FOR ANOTHER INSPECTION WHEN PAPERWORK IS APPROVED AND GENERATOR IS DELIVERED | |||
| MONOLITHIC SLAB | 05/18/2015 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 5/18/2015 2:26:11 PM ALL INTERIOR SLABS | |||
| MONOLITHIC SLAB | 05/14/2015 | APPROVED - AS NOTED | DROCKWELL |
| Note: THIS IS A REINSPECTION Inspection Resulted at 5/14/2015 3:10:57 PM MARKED AND DATED ON PLANS | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 05/14/2015 | PARTIALLY APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 05/13/2015 | PARTIALLY APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION Inspection Resulted at 5/13/2015 3:21:25 PM 16 FASTENERS PER SHEET OK HOT MOPING IN PROGRESS | |||
| MONOLITHIC SLAB | 05/13/2015 | APPROVED - AS NOTED | DROCKWELL |
| Note: THIS IS A REINSPECTION Inspection Resulted at 5/13/2015 3:21:24 PM MARKED AND DATED ON PLAN | |||
| MONOLITHIC SLAB | 05/12/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 5/12/2015 11:36:10 AM PARTIAL INTERIOR SLAB | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 05/12/2015 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 5/12/2015 11:36:09 AM INSUL BOARD SCREW DOWN BACK OF ROOF AREA | |||
| MONOLITHIC SLAB | 05/11/2015 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 5/11/2015 1:06:03 PM PARTIAL SLAB | |||
| MONOLITHIC SLAB | 05/08/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 5/8/2015 2:48:27 PM PARTIAL HIGHLIGHTED ON PLAN | |||
| LINTEL | 05/07/2015 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 5/7/2015 2:31:43 PM TOP OUT | |||
| MONOLITHIC SLAB | 05/07/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 5/7/2015 2:31:42 PM PARTIAL | |||
| ELECTRIC 1ST ROUGH | 05/07/2015 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 5/7/2015 2:31:43 PM SLAB READY | |||
| LINTEL | 05/06/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 5/6/2015 10:57:39 AM PARTIAL ON REAR WALL UP TO 3RD CJ | |||
| LINTEL | 05/05/2015 | PARTIALLY APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 5/5/2015 1:41:35 PM REAR WALL OF PUBLIX WEST HALF OF WALL | |||
| LINTEL | 05/04/2015 | CANCELLED BY APPLICANT | CMINI |
| Note: THIS IS A REINSPECTION | |||
| LINTEL | 05/01/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 5/1/2015 2:53:28 PM PARTIAL TOP OUT | |||
| LINTEL | 04/30/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 4/30/2015 10:21:06 AM TOP OUT PARTIAL | |||
| MONOLITHIC SLAB | 04/30/2015 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 4/30/2015 10:21:05 AM COOLER PADS | |||
| LINTEL | 04/29/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 4/29/2015 11:16:45 AM PARTIAL HIGHLIGHTED ON PLAN DECK HIEGHT | |||
| LINTEL | 04/28/2015 | CANCELLED BY APPLICANT | CMINI |
| Note: THIS IS A REINSPECTION | |||
| LINTEL | 04/27/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 4/27/2015 1:09:02 PM PARTIAL ROOF DECK HIEGHT | |||
| LINTEL | 04/24/2015 | PARTIALLY APPROVED | JHINDMAN |
| Note: Inspection Resulted at 4/24/2015 12:56:07 PM LINTEL COURSE AT DECK LEFT SIDE OF REAR WALL | |||
| DOWN CELL | 04/24/2015 | CANCELLED BY APPLICANT | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| DOWN CELL | 04/23/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 4/23/2015 1:34:12 PM PARTIAL HIGHLIGHTED ON PLAN BOND BEAM COURSE LEVEL WITH DECK | |||
| ELECTRIC 1ST ROUGH | 04/23/2015 | PARTIALLY APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 4/23/2015 2:49:30 PM LOOKED AT UNDERGROUND CONDUIT FOR FROZEN FOODS AND PHARMACY | |||
| DOWN CELL | 04/22/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 4/22/2015 11:29:03 AM 4TH LIFT PARTIAL HIGHLIGHTED ON PLAN | |||
| DOWN CELL | 04/21/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 4/21/2015 3:03:02 PM 4TH LIFT HIGHLIGHTED ON PLAN | |||
| FOUNDATION SURVEY - OFFICE USE ONLY | 04/21/2015 | APPROVED | JHINDMAN |
| PLUMBING 1ST ROUGH | 04/20/2015 | CANCELLED BY APPLICANT | CMINI |
| Note: THIS IS A REINSPECTION | |||
| ELECTRIC 1ST ROUGH | 04/20/2015 | PARTIALLY APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 4/20/2015 2:12:43 PM PART OF FLOOR DUCT CONDUIT, WEST WALL PANEL FEEDER CONDUITS, COLUMB CONDUIT UG | |||
| DOWN CELL | 04/20/2015 | CANCELLED BY APPLICANT | CMINI |
| Note: THIS IS A REINSPECTION | |||
| DOWN CELL | 04/17/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 4/17/2015 1:49:20 PM PARTIAL HIGHLIGHTED ON PLAN, 4 TH LIFT | |||
| DOWN CELL | 04/16/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 4/16/2015 11:32:57 AM PARTIAL HIGHLIGHTED ON PLAN | |||
| ELECTRIC 1ST ROUGH | 04/16/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 4/16/2015 11:32:59 AM PARTIAL HIGHLIGHTED ON PLAN | |||
| PLUMBING 1ST ROUGH | 04/16/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 4/16/2015 11:32:58 AM PARTIAL HIGHLIGHTED ON PLAN | |||
| ELECTRIC 1ST ROUGH | 04/15/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 4/15/2015 2:58:08 PM UNDERGROUND CONDUIT HIGHLIGHTED ON PLAN | |||
| DOWN CELL | 04/15/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 4/15/2015 2:58:08 PM HIGHLIGHTED ON PLAN | |||
| DOWN CELL | 04/14/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 4/14/2015 12:12:41 PM 3RD LIFT HIGHLIGHTED ON PLAN | |||
| DOWN CELL | 04/13/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 4/13/2015 1:53:16 PM REAR RIGHT WALL | |||
| DOWN CELL | 04/09/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 4/9/2015 2:57:12 PM DOWN CELL HIGHLIGHTED ON PLAN | |||
| ELECTRIC 1ST ROUGH | 04/09/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 4/9/2015 2:57:11 PM UNDER SLAB HIGHLIGHTED ON PLAN | |||
| PLUMBING 1ST ROUGH | 04/09/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 4/9/2015 2:57:12 PM 1ST ROUGH HIGHLIGHTED ON PLAN | |||
| DOWN CELL | 04/08/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 4/8/2015 12:00:52 PM 3RD LIFT HIGHLIGHTED ON PLAN | |||
| DOWN CELL | 04/07/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 4/7/2015 11:55:38 AM PARTIAL HIGHLIGHTED ON PLAN | |||
| FOOTER | 04/07/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 4/7/2015 11:55:37 AM PARTIAL HIGHLIGHTED ON PLAN | |||
| PLUMBING 1ST ROUGH | 04/07/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 4/7/2015 11:55:38 AM PARTIAL HIGHLIGHTED ON PLAN | |||
| DOWN CELL | 04/06/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 4/6/2015 1:28:28 PM PARTIAL DOWN CELL AND STEEL FOR EYEBROW HIGHLIGHTED ON PLAN | |||
| DOWN CELL | 04/02/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 4/2/2015 3:03:06 PM PARTIAL HIGHLIGHTED ON PLAN | |||
| PLUMBING 1ST ROUGH | 04/02/2015 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 4/2/2015 3:03:06 PM PARTIAL HIGHLIGHTED ON PLAN | |||
| ELECTRIC 1ST ROUGH | 04/02/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 4/2/2015 3:03:07 PM PARTIAL HIGHLIGHTED ON PLAN UNDERGROUND CONDUIT | |||
| ELECTRIC 1ST ROUGH | 03/31/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 3/31/2015 12:22:24 PM PARTIAL CONDUIT UNDER SLAB HIGHLIGHTED ON PLAN | |||
| DOWN CELL | 03/31/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 3/31/2015 12:22:24 PM 1ST LIFT PARTIAL HIGHLIGHTED ON PLAN | |||
| DOWN CELL | 03/27/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 3/27/2015 2:04:58 PM 1ST LIFT DOWN CELL STEEL | |||
| DOWN CELL | 03/26/2015 | PARTIALLY APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 3/26/2015 12:50:51 PM PARTIAL FIRST LIFT | |||
| ELECTRIC 1ST ROUGH | 03/26/2015 | PARTIALLY APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 3/26/2015 12:03:26 PM LOOKED AT BRANCH CIRCUIT UNDERGROUND CONDUIT AT MDP LOCATION | |||
| FOOTER | 03/25/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION..partial highlighted on plan, loading dock | |||
| STEMWALL FOOTING | 03/20/2015 | APPROVED - AS NOTED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 3/20/2015 10:53:11 AM FINISHED FLOOR HIGHT ON ALL PERIMETER | |||
| STEMWALL FOOTING | 03/19/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 3/19/2015 10:09:03 AM PARTIAL TO FINISH FLOOR HIGHT UP TO FIRST DOOR, EAST SIDE | |||
| DOWN CELL | 03/18/2015 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 3/18/2015 11:34:14 AM SOUTH AND WEST SIDE FINISHED FLOOR HIEGHT | |||
| STEMWALL FOOTING | 03/18/2015 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 3/18/2015 11:34:14 AM SOUTH AND WEST SIDE FINISHED FLOOR HIEGHT | |||
| ELECTRIC 1ST ROUGH | 03/18/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 3/18/2015 11:34:15 AM UNDERGROUND CONDUIT TO TRANSFORMER | |||
| FOOTER | 03/16/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 3/16/2015 1:54:59 PM CLOSE UP PERIMETER FOOTER | |||
| FOOTER | 03/13/2015 | PARTIALLY APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 3/13/2015 3:09:23 PM PARTIAL FRONT, LEFT SIDE AND ISOLATED PADS, SEE PLANS FOR LOCATIONS | |||
| FOOTER | 03/12/2015 | PARTIALLY APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 3/12/2015 3:26:24 PM SEE PLAN | |||
| ELECTRIC 1ST ROUGH | 03/12/2015 | PARTIALLY APPROVED | JHINDMAN |
| Note: Inspection Resulted at 3/12/2015 3:26:23 PM UUFER GROUND | |||
| FOOTER | 03/11/2015 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 3/11/2015 1:51:06 PM PARTIAL ON COLUMN FOOTERS HIGHLIGHTED ON PLAN |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 10/07/2015 | 10/07/2015 |
| BLD | COMPLETE | 03/02/2015 | 03/06/2015 |
| MECH | COMPLETE | 03/02/2015 | 03/03/2015 |
| PLUM | COMPLETE | 03/02/2015 | 03/03/2015 |
| ELEC | COMPLETE | 02/05/2015 | 02/05/2015 |
| ZON | COMPLETE | 02/05/2015 | 02/06/2015 |
| MECH | HOLD | 02/05/2015 | 02/05/2015 |
| Note: Previous comment dated 12-3-14 shall be addressed. Kitchen exhaust hoods shall be applied under separate permit per 2010 FBC 107.2.1. Provide plans, details, notes and all relevant information related to exhaust kitchen hood which maybe taken from the original permit application 2014120009. | |||
| BLD | HOLD | 02/05/2015 | 02/05/2015 |
| Note: 1. Provide all cold formed truss anchor connection details. 20/HS5-02. 2. Provide all cold formed framing anchor details. 20/HS5-02. 3. Provide the stud to continuous angle connection detail 1/HS5-01. 4. Provide steel beam to column connection detail 6/ HS4-01. 5. Provide the stud to continuous angle connection detail 9/HS4-01 7. Provide metal stud ties, size spacing and connection details 7. HS5-02. 8 Provide the pre engineered metal truss layout from the truss manufacturer. 2010 FBC 107.2.1 and 107.3.5. 2nd request. | |||
| PLUM | HOLD | 02/05/2015 | 02/05/2015 |
| Note: Previous comment dated 12-4-14 shall be addressed. 1. Gas contractor shall verify the availability of natural gas to be used and if not available, gas riser diagram for propane gas shall be provided per 2010 FBC 107.3.5. | |||
| PLLA | COMPLETE | 02/05/2015 | 02/13/2015 |
| Note: Released By: WBUTLER | |||
| BLD | HOLD | 12/01/2014 | 12/03/2014 |
| Note: 1. Provide all cold formed truss anchor connection details. 20/HS5-02. 2. Provide all cold formed framing anchor details. 20/HS5-02. 3. Provide the stud to continuous angle connection detail 1/HS5-01. 4. Provide steel beam to column connection detail 6/ HS4-01. 5. Provide the stud to continuous angle connection detail 9/HS4-01 7. Provide metal stud ties, size spacing and connection details 7. HS5-02. 8 Provide the pre engineered metal truss layout from the truss manufacturer. 2010 FBC 107.2.1 and 107.3.5. | |||
| ELEC | COMPLETE | 12/01/2014 | 12/04/2014 |
| ENGIN1 | COMPLETE | 12/01/2014 | 12/02/2014 |
| FI1 | COMPLETE | 12/01/2014 | 12/03/2014 |
| MECH | HOLD | 12/01/2014 | 12/03/2014 |
| Note: Kitchen exhaust hoods shall be applied under separate permit per 2010 FBC 107.2.1. Provide plans, details, notes and all relevant information related to exhaust kitchen hood which maybe taken from the original permit application 2014120009. | |||
| PLLA | HOLD | 12/01/2014 | 12/15/2014 |
| Note: 12/15/14 Permit #2014120009 1. The plans reference fixtures that do not have details and pictures of what they look like so we can determine if they meet our outdoor lighting requirements for full cut-off and no glare onto adjacent properties. The following fixtures do not have the requested details on these plans or the previously approved plans on file: E-1, F-1, NN, N, EM-24, Y, S-22, and EB-25 Please provide these details in the re-submittal. | |||
| PLUM | HOLD | 12/01/2014 | 12/04/2014 |
| Note: 1. Gas contractor shall verify the availability of natural gas to be used and if not available gas riser diagram for propane gas shall be provided per 2010 FBC 107.3.5. | |||
| UD1 | COMPLETE | 12/01/2014 | 12/04/2014 |
| ZON | HOLD | 12/01/2014 | 12/03/2014 |
| Note: 1. Please include a set of exterior elevations consistent with the elevations approved with the Site Plan Development Order plan set (Application 2747). |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| MISCELLANEOUS | ¤500.00 | 10/07/2015 |
| PERMIT FEE | ¤32,626.00 | 03/06/2015 |
| PLAN CHECK FEE | ¤6,821.80 | 03/06/2015 |
| PLUMBING FEE | ¤3,619.20 | 03/06/2015 |
| SITE PLAN 20 | ¤20.00 | 03/06/2015 |
| SURCHARGE FS 533.721 | ¤757.28 | 03/06/2015 |
| SURCHARGE - FS 468.631 | ¤757.28 | 03/06/2015 |
| ADMIN COMMERCIAL | ¤60.00 | 03/06/2015 |
| ELECTRIC FEE | ¤3,619.20 | 03/06/2015 |
| ENGINEERING PERMIT FEES | ¤120.00 | 03/06/2015 |
| FIRE PLANS REVIEW | ¤537.85 | 03/06/2015 |
| MECHANICAL FEE | ¤3,619.20 | 03/06/2015 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤53,057.81 |