I want to search for...
Permit #2014120393
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7064-00380-0020 |
| CONDITIONED SPACE: 384 sqft |
| Total Square Footage: 384 sqft |
| Block: 00380 |
| Subdivision: - |
| Job Phone: 386-437-2997 |
| Location Address: 39 LLEWELLYN TR |
| Type: BA - BUILDING ADDITION |
| Issue Date: 01/08/2015 |
| NOC: RECORDED |
| Applicant name: THOMAS CHARLES TALLAKSEN JR. |
| Owner: CAIN RANDALL & CAROL H&W |
|
Address 39 LLEWELLYN TRAIL PALM COAST, FL 32164 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤18,000.00 |
| Job Description: 8 X 48 ADDITION TO REAR |
| Type: CN |
Contractor
TALLY'S CONSTRUCTION CO
| Status | Location Address | State License Number | Phone |
| INACTIVE |
503 SOUTH OLD DIXIE HWY BUNNELL, FL 32110 |
CRC1330234 (Exp: 08/31/2024) | 386-931-2990 |
Sub Contractors
JOHN EDWARD GAMBONE
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
15 HARGROVE LN PALM COAST, FL 32137 |
1G PALM COAST, FL 32137 |
EC13006037 (Exp: 08/31/2026) | 386-586-9144 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
2 HARGROVE GRADE PALM COAST, FL 32136 |
CAC048127 (Exp: 08/31/2018) | 386-445-5023 | 386-446-4614 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1351 HAZELNUT ST BUNNELL, FL 32110 |
CFC1427527 (Exp: 08/31/2026) | 386-445-2532 | 386-445-5575 |
THOMAS CHARLES TALLAKSEN JR.
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
503 SOUTH OLD DIXIE HWY BUNNELL, FL 32110 |
CCC1327743 (Exp: 08/31/2024) | 386-931-2990 | (386)437-2279 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 11/10/2015 | FINAL APPROVED | MBACON |
| BLD - BUILDING FINAL | 11/09/2015 | FINAL APPROVED | DROCKWELL |
| FINAL SURVEY (OFFICE USE ONLY) | 07/27/2015 | APPROVED | DREWIS |
| LATH/BRICK/ WATER BARRIER | 03/18/2015 | APPROVED | DROCKWELL |
| INSULATION | 03/18/2015 | APPROVED | DROCKWELL |
| ALL ROUGH | 03/09/2015 | APPROVED - AS NOTED | DROCKWELL |
| Note: Inspection Resulted at 3/9/2015 11:00:05 AM REVISE ELECTRIC AND HAVE CITY STAMP-CHECK AT INSULATION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/16/2015 | APPROVED | DROCKWELL |
| TIE BEAM / LINTEL | 02/09/2015 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| TIE BEAM / LINTEL | 02/05/2015 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Inspection Resulted at 2/5/2015 11:47:31 AM PLUMBING VENT PIPE MUST BE GLUED IN PLACE PER FBC-PLUMBING | |||
| FOUND SURVEY APPROVED (OFFICE) | 02/04/2015 | APPROVED | JHINDMAN |
| MONOLITHIC SLAB | 01/22/2015 | APPROVED | DROCKWELL |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/20/2015 | APPROVED | DROCKWELL |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 07/27/2015 | 07/27/2015 |
| Note: Released By: DREWIS final survey | |||
| ELEC | COMPLETE | 03/16/2015 | 03/16/2015 |
| ELEC | HOLD | 03/13/2015 | 03/16/2015 |
| Note: 1. Provide receptacle on patio. 2008 NEC 210.52 E 3. | |||
| PLUM | COMPLETE | 03/13/2015 | 03/16/2015 |
| SW1 | COMPLETE | 02/04/2015 | 02/04/2015 |
| Note: Released By: JHINDMAN foundation s | |||
| PLUM | COMPLETE | 01/06/2015 | 01/08/2015 |
| PLUM | HOLD | 12/30/2014 | 01/05/2015 |
| Note: The sanitary riser diagram shown on sheet A-4 does not show the venting of lavatory at new bathroom as previously commented. - Lavatory shall be vented per 2010 FBCR P3101.2. | |||
| PLUM | HOLD | 12/22/2014 | 12/22/2014 |
| Note: Lavatory shal be vented per 2010 FBCR P3101.2. | |||
| BLD | COMPLETE | 12/22/2014 | 12/22/2014 |
| BLD | HOLD | 12/16/2014 | 12/18/2014 |
| Note: 1. Provide the roof truss layout from the truss manufacturer. 2010 FBC 107.2.1. | |||
| ELEC | COMPLETE | 12/16/2014 | 12/17/2014 |
| MECH | COMPLETE | 12/16/2014 | 12/17/2014 |
| PLUM | HOLD | 12/16/2014 | 12/17/2014 |
| Note: Provide sanitary riser diagram with signature and license number of plumbing contractor per 2010 FBC 107.2.1. | |||
| SW1 | COMPLETE | 12/16/2014 | 12/17/2014 |
| ZON | COMPLETE | 12/16/2014 | 12/17/2014 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REVISION | ¤40.00 | 03/17/2015 |
| REVISION | ¤40.00 | 03/17/2015 |
| REINSPECTION FEE | ¤40.00 | 03/17/2015 |
| REMODEL/ADDITION/ACCES INSPECT | ¤40.00 | 01/08/2015 |
| SITE PLAN 20 | ¤20.00 | 01/08/2015 |
| SURCHARGE FS 533.721 | ¤5.36 | 01/08/2015 |
| SURCHARGE - FS 468.631 | ¤5.36 | 01/08/2015 |
| STORM WATER PERMIT FEES | ¤80.00 | 01/08/2015 |
| ADMIN FEE | ¤20.00 | 01/08/2015 |
| ELECTRIC FEE | ¤85.80 | 01/08/2015 |
| MECHANICAL FEE | ¤85.80 | 01/08/2015 |
| PLAN CHECK FEE | ¤40.00 | 01/08/2015 |
| PLUMBING FEE | ¤85.80 | 01/08/2015 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤588.12 |